Skip to main content
NurPhoto Agency Logo
  • Home
  • Editorial Pictures
    Categories
    • Unrest, Conflicts and War
    • Arts, Culture and Entertainment
    • Sports
    All Categories
    Unrest, Conflicts and War
    Farming in southeastern Ukraine in spring. 42 photos NEW
    Mar 25, 2026

    Farming in southeastern Ukraine in spring.

    Russian troops attack Ivano-Frankivsk with drones. 16 photos NEW
    Mar 25, 2026

    Russian troops attack Ivano-Frankivsk with drones.

    Russian army launches combined strike on Zaporizhzhia. 16 photos NEW
    Mar 25, 2026

    Russian army launches combined strike on Zaporizhzhia.

    Unmanned and robotic systems unit of the 225th Assault Regiment in action. 35 photos NEW
    Mar 25, 2026

    Unmanned and robotic systems unit of the 225th Assault Regiment in action.

    Bifest Sign Outside Historic Building 4 photos NEW
    Mar 25, 2026

    Bifest Sign Outside Historic Building

    Tarta Relena 10th Anniversary Concert In Sala Apolo - Barcelona 38 photos
    Mar 24, 2026

    Tarta Relena 10th Anniversary Concert In Sala Apolo - Barcelona

    Deadletter Perform Live In Milan, Italy 8 photos
    Mar 24, 2026

    Deadletter Perform Live In Milan, Italy

    Kolkata Knight Riders Team Fan Meet. 9 photos
    Mar 24, 2026

    Kolkata Knight Riders Team Fan Meet.

    Oldham Athletic v Notts County FC - Sky Bet League Two 59 photos NEW
    Mar 25, 2026

    Oldham Athletic v Notts County FC - Sky Bet League Two

    Real Madrid CF v FC Barcelona - UEFA Women's Champions League 2025/26 Quarter-finals First Leg 16 photos NEW
    Mar 25, 2026

    Real Madrid CF v FC Barcelona - UEFA Women's Champions League 2025/26 Quarter-finals First Leg

    Women Short Program - ISU Figure Skating World Championships 2026. 57 photos NEW
    Mar 25, 2026

    Women Short Program - ISU Figure Skating World Championships 2026.

    Malta v Luxembouirg - UEFA Nations League Play-offs 26 photos NEW
    Mar 25, 2026

    Malta v Luxembouirg - UEFA Nations League Play-offs

    View all in Unrest, Conflicts and War Browse All Galleries
  • News of the Week
  • Wire
  • Videos
    • My Boards
    • Loading...
    • View All Boards
  • Login
  • Register

Search Editorial Photos

Keywords Enter keywords to search our editorial photo archive
Category
  1. Home
  2. Search
  3. section damaged

Refine Results

Active Filters:
Sort By
Content Type
Location
People

"section damaged"

784 professional editorial images found

Loading search results...
Workers prepare to lift a section of a pipe at Kyiv CHPP-4, which is severely damaged in a massive Russian missile attack in Kyiv, Ukraine,... Editorial
Severely damaged Darnytska CHPP in Kyiv after massive Russian attack
6 Feb 2026 · Kyiv, Ukraine
#13281012
Workers prepare to lift a section of a pipe at Kyiv CHPP-4, which is severely damaged in a massive Russian missile attack in Kyiv, Ukraine,...

#13281012

6 Feb 2026

Workers prepare to lift a section of a pipe at Kyiv CHPP-4, which is severely damaged in a massive Russian missile attack in Kyiv, Ukraine, on February 6, 2026. On the night of February 2-3, Russian forces strike the heating system of Kyiv CHPP-4 (Darnytska CHPP) with five ballistic missiles, causing critical damage and forcing its shutdown. As a result, 1,129 residential buildings in Dniprovskyi and part of Darnytskyi districts, along with 46 schools, 72 kindergartens, 18 medical institutions, and other social and urban infrastructure facilities, are left without heating and hot water amid temperatures of -25?C.


Restricted to Editorial Use Only.
Commercial use is not permitted without prior authorization.
Please contact us for more information.


Workers prepare to lift a section of a pipe at Kyiv CHPP-4, which is severely damaged in a massive Russian missile attack in Kyiv, Ukraine,... Editorial
Severely damaged Darnytska CHPP in Kyiv after massive Russian attack
6 Feb 2026 · Kyiv, Ukraine
#13281013
Workers prepare to lift a section of a pipe at Kyiv CHPP-4, which is severely damaged in a massive Russian missile attack in Kyiv, Ukraine,...

#13281013

6 Feb 2026

Workers prepare to lift a section of a pipe at Kyiv CHPP-4, which is severely damaged in a massive Russian missile attack in Kyiv, Ukraine, on February 6, 2026. On the night of February 2-3, Russian forces strike the heating system of Kyiv CHPP-4 (Darnytska CHPP) with five ballistic missiles, causing critical damage and forcing its shutdown. As a result, 1,129 residential buildings in Dniprovskyi and part of Darnytskyi districts, along with 46 schools, 72 kindergartens, 18 medical institutions, and other social and urban infrastructure facilities, are left without heating and hot water amid temperatures of -25?C.


Restricted to Editorial Use Only.
Commercial use is not permitted without prior authorization.
Please contact us for more information.


Vehicles drive through the diversions along the BP Highway in Kavrepalanchowk District, Nepal, on December 26, 2025, after it is swept away... Editorial
Nepal's BP Highway Resumes Operations After 2024 Floods
26 Dec 2025 · KAVREPALANCHOWK, Nepal
#13130393
Vehicles drive through the diversions along the BP Highway in Kavrepalanchowk District, Nepal, on December 26, 2025, after it is swept away...

#13130393

26 Dec 2025

Vehicles drive through the diversions along the BP Highway in Kavrepalanchowk District, Nepal, on December 26, 2025, after it is swept away by a flash flood in September 2024. The section of the BP Highway between Katunje and Barkhekhola is severely damaged by the flash flood in the Rosi River in September 2024. Three sections are rebuilt under the funding of the government of Nepal, while the Japanese government is requested to support the rebuilding of the fourth section. A total budget assurance of Rs. 8.5 billion is secured from the government for the reconstruction of the highway. Out of this, Rs. 7.5 billion is allocated for the three sections in Kavrepalanchok District and Rs. 1 billion for the Sindhuli section. Discussions are ongoing with the Japan International Cooperation Agency (JICA) regarding the challenging and winding 5.5-kilometre segment from Barkhekhola to Dalabensi, and JICA shows interest in conducting a field study and potentially undertaking the project. JICA also conducts a feasibility study to construct a tunnel between Khurkot and Chiyabari in Sindhuli, which helps shorten the BP Highway. In anticipation of the upcoming monsoon season and the potential impact on transportation, the Division Road Office in Bhaktapur raises the height of the temporary road built along the flood-damaged areas of the BP Highway.


Restricted to Editorial Use Only.
Commercial use is not permitted without prior authorization.
Please contact us for more information.


Vehicles drive through the diversions along the BP Highway in Kavrepalanchowk District, Nepal, on December 26, 2025, after it is swept away... Editorial
Nepal's BP Highway Resumes Operations After 2024 Floods
26 Dec 2025 · KAVREPALANCHOWK, Nepal
#13130394
Vehicles drive through the diversions along the BP Highway in Kavrepalanchowk District, Nepal, on December 26, 2025, after it is swept away...

#13130394

26 Dec 2025

Vehicles drive through the diversions along the BP Highway in Kavrepalanchowk District, Nepal, on December 26, 2025, after it is swept away by a flash flood in September 2024. The section of the BP Highway between Katunje and Barkhekhola is severely damaged by the flash flood in the Rosi River in September 2024. Three sections are rebuilt under the funding of the government of Nepal, while the Japanese government is requested to support the rebuilding of the fourth section. A total budget assurance of Rs. 8.5 billion is secured from the government for the reconstruction of the highway. Out of this, Rs. 7.5 billion is allocated for the three sections in Kavrepalanchok District and Rs. 1 billion for the Sindhuli section. Discussions are ongoing with the Japan International Cooperation Agency (JICA) regarding the challenging and winding 5.5-kilometre segment from Barkhekhola to Dalabensi, and JICA shows interest in conducting a field study and potentially undertaking the project. JICA also conducts a feasibility study to construct a tunnel between Khurkot and Chiyabari in Sindhuli, which helps shorten the BP Highway. In anticipation of the upcoming monsoon season and the potential impact on transportation, the Division Road Office in Bhaktapur raises the height of the temporary road built along the flood-damaged areas of the BP Highway.


Restricted to Editorial Use Only.
Commercial use is not permitted without prior authorization.
Please contact us for more information.


Vehicles drive through the diversions along the BP Highway in Kavrepalanchowk District, Nepal, on December 26, 2025, after it is swept away... Editorial
Nepal's BP Highway Resumes Operations After 2024 Floods
26 Dec 2025 · KAVREPALANCHOWK, Nepal
#13130395
Vehicles drive through the diversions along the BP Highway in Kavrepalanchowk District, Nepal, on December 26, 2025, after it is swept away...

#13130395

26 Dec 2025

Vehicles drive through the diversions along the BP Highway in Kavrepalanchowk District, Nepal, on December 26, 2025, after it is swept away by a flash flood in September 2024. The section of the BP Highway between Katunje and Barkhekhola is severely damaged by the flash flood in the Rosi River in September 2024. Three sections are rebuilt under the funding of the government of Nepal, while the Japanese government is requested to support the rebuilding of the fourth section. A total budget assurance of Rs. 8.5 billion is secured from the government for the reconstruction of the highway. Out of this, Rs. 7.5 billion is allocated for the three sections in Kavrepalanchok District and Rs. 1 billion for the Sindhuli section. Discussions are ongoing with the Japan International Cooperation Agency (JICA) regarding the challenging and winding 5.5-kilometre segment from Barkhekhola to Dalabensi, and JICA shows interest in conducting a field study and potentially undertaking the project. JICA also conducts a feasibility study to construct a tunnel between Khurkot and Chiyabari in Sindhuli, which helps shorten the BP Highway. In anticipation of the upcoming monsoon season and the potential impact on transportation, the Division Road Office in Bhaktapur raises the height of the temporary road built along the flood-damaged areas of the BP Highway.


Restricted to Editorial Use Only.
Commercial use is not permitted without prior authorization.
Please contact us for more information.


Vehicles drive through the diversions along the BP Highway in Kavrepalanchowk District, Nepal, on December 26, 2025, after it is swept away... Editorial
Nepal's BP Highway Resumes Operations After 2024 Floods
26 Dec 2025 · KAVREPALANCHOWK, Nepal
#13130396
Vehicles drive through the diversions along the BP Highway in Kavrepalanchowk District, Nepal, on December 26, 2025, after it is swept away...

#13130396

26 Dec 2025

Vehicles drive through the diversions along the BP Highway in Kavrepalanchowk District, Nepal, on December 26, 2025, after it is swept away by a flash flood in September 2024. The section of the BP Highway between Katunje and Barkhekhola is severely damaged by the flash flood in the Rosi River in September 2024. Three sections are rebuilt under the funding of the government of Nepal, while the Japanese government is requested to support the rebuilding of the fourth section. A total budget assurance of Rs. 8.5 billion is secured from the government for the reconstruction of the highway. Out of this, Rs. 7.5 billion is allocated for the three sections in Kavrepalanchok District and Rs. 1 billion for the Sindhuli section. Discussions are ongoing with the Japan International Cooperation Agency (JICA) regarding the challenging and winding 5.5-kilometre segment from Barkhekhola to Dalabensi, and JICA shows interest in conducting a field study and potentially undertaking the project. JICA also conducts a feasibility study to construct a tunnel between Khurkot and Chiyabari in Sindhuli, which helps shorten the BP Highway. In anticipation of the upcoming monsoon season and the potential impact on transportation, the Division Road Office in Bhaktapur raises the height of the temporary road built along the flood-damaged areas of the BP Highway.


Restricted to Editorial Use Only.
Commercial use is not permitted without prior authorization.
Please contact us for more information.


Vehicles drive through the diversions along the BP Highway in Kavrepalanchowk District, Nepal, on December 26, 2025, after it is swept away... Editorial
Nepal's BP Highway Resumes Operations After 2024 Floods
26 Dec 2025 · KAVREPALANCHOWK, Nepal
#13130397
Vehicles drive through the diversions along the BP Highway in Kavrepalanchowk District, Nepal, on December 26, 2025, after it is swept away...

#13130397

26 Dec 2025

Vehicles drive through the diversions along the BP Highway in Kavrepalanchowk District, Nepal, on December 26, 2025, after it is swept away by a flash flood in September 2024. The section of the BP Highway between Katunje and Barkhekhola is severely damaged by the flash flood in the Rosi River in September 2024. Three sections are rebuilt under the funding of the government of Nepal, while the Japanese government is requested to support the rebuilding of the fourth section. A total budget assurance of Rs. 8.5 billion is secured from the government for the reconstruction of the highway. Out of this, Rs. 7.5 billion is allocated for the three sections in Kavrepalanchok District and Rs. 1 billion for the Sindhuli section. Discussions are ongoing with the Japan International Cooperation Agency (JICA) regarding the challenging and winding 5.5-kilometre segment from Barkhekhola to Dalabensi, and JICA shows interest in conducting a field study and potentially undertaking the project. JICA also conducts a feasibility study to construct a tunnel between Khurkot and Chiyabari in Sindhuli, which helps shorten the BP Highway. In anticipation of the upcoming monsoon season and the potential impact on transportation, the Division Road Office in Bhaktapur raises the height of the temporary road built along the flood-damaged areas of the BP Highway.


Restricted to Editorial Use Only.
Commercial use is not permitted without prior authorization.
Please contact us for more information.


Vehicles drive through the diversions along the BP Highway in Kavrepalanchowk District, Nepal, on December 26, 2025, after it is swept away... Editorial
Nepal's BP Highway Resumes Operations After 2024 Floods
26 Dec 2025 · KAVREPALANCHOWK, Nepal
#13130398
Vehicles drive through the diversions along the BP Highway in Kavrepalanchowk District, Nepal, on December 26, 2025, after it is swept away...

#13130398

26 Dec 2025

Vehicles drive through the diversions along the BP Highway in Kavrepalanchowk District, Nepal, on December 26, 2025, after it is swept away by a flash flood in September 2024. The section of the BP Highway between Katunje and Barkhekhola is severely damaged by the flash flood in the Rosi River in September 2024. Three sections are rebuilt under the funding of the government of Nepal, while the Japanese government is requested to support the rebuilding of the fourth section. A total budget assurance of Rs. 8.5 billion is secured from the government for the reconstruction of the highway. Out of this, Rs. 7.5 billion is allocated for the three sections in Kavrepalanchok District and Rs. 1 billion for the Sindhuli section. Discussions are ongoing with the Japan International Cooperation Agency (JICA) regarding the challenging and winding 5.5-kilometre segment from Barkhekhola to Dalabensi, and JICA shows interest in conducting a field study and potentially undertaking the project. JICA also conducts a feasibility study to construct a tunnel between Khurkot and Chiyabari in Sindhuli, which helps shorten the BP Highway. In anticipation of the upcoming monsoon season and the potential impact on transportation, the Division Road Office in Bhaktapur raises the height of the temporary road built along the flood-damaged areas of the BP Highway.


Restricted to Editorial Use Only.
Commercial use is not permitted without prior authorization.
Please contact us for more information.


Vehicles drive through the diversions along the BP Highway in Kavrepalanchowk District, Nepal, on December 26, 2025, after it is swept away... Editorial
Nepal's BP Highway Resumes Operations After 2024 Floods
26 Dec 2025 · KAVREPALANCHOWK, Nepal
#13130399
Vehicles drive through the diversions along the BP Highway in Kavrepalanchowk District, Nepal, on December 26, 2025, after it is swept away...

#13130399

26 Dec 2025

Vehicles drive through the diversions along the BP Highway in Kavrepalanchowk District, Nepal, on December 26, 2025, after it is swept away by a flash flood in September 2024. The section of the BP Highway between Katunje and Barkhekhola is severely damaged by the flash flood in the Rosi River in September 2024. Three sections are rebuilt under the funding of the government of Nepal, while the Japanese government is requested to support the rebuilding of the fourth section. A total budget assurance of Rs. 8.5 billion is secured from the government for the reconstruction of the highway. Out of this, Rs. 7.5 billion is allocated for the three sections in Kavrepalanchok District and Rs. 1 billion for the Sindhuli section. Discussions are ongoing with the Japan International Cooperation Agency (JICA) regarding the challenging and winding 5.5-kilometre segment from Barkhekhola to Dalabensi, and JICA shows interest in conducting a field study and potentially undertaking the project. JICA also conducts a feasibility study to construct a tunnel between Khurkot and Chiyabari in Sindhuli, which helps shorten the BP Highway. In anticipation of the upcoming monsoon season and the potential impact on transportation, the Division Road Office in Bhaktapur raises the height of the temporary road built along the flood-damaged areas of the BP Highway.


Restricted to Editorial Use Only.
Commercial use is not permitted without prior authorization.
Please contact us for more information.


Vehicles drive through the diversions along the BP Highway in Kavrepalanchowk District, Nepal, on December 26, 2025, after it is swept away... Editorial
Nepal's BP Highway Resumes Operations After 2024 Floods
26 Dec 2025 · KAVREPALANCHOWK, Nepal
#13130401
Vehicles drive through the diversions along the BP Highway in Kavrepalanchowk District, Nepal, on December 26, 2025, after it is swept away...

#13130401

26 Dec 2025

Vehicles drive through the diversions along the BP Highway in Kavrepalanchowk District, Nepal, on December 26, 2025, after it is swept away by a flash flood in September 2024. The section of the BP Highway between Katunje and Barkhekhola is severely damaged by the flash flood in the Rosi River in September 2024. Three sections are rebuilt under the funding of the government of Nepal, while the Japanese government is requested to support the rebuilding of the fourth section. A total budget assurance of Rs. 8.5 billion is secured from the government for the reconstruction of the highway. Out of this, Rs. 7.5 billion is allocated for the three sections in Kavrepalanchok District and Rs. 1 billion for the Sindhuli section. Discussions are ongoing with the Japan International Cooperation Agency (JICA) regarding the challenging and winding 5.5-kilometre segment from Barkhekhola to Dalabensi, and JICA shows interest in conducting a field study and potentially undertaking the project. JICA also conducts a feasibility study to construct a tunnel between Khurkot and Chiyabari in Sindhuli, which helps shorten the BP Highway. In anticipation of the upcoming monsoon season and the potential impact on transportation, the Division Road Office in Bhaktapur raises the height of the temporary road built along the flood-damaged areas of the BP Highway.


Restricted to Editorial Use Only.
Commercial use is not permitted without prior authorization.
Please contact us for more information.


Vehicles drive through the diversions along the BP Highway in Kavrepalanchowk District, Nepal, on December 26, 2025, after it is swept away... Editorial
Nepal's BP Highway Resumes Operations After 2024 Floods
26 Dec 2025 · KAVREPALANCHOWK, Nepal
#13130403
Vehicles drive through the diversions along the BP Highway in Kavrepalanchowk District, Nepal, on December 26, 2025, after it is swept away...

#13130403

26 Dec 2025

Vehicles drive through the diversions along the BP Highway in Kavrepalanchowk District, Nepal, on December 26, 2025, after it is swept away by a flash flood in September 2024. The section of the BP Highway between Katunje and Barkhekhola is severely damaged by the flash flood in the Rosi River in September 2024. Three sections are rebuilt under the funding of the government of Nepal, while the Japanese government is requested to support the rebuilding of the fourth section. A total budget assurance of Rs. 8.5 billion is secured from the government for the reconstruction of the highway. Out of this, Rs. 7.5 billion is allocated for the three sections in Kavrepalanchok District and Rs. 1 billion for the Sindhuli section. Discussions are ongoing with the Japan International Cooperation Agency (JICA) regarding the challenging and winding 5.5-kilometre segment from Barkhekhola to Dalabensi, and JICA shows interest in conducting a field study and potentially undertaking the project. JICA also conducts a feasibility study to construct a tunnel between Khurkot and Chiyabari in Sindhuli, which helps shorten the BP Highway. In anticipation of the upcoming monsoon season and the potential impact on transportation, the Division Road Office in Bhaktapur raises the height of the temporary road built along the flood-damaged areas of the BP Highway.


Restricted to Editorial Use Only.
Commercial use is not permitted without prior authorization.
Please contact us for more information.


Former Nepali President Bidya Devi Bhandari (in blue shawl) walks out from the arson-hit Office of the Prime Minister and Council of Ministe... Editorial
Former Nepali President Bidhya Devi Bhandari Visits Torched Government Buildings During Gen-Z Uprising
7 Dec 2025 · KATHMANDU, Nepal
#13068889
Former Nepali President Bidya Devi Bhandari (in blue shawl) walks out from the arson-hit Office of the Prime Minister and Council of Ministe...

#13068889

7 Dec 2025

Former Nepali President Bidya Devi Bhandari (in blue shawl) walks out from the arson-hit Office of the Prime Minister and Council of Ministers building, one of the torched government buildings inside Singha Durbar, the administrative capital of Nepal, during the Gen-Z uprising in Kathmandu, Nepal, on December 7, 2025. The western section of Singha Durbar is completely damaged due to arson during the Gen-Z movement that takes place on September 8 and 9.


Restricted to Editorial Use Only.
Commercial use is not permitted without prior authorization.
Please contact us for more information.


Former Nepali President Bidya Devi Bhandari (in blue shawl) inspects the torched government buildings inside Singha Durbar, the administrati... Editorial
Former Nepali President Bidhya Devi Bhandari Visits Torched Government Buildings During Gen-Z Uprising
7 Dec 2025 · KATHMANDU, Nepal
#13068890
Former Nepali President Bidya Devi Bhandari (in blue shawl) inspects the torched government buildings inside Singha Durbar, the administrati...

#13068890

7 Dec 2025

Former Nepali President Bidya Devi Bhandari (in blue shawl) inspects the torched government buildings inside Singha Durbar, the administrative capital of Nepal, during the Gen-Z uprising in Kathmandu, Nepal, on December 7, 2025. The western section of Singha Durbar is completely damaged due to arson during the Gen-Z movement that takes place on September 8 and 9.


Restricted to Editorial Use Only.
Commercial use is not permitted without prior authorization.
Please contact us for more information.


Former Nepali President Bidya Devi Bhandari (in blue shawl) inspects the torched government buildings inside Singha Durbar, the administrati... Editorial
Former Nepali President Bidhya Devi Bhandari Visits Torched Government Buildings During Gen-Z Uprising
7 Dec 2025 · KATHMANDU, Nepal
#13068891
Former Nepali President Bidya Devi Bhandari (in blue shawl) inspects the torched government buildings inside Singha Durbar, the administrati...

#13068891

7 Dec 2025

Former Nepali President Bidya Devi Bhandari (in blue shawl) inspects the torched government buildings inside Singha Durbar, the administrative capital of Nepal, during the Gen-Z uprising in Kathmandu, Nepal, on December 7, 2025. The western section of Singha Durbar is completely damaged due to arson during the Gen-Z movement that takes place on September 8 and 9.


Restricted to Editorial Use Only.
Commercial use is not permitted without prior authorization.
Please contact us for more information.


Former Nepali President Bidya Devi Bhandari (in blue shawl) inspects the torched government buildings inside Singha Durbar, the administrati... Editorial
Former Nepali President Bidhya Devi Bhandari Visits Torched Government Buildings During Gen-Z Uprising
7 Dec 2025 · KATHMANDU, Nepal
#13068892
Former Nepali President Bidya Devi Bhandari (in blue shawl) inspects the torched government buildings inside Singha Durbar, the administrati...

#13068892

7 Dec 2025

Former Nepali President Bidya Devi Bhandari (in blue shawl) inspects the torched government buildings inside Singha Durbar, the administrative capital of Nepal, during the Gen-Z uprising in Kathmandu, Nepal, on December 7, 2025. The western section of Singha Durbar is completely damaged due to arson during the Gen-Z movement that takes place on September 8 and 9.


Restricted to Editorial Use Only.
Commercial use is not permitted without prior authorization.
Please contact us for more information.


Former Nepali President Bidya Devi Bhandari (in blue shawl) inspects the torched government buildings inside Singha Durbar, the administrati... Editorial
Former Nepali President Bidhya Devi Bhandari Visits Torched Government Buildings During Gen-Z Uprising
7 Dec 2025 · KATHMANDU, Nepal
#13068893
Former Nepali President Bidya Devi Bhandari (in blue shawl) inspects the torched government buildings inside Singha Durbar, the administrati...

#13068893

7 Dec 2025

Former Nepali President Bidya Devi Bhandari (in blue shawl) inspects the torched government buildings inside Singha Durbar, the administrative capital of Nepal, during the Gen-Z uprising in Kathmandu, Nepal, on December 7, 2025. The western section of Singha Durbar is completely damaged due to arson during the Gen-Z movement that takes place on September 8 and 9.


Restricted to Editorial Use Only.
Commercial use is not permitted without prior authorization.
Please contact us for more information.


of 49
Next
Add to Board
Loading boards…
New board
NurPhoto Logo

Independent photojournalistic agency delivering global visual storytelling since 2013. Trusted by leading media organizations worldwide.

Company
  • About Us
  • Work With Us
  • Contact Us
  • Latest Galleries
Services
  • Editorial Pictures
  • Assignments
  • Research Services
  • Fine Art Prints
  • Creative Content
  • My Picturemaxx
Resources
  • Credit Packs
  • License Terms
  • Terms of Service
  • Privacy Policy
  • Support Center
Connect With Us
[email protected]
24/7 Support
Follow Our Stories

© 2013–2026 NurPhoto S.r.l. All rights reserved. | VAT IT01921690663

We accept:
Click outside this window to close it