Cnooc "Deep Sea One" Completed

Click image to zoom

Cnooc "Deep Sea One" Completed

The land construction of the integrated treatment platform for the second phase of the Deep-sea One project is being completed in the West Coast New Area of Qingdao, in Qingdao, Shandong province, China, on February 1, 2024. Reports indicate that the platform is utilizing 7 megawatt gas turbine generator sets and other domestic equipment that possess completely independent intellectual property rights. It is equipped with the largest domestic offshore platform slug flow catcher, designed by CNOOC, to eliminate the risk of liquid level fluctuations and blockages in oil and gas mixed transport pipelines, ensuring the reliable operation of oil and gas treatment equipment. The deep-sea No. 1 ultra-deep water gas field, which started operations in June 2021, has confirmed geological reserves of over 100 billion cubic meters. With a maximum water depth of more than 1,500 meters and a maximum well depth of over 4,000 meters, it is the deepest and most challenging offshore ultra-deep water gas field independently developed by China to date. (Photo by Costfoto/NurPhoto)


Photo Details


Usage Guidelines

Editorial Use Only. Commercial use is not permitted without prior authorization.
Contact us for licensing inquiries

Related Keywords

License This Photo

Total Price
35.00
Secure checkout

Need a custom license?

Contact Sales
2025 NurPhoto. All rights reserved. This image is the property of NurPhoto and is protected under international copyright laws.