Click image to zoom
Transmission Line Construction
Construction workers carry out a roller skating operation at an altitude of more than 70 meters on the 220-kilovolt Luding transmission line project site in Chuzhou, China, on October 4, 2024. (Photo by Costfoto/NurPhoto)
Photo Details
| Photo ID | #11635922 |
|---|---|
| Date Taken | |
| Location | N/A |
| Photographer | Costfoto/NurPhoto |
| Category | Economy, Business and Finance |
| Copyright | © 2025 NurPhoto - Costfoto/NurPhoto |
Related Keywords
China
CHN
Transmission
Line
Construction
power
Chuzhou
China
October 2024
construction workers
roller skating operation
altitude
70 meters
220-kilovolt
Luding transmission line
project site
Anhui province
Costfoto
NurPhoto
electric transmission
infrastructure
high altitude work
power line
construction site
engineering
electricity
transmission project
power infrastructure
safety
construction equipment
energy distribution
electrical grid
power transmission
utility infrastructure
high-voltage line
construction industry
project management
electrical engineering.
2025 NurPhoto. All rights reserved.
This image is the property of NurPhoto and is protected under international copyright laws.