Nepal’s BP Highway Awaits Reconstruction After Flash Flood Of 2024, Japanese Assistance Sought

Click image to zoom

Nepal’s BP Highway Awaits Reconstruction After Flash Flood Of 2024, Japanese Assistance Sought

Vehicles drive along the temporarily constructed BP Highway after it is swept away by a flash flood in September 2024 in Kavrepalanchowk District of Nepal on May 18, 2025. The section of the BP Highway between Katunje and Barkhekhola is severely damaged by the flash flood in the Rosi River in September 2024. Three sections are being rebuilt under the funding of the government of Nepal, while the Japanese government is requested to support the rebuilding of the fourth section. A total budget assurance of Rs. 8.5 billion is secured from the government for the reconstruction of the highway. Out of this, Rs. 7.5 billion is allocated for the three sections in Kavrepalanchok district and Rs. 1 billion for the Sindhuli section. Discussions are ongoing with the Japan International Cooperation Agency (JICA) regarding the challenging and winding 5.5-kilometre segment from Barkhekhola to Dalabensi, and JICA shows interest in conducting a field study and potentially undertaking the project. JICA is also conducting a feasibility study to construct a tunnel between Khurkot and Chiyabari in Sindhuli, which would help shorten the BP Highway. In anticipation of the upcoming monsoon season and the potential impact on transportation, the Division Road Office in Bhaktapur raises the height of the temporary road built along the flood-damaged areas of the BP Highway. (Photo by Subaas Shrestha/NurPhoto)


Photo Details


Usage Guidelines

Editorial Use Only. Commercial use is not permitted without prior authorization.
Contact us for licensing inquiries

Related Keywords

License This Photo

Total Price
35.00
Secure checkout

Need a custom license?

Contact Sales
2025 NurPhoto. All rights reserved. This image is the property of NurPhoto and is protected under international copyright laws.