Click image to zoom
Nepal’s BP Highway Awaits Reconstruction After Flash Flood Of 2024, Japanese Assistance Sought
Vehicles drive along the temporarily constructed BP Highway after it is swept away by a flash flood in September 2024 in Kavrepalanchowk District of Nepal on May 18, 2025. The section of the BP Highway between Katunje and Barkhekhola is severely damaged by the flash flood in the Rosi River in September 2024. Three sections are being rebuilt under the funding of the government of Nepal, while the Japanese government is requested to support the rebuilding of the fourth section. A total budget assurance of Rs. 8.5 billion is secured from the government for the reconstruction of the highway. Out of this, Rs. 7.5 billion is allocated for the three sections in Kavrepalanchok district and Rs. 1 billion for the Sindhuli section. Discussions are ongoing with the Japan International Cooperation Agency (JICA) regarding the challenging and winding 5.5-kilometre segment from Barkhekhola to Dalabensi, and JICA shows interest in conducting a field study and potentially undertaking the project. JICA is also conducting a feasibility study to construct a tunnel between Khurkot and Chiyabari in Sindhuli, which would help shorten the BP Highway. In anticipation of the upcoming monsoon season and the potential impact on transportation, the Division Road Office in Bhaktapur raises the height of the temporary road built along the flood-damaged areas of the BP Highway. (Photo by Subaas Shrestha/NurPhoto)
Photo Details
| Photo ID | #12381427 |
|---|---|
| Date Taken | |
| Location | N/A |
| Photographer | Subaas Shrestha/NurPhoto |
| Category | Disaster and Accident |
| Copyright | © 2025 NurPhoto - Subaas Shrestha/NurPhoto |
Related Keywords
BP Highway
flash flood
September 2024
Kavrepalanchowk District
Nepal
Katunje
Barkhekhola
Rosi River
government funding
Japanese government
reconstruction
Rs. 8.5 billion
Kavrepalanchok district
Sindhuli section
Barkhekhola to Dalabensi
Japan International Cooperation Agency
JICA
field study
feasibility study
Khurkot
Chiyabari
tunnel construction
monsoon season
transportation impact
Division Road Office
Bhaktapur
temporary road
flood damage
highway reconstruction
infrastructure
international cooperation
road safety
budget allocation
project undertaking
field assessment
highway damage
transportation infrastructure.
2025 NurPhoto. All rights reserved.
This image is the property of NurPhoto and is protected under international copyright laws.