Click image to zoom
Nepal's First Overpass Road Infrastructure In Gwarko Ready For Operation
A girl cycles over the newly built overpass infrastructure in Gwarko of Lalitpur, Nepal, on June 19, 2025. The long-awaited overpass is built to ease chronic traffic congestion along the Koteshwar-Gwarko-Kalanki corridor of the Kathmandu Valley. Initiated in February 2022 under the engineering, procurement, and construction (EPC) model, the four-lane overpass is originally slated for completion in two years. From Gwarko intersection, the structure spans 320 meters towards Koteshwar and 185 meters towards Satdobato, with both sides featuring four layers of blacktopping. The ramp stands 10.2 meters high. The project is awarded at a contract value of Rs176.68 million. Once operational, the contractor is responsible for the maintenance for the next five years. (Photo by Subaas Shrestha/NurPhoto)
Photo Details
| Photo ID | #12486536 |
|---|---|
| Date Taken | |
| Location | N/A |
| Photographer | Subaas Shrestha/NurPhoto |
| Category | Human Interest |
| Copyright | © 2026 NurPhoto - Subaas Shrestha/NurPhoto |
Related Keywords
girl
cycles
overpass
infrastructure
Gwarko
Lalitpur
June 19
2025
traffic congestion
Koteshwar
Kalanki
Kathmandu Valley
engineering
procurement
construction
EPC model
four-lane
completion
Gwarko intersection
structure
Koteshwar
Satdobato
blacktopping
ramp
height
project
contract value
Rs176.68 million
operational
contractor
maintenance
five years
Subaas Shrestha
NurPhoto
chronic
corridor
February 2022
completion date.
2026 NurPhoto. All rights reserved.
This image is the property of NurPhoto and is protected under international copyright laws.