Click image to zoom
Paris - Charles De Gaulle Airport In Roissy
ROISSY-EN-FRANCE, FRANCE - AUGUST 7: General view of runway 1 undergoing rehabilitation works at Paris Charles de Gaulle Airport in Roissy-en-France, Ile-de-France, France, on August 7, 2025. The runway (09R/27L) will be closed for renovation from July 15 to December 8, 2025, with flights redirected mainly to runway 3 during this period. The modernization work, including runway and access road upgrades, is being carried out by the Colas Group. (Photo by STR/NurPhoto)
Photo Details
| Photo ID | #12629726 |
|---|---|
| Date Taken | |
| Location | N/A |
| Photographer | STR/NurPhoto |
| Category | Economy, Business and Finance |
| Copyright | © 2025 NurPhoto - STR/NurPhoto |
Related Keywords
2025
Airport
Aviation
CDG
Charles de Gaulle
Closure
Colas
Engineering
Ile-de-France
Maintenance
Modernization
Paris
Rehabilitation
Repairs
Roissy-en-France
Winter
air traffic
air travel
airport development
airport facilities
airport management
airport operations
aviation industry
construction
contractors
delays
diversion
flight paths
flights
infrastructure
landing
logistics
pavement
project
renovation
runway
runway 09R/27L
runway 1
runway 3
runway upgrade
safety
schedule
summer
takeoff
taxiway
transportation
travel
upgrades
work zone
Roissy-en-France
runway 1
rehabilitation works
Paris Charles de Gaulle Airport
Ile-de-France
France
August 7
2025
runway 09R/27L
renovation
July 15 to December 8
2025
flights redirected
runway 3
modernization work
runway upgrades
access road upgrades
Colas Group
airport infrastructure
air traffic
construction
aviation
airport operations
flight management
runway closure
engineering
transportation
infrastructure development
airport maintenance
civil engineering
airport logistics
runway safety
air travel
airport facilities
construction project.
2025 NurPhoto. All rights reserved.
This image is the property of NurPhoto and is protected under international copyright laws.