Click image to zoom
Perilous Condition Of Nepal Highway Continues One Week After Heavy Downpour In 2025
Heavy load construction vehicles make a diversion in the Roshi River along the BP Highway in Kavrepalanchowk district of Nepal on October 9, 2025. Various sections of the BP Highway, built with Japanese assistance, are swept by the floods of 2024, and within weeks since the disaster, diversions are set up to bring it back into operation. The local authorities, in coordination with the central government, are again setting up diversions, but people are forced to cling to the rocks to get across the road section and catch a bus to continue their journey. One week since the heavy rain batters the Himalayan nation, at least nine major highways connecting various parts of the country remain completely obstructed, as per the latest update from Nepal Police. As a result, many who leave Kathmandu Valley for their village homes for the Dashain festival face difficulties in returning to their workplace and temporary residence. (Photo by Subaas Shrestha/NurPhoto)
Photo Details
| Photo ID | #12845145 |
|---|---|
| Date Taken | |
| Location | N/A |
| Photographer | Subaas Shrestha/NurPhoto |
| Category | Disaster and Accident |
| Copyright | © 2026 NurPhoto - Subaas Shrestha/NurPhoto |
Related Keywords
Heavy load construction vehicles
diversion
Roshi river
BP Highway
Kavrepalanchowk district
Nepal
October 2025
Japanese assistance
floods
2024
disaster
operation
local authorities
center government
rocks
road section
bus
journey
heavy rain
Himalayan Nation
highways
obstruction
Nepal Police
Kathmandu Valley
village homes
Dashain festival
difficulties
workplace
temporary residence
Subaas Shrestha
NurPhoto
construction
rain
transportation
infrastructure
travel disruption
flood damage.
2026 NurPhoto. All rights reserved.
This image is the property of NurPhoto and is protected under international copyright laws.