Skip to main content
NurPhoto Agency Logo
  • Home
  • Editorial Pictures
    • Unrest, Conflicts and War
    • Arts, Culture and Entertainment
    • Sports

    • All Categories

    • Latest Galleries
  • Reportage
  • News of the Week
  • Videos
  • (0)
  • Login
  • Register

Search Editorial Photos

Enter keywords to search our editorial photo archive
  1. Home
  2. Search
  3. Basin Capacity

Refine Results

Active Filters:
Sort By
Content Type
Location
People

"Basin Capacity"

197 professional editorial images found

Loading search results...
A Danube cruise ship with tourists and a cargo ship with a load of timber are at the Kachlet power plant dam in Passau, Lower Bavaria, Bavar...

#12156342

Double Lock In The Danube River In Passau

14 March 2025

A Danube cruise ship with tourists and a cargo ship with a load of timber are at the Kachlet power plant dam in Passau, Lower Bavaria, Bavar...

#12156342

14 March 2025

A Danube cruise ship with tourists and a cargo ship with a load of timber are at the Kachlet power plant dam in Passau, Lower Bavaria, Bavaria, Germany, on June 11, 2022. The plant from the 1920s is a dam operated by Uniper Kraftwerke GmbH with a double lock and hydroelectric power plant in the Danube near Maierhof in the city of Passau.


Restricted to Editorial Use Only.
Commercial use is not permitted without prior authorization.
Please contact us for more information.


A Danube cruise ship with tourists and a cargo ship with a load of timber are at the Kachlet power plant dam in Passau, Lower Bavaria, Bavar...

#12156346

Double Lock In The Danube River In Passau

14 March 2025

A Danube cruise ship with tourists and a cargo ship with a load of timber are at the Kachlet power plant dam in Passau, Lower Bavaria, Bavar...

#12156346

14 March 2025

A Danube cruise ship with tourists and a cargo ship with a load of timber are at the Kachlet power plant dam in Passau, Lower Bavaria, Bavaria, Germany, on June 11, 2022. The plant from the 1920s is a dam operated by Uniper Kraftwerke GmbH with a double lock and hydroelectric power plant in the Danube near Maierhof in the city of Passau.


Restricted to Editorial Use Only.
Commercial use is not permitted without prior authorization.
Please contact us for more information.


A Danube cruise ship with tourists and a cargo ship with a load of timber are at the Kachlet power plant dam in Passau, Lower Bavaria, Bavar...

#12156350

Double Lock In The Danube River In Passau

14 March 2025

A Danube cruise ship with tourists and a cargo ship with a load of timber are at the Kachlet power plant dam in Passau, Lower Bavaria, Bavar...

#12156350

14 March 2025

A Danube cruise ship with tourists and a cargo ship with a load of timber are at the Kachlet power plant dam in Passau, Lower Bavaria, Bavaria, Germany, on June 11, 2022. The plant from the 1920s is a dam operated by Uniper Kraftwerke GmbH with a double lock and hydroelectric power plant in the Danube near Maierhof in the city of Passau.


Restricted to Editorial Use Only.
Commercial use is not permitted without prior authorization.
Please contact us for more information.


The Three Gorges Dam is opening nine holes to release water in Yichang, China, on July 16, 2024. The Three Gorges Reservoir is speeding up t...

#11413296

Three Gorges Dam Discharge Water in Yichang

16 July 2024

The Three Gorges Dam is opening nine holes to release water in Yichang, China, on July 16, 2024. The Three Gorges Reservoir is speeding up t...

#11413296

16 July 2024

The Three Gorges Dam is opening nine holes to release water in Yichang, China, on July 16, 2024. The Three Gorges Reservoir is speeding up the release of flood storage capacity to prepare for a new round of flooding on the upper reaches of the Yangtze River.


Restricted to Editorial Use Only.
Commercial use is not permitted without prior authorization.
Please contact us for more information.


The Three Gorges Dam is opening nine holes to release water in Yichang, China, on July 16, 2024. The Three Gorges Reservoir is speeding up t...

#11413297

Three Gorges Dam Discharge Water in Yichang

16 July 2024

The Three Gorges Dam is opening nine holes to release water in Yichang, China, on July 16, 2024. The Three Gorges Reservoir is speeding up t...

#11413297

16 July 2024

The Three Gorges Dam is opening nine holes to release water in Yichang, China, on July 16, 2024. The Three Gorges Reservoir is speeding up the release of flood storage capacity to prepare for a new round of flooding on the upper reaches of the Yangtze River.


Restricted to Editorial Use Only.
Commercial use is not permitted without prior authorization.
Please contact us for more information.


The Three Gorges Dam is opening nine holes to release water in Yichang, China, on July 16, 2024. The Three Gorges Reservoir is speeding up t...

#11413298

Three Gorges Dam Discharge Water in Yichang

16 July 2024

The Three Gorges Dam is opening nine holes to release water in Yichang, China, on July 16, 2024. The Three Gorges Reservoir is speeding up t...

#11413298

16 July 2024

The Three Gorges Dam is opening nine holes to release water in Yichang, China, on July 16, 2024. The Three Gorges Reservoir is speeding up the release of flood storage capacity to prepare for a new round of flooding on the upper reaches of the Yangtze River.


Restricted to Editorial Use Only.
Commercial use is not permitted without prior authorization.
Please contact us for more information.


The Three Gorges Dam is opening nine holes to release water in Yichang, China, on July 16, 2024. The Three Gorges Reservoir is speeding up t...

#11413299

Three Gorges Dam Discharge Water in Yichang

16 July 2024

The Three Gorges Dam is opening nine holes to release water in Yichang, China, on July 16, 2024. The Three Gorges Reservoir is speeding up t...

#11413299

16 July 2024

The Three Gorges Dam is opening nine holes to release water in Yichang, China, on July 16, 2024. The Three Gorges Reservoir is speeding up the release of flood storage capacity to prepare for a new round of flooding on the upper reaches of the Yangtze River.


Restricted to Editorial Use Only.
Commercial use is not permitted without prior authorization.
Please contact us for more information.


The Three Gorges Dam is opening nine holes to release water in Yichang, China, on July 16, 2024. The Three Gorges Reservoir is speeding up t...

#11413300

Three Gorges Dam Discharge Water in Yichang

16 July 2024

The Three Gorges Dam is opening nine holes to release water in Yichang, China, on July 16, 2024. The Three Gorges Reservoir is speeding up t...

#11413300

16 July 2024

The Three Gorges Dam is opening nine holes to release water in Yichang, China, on July 16, 2024. The Three Gorges Reservoir is speeding up the release of flood storage capacity to prepare for a new round of flooding on the upper reaches of the Yangtze River.


Restricted to Editorial Use Only.
Commercial use is not permitted without prior authorization.
Please contact us for more information.


The Haikui No. 1 Floating Production, Storage, and Offloading Unit (FPSO) is being completed at Offshore Oil Engineering (Qingdao) Co., LTD....

#11178579

FPSO Completed in Qingdao

26 April 2024

The Haikui No. 1 Floating Production, Storage, and Offloading Unit (FPSO) is being completed at Offshore Oil Engineering (Qingdao) Co., LTD....

#11178579

26 April 2024

The Haikui No. 1 Floating Production, Storage, and Offloading Unit (FPSO) is being completed at Offshore Oil Engineering (Qingdao) Co., LTD., in Qingdao, China, on April 26, 2024. Known as the ''Super Energy Bowl,'' the ''Anemone 1'' has a maximum displacement of 100,000 tons, a maximum oil storage capacity of 60,000 tons, and can continuously operate at sea for 15 years without docking. Reports indicate that ''Haikui No. 1'' is the first cylindrical FPSO to be applied to Asian waters and will be used in the Liuhua oilfield in the Pearl River Estuary basin.


Restricted to Editorial Use Only.
Commercial use is not permitted without prior authorization.
Please contact us for more information.


The Haikui No. 1 Floating Production, Storage, and Offloading Unit (FPSO) is being completed at Offshore Oil Engineering (Qingdao) Co., LTD....

#11178580

FPSO Completed in Qingdao

26 April 2024

The Haikui No. 1 Floating Production, Storage, and Offloading Unit (FPSO) is being completed at Offshore Oil Engineering (Qingdao) Co., LTD....

#11178580

26 April 2024

The Haikui No. 1 Floating Production, Storage, and Offloading Unit (FPSO) is being completed at Offshore Oil Engineering (Qingdao) Co., LTD., in Qingdao, China, on April 26, 2024. Known as the ''Super Energy Bowl,'' the ''Anemone 1'' has a maximum displacement of 100,000 tons, a maximum oil storage capacity of 60,000 tons, and can continuously operate at sea for 15 years without docking. Reports indicate that ''Haikui No. 1'' is the first cylindrical FPSO to be applied to Asian waters and will be used in the Liuhua oilfield in the Pearl River Estuary basin.


Restricted to Editorial Use Only.
Commercial use is not permitted without prior authorization.
Please contact us for more information.


The Haikui No. 1 Floating Production, Storage, and Offloading Unit (FPSO) is being completed at Offshore Oil Engineering (Qingdao) Co., LTD....

#11178582

FPSO Completed in Qingdao

26 April 2024

The Haikui No. 1 Floating Production, Storage, and Offloading Unit (FPSO) is being completed at Offshore Oil Engineering (Qingdao) Co., LTD....

#11178582

26 April 2024

The Haikui No. 1 Floating Production, Storage, and Offloading Unit (FPSO) is being completed at Offshore Oil Engineering (Qingdao) Co., LTD., in Qingdao, China, on April 26, 2024. Known as the ''Super Energy Bowl,'' the ''Anemone 1'' has a maximum displacement of 100,000 tons, a maximum oil storage capacity of 60,000 tons, and can continuously operate at sea for 15 years without docking. Reports indicate that ''Haikui No. 1'' is the first cylindrical FPSO to be applied to Asian waters and will be used in the Liuhua oilfield in the Pearl River Estuary basin.


Restricted to Editorial Use Only.
Commercial use is not permitted without prior authorization.
Please contact us for more information.


The Haikui No. 1 Floating Production, Storage, and Offloading Unit (FPSO) is being completed at Offshore Oil Engineering (Qingdao) Co., LTD....

#11178583

FPSO Completed in Qingdao

26 April 2024

The Haikui No. 1 Floating Production, Storage, and Offloading Unit (FPSO) is being completed at Offshore Oil Engineering (Qingdao) Co., LTD....

#11178583

26 April 2024

The Haikui No. 1 Floating Production, Storage, and Offloading Unit (FPSO) is being completed at Offshore Oil Engineering (Qingdao) Co., LTD., in Qingdao, China, on April 26, 2024. Known as the ''Super Energy Bowl,'' the ''Anemone 1'' has a maximum displacement of 100,000 tons, a maximum oil storage capacity of 60,000 tons, and can continuously operate at sea for 15 years without docking. Reports indicate that ''Haikui No. 1'' is the first cylindrical FPSO to be applied to Asian waters and will be used in the Liuhua oilfield in the Pearl River Estuary basin.


Restricted to Editorial Use Only.
Commercial use is not permitted without prior authorization.
Please contact us for more information.


The Haikui No. 1 Floating Production, Storage, and Offloading Unit (FPSO) is being completed at Offshore Oil Engineering (Qingdao) Co., LTD....

#11178584

FPSO Completed in Qingdao

26 April 2024

The Haikui No. 1 Floating Production, Storage, and Offloading Unit (FPSO) is being completed at Offshore Oil Engineering (Qingdao) Co., LTD....

#11178584

26 April 2024

The Haikui No. 1 Floating Production, Storage, and Offloading Unit (FPSO) is being completed at Offshore Oil Engineering (Qingdao) Co., LTD., in Qingdao, China, on April 26, 2024. Known as the ''Super Energy Bowl,'' the ''Anemone 1'' has a maximum displacement of 100,000 tons, a maximum oil storage capacity of 60,000 tons, and can continuously operate at sea for 15 years without docking. Reports indicate that ''Haikui No. 1'' is the first cylindrical FPSO to be applied to Asian waters and will be used in the Liuhua oilfield in the Pearl River Estuary basin.


Restricted to Editorial Use Only.
Commercial use is not permitted without prior authorization.
Please contact us for more information.


The Haikui No. 1 Floating Production, Storage, and Offloading Unit (FPSO) is being completed at Offshore Oil Engineering (Qingdao) Co., LTD....

#11178585

FPSO Completed in Qingdao

26 April 2024

The Haikui No. 1 Floating Production, Storage, and Offloading Unit (FPSO) is being completed at Offshore Oil Engineering (Qingdao) Co., LTD....

#11178585

26 April 2024

The Haikui No. 1 Floating Production, Storage, and Offloading Unit (FPSO) is being completed at Offshore Oil Engineering (Qingdao) Co., LTD., in Qingdao, China, on April 26, 2024. Known as the ''Super Energy Bowl,'' the ''Anemone 1'' has a maximum displacement of 100,000 tons, a maximum oil storage capacity of 60,000 tons, and can continuously operate at sea for 15 years without docking. Reports indicate that ''Haikui No. 1'' is the first cylindrical FPSO to be applied to Asian waters and will be used in the Liuhua oilfield in the Pearl River Estuary basin.


Restricted to Editorial Use Only.
Commercial use is not permitted without prior authorization.
Please contact us for more information.


The Haikui No. 1 Floating Production, Storage, and Offloading Unit (FPSO) is being completed at Offshore Oil Engineering (Qingdao) Co., LTD....

#11178586

FPSO Completed in Qingdao

26 April 2024

The Haikui No. 1 Floating Production, Storage, and Offloading Unit (FPSO) is being completed at Offshore Oil Engineering (Qingdao) Co., LTD....

#11178586

26 April 2024

The Haikui No. 1 Floating Production, Storage, and Offloading Unit (FPSO) is being completed at Offshore Oil Engineering (Qingdao) Co., LTD., in Qingdao, China, on April 26, 2024. Known as the ''Super Energy Bowl,'' the ''Anemone 1'' has a maximum displacement of 100,000 tons, a maximum oil storage capacity of 60,000 tons, and can continuously operate at sea for 15 years without docking. Reports indicate that ''Haikui No. 1'' is the first cylindrical FPSO to be applied to Asian waters and will be used in the Liuhua oilfield in the Pearl River Estuary basin.


Restricted to Editorial Use Only.
Commercial use is not permitted without prior authorization.
Please contact us for more information.


The Haikui No. 1 Floating Production, Storage, and Offloading Unit (FPSO) is being completed at Offshore Oil Engineering (Qingdao) Co., LTD....

#11178587

FPSO Completed in Qingdao

26 April 2024

The Haikui No. 1 Floating Production, Storage, and Offloading Unit (FPSO) is being completed at Offshore Oil Engineering (Qingdao) Co., LTD....

#11178587

26 April 2024

The Haikui No. 1 Floating Production, Storage, and Offloading Unit (FPSO) is being completed at Offshore Oil Engineering (Qingdao) Co., LTD., in Qingdao, China, on April 26, 2024. Known as the ''Super Energy Bowl,'' the ''Anemone 1'' has a maximum displacement of 100,000 tons, a maximum oil storage capacity of 60,000 tons, and can continuously operate at sea for 15 years without docking. Reports indicate that ''Haikui No. 1'' is the first cylindrical FPSO to be applied to Asian waters and will be used in the Liuhua oilfield in the Pearl River Estuary basin.


Restricted to Editorial Use Only.
Commercial use is not permitted without prior authorization.
Please contact us for more information.


of 13
Next
NurPhoto Logo

Independent photojournalistic agency delivering global visual storytelling since 2013. Trusted by leading media organizations worldwide.

Company
  • About Us
  • Work With Us
  • Contact Us
  • Reportages
Services
  • Editorial Pictures
  • Assignments
  • Research Services
  • Fine Art Prints
  • Creative Content
Resources
  • License Terms
  • Terms of Service
  • Privacy Policy
  • Support Center
Connect With Us
[email protected]
24/7 Support
Follow Our Stories

© 2013-2026 NurPhoto S.r.l. All rights reserved. | VAT IT01921690663

We accept:
Click outside this window to close it