Skip to main content
NurPhoto Agency Logo
  • Home
  • Editorial Pictures
    • Unrest, Conflicts and War
    • Arts, Culture and Entertainment
    • Sports

    • All Categories

    • Latest Galleries
  • Reportage
  • News of the Week
  • Videos
  • (0)
  • Login
  • Register

Search Editorial Photos

Enter keywords to search our editorial photo archive
  1. Home
  2. Search
  3. Flash-Floods

Refine Results

Active Filters:
Sort By
Content Type
Location
People

"Flash-Floods"

2,515 professional editorial images found

Loading search results...
Vehicles drive through the diversions along the BP Highway in Kavrepalanchowk District, Nepal, on December 26, 2025, after it is swept away...

#13130393

Nepal's BP Highway Resumes Operations After 2024 Floods

26 December 2025

Vehicles drive through the diversions along the BP Highway in Kavrepalanchowk District, Nepal, on December 26, 2025, after it is swept away...

#13130393

26 December 2025

Vehicles drive through the diversions along the BP Highway in Kavrepalanchowk District, Nepal, on December 26, 2025, after it is swept away by a flash flood in September 2024. The section of the BP Highway between Katunje and Barkhekhola is severely damaged by the flash flood in the Rosi River in September 2024. Three sections are rebuilt under the funding of the government of Nepal, while the Japanese government is requested to support the rebuilding of the fourth section. A total budget assurance of Rs. 8.5 billion is secured from the government for the reconstruction of the highway. Out of this, Rs. 7.5 billion is allocated for the three sections in Kavrepalanchok District and Rs. 1 billion for the Sindhuli section. Discussions are ongoing with the Japan International Cooperation Agency (JICA) regarding the challenging and winding 5.5-kilometre segment from Barkhekhola to Dalabensi, and JICA shows interest in conducting a field study and potentially undertaking the project. JICA also conducts a feasibility study to construct a tunnel between Khurkot and Chiyabari in Sindhuli, which helps shorten the BP Highway. In anticipation of the upcoming monsoon season and the potential impact on transportation, the Division Road Office in Bhaktapur raises the height of the temporary road built along the flood-damaged areas of the BP Highway.


Restricted to Editorial Use Only.
Commercial use is not permitted without prior authorization.
Please contact us for more information.


Vehicles drive through the diversions along the BP Highway in Kavrepalanchowk District, Nepal, on December 26, 2025, after it is swept away...

#13130394

Nepal's BP Highway Resumes Operations After 2024 Floods

26 December 2025

Vehicles drive through the diversions along the BP Highway in Kavrepalanchowk District, Nepal, on December 26, 2025, after it is swept away...

#13130394

26 December 2025

Vehicles drive through the diversions along the BP Highway in Kavrepalanchowk District, Nepal, on December 26, 2025, after it is swept away by a flash flood in September 2024. The section of the BP Highway between Katunje and Barkhekhola is severely damaged by the flash flood in the Rosi River in September 2024. Three sections are rebuilt under the funding of the government of Nepal, while the Japanese government is requested to support the rebuilding of the fourth section. A total budget assurance of Rs. 8.5 billion is secured from the government for the reconstruction of the highway. Out of this, Rs. 7.5 billion is allocated for the three sections in Kavrepalanchok District and Rs. 1 billion for the Sindhuli section. Discussions are ongoing with the Japan International Cooperation Agency (JICA) regarding the challenging and winding 5.5-kilometre segment from Barkhekhola to Dalabensi, and JICA shows interest in conducting a field study and potentially undertaking the project. JICA also conducts a feasibility study to construct a tunnel between Khurkot and Chiyabari in Sindhuli, which helps shorten the BP Highway. In anticipation of the upcoming monsoon season and the potential impact on transportation, the Division Road Office in Bhaktapur raises the height of the temporary road built along the flood-damaged areas of the BP Highway.


Restricted to Editorial Use Only.
Commercial use is not permitted without prior authorization.
Please contact us for more information.


Vehicles drive through the diversions along the BP Highway in Kavrepalanchowk District, Nepal, on December 26, 2025, after it is swept away...

#13130395

Nepal's BP Highway Resumes Operations After 2024 Floods

26 December 2025

Vehicles drive through the diversions along the BP Highway in Kavrepalanchowk District, Nepal, on December 26, 2025, after it is swept away...

#13130395

26 December 2025

Vehicles drive through the diversions along the BP Highway in Kavrepalanchowk District, Nepal, on December 26, 2025, after it is swept away by a flash flood in September 2024. The section of the BP Highway between Katunje and Barkhekhola is severely damaged by the flash flood in the Rosi River in September 2024. Three sections are rebuilt under the funding of the government of Nepal, while the Japanese government is requested to support the rebuilding of the fourth section. A total budget assurance of Rs. 8.5 billion is secured from the government for the reconstruction of the highway. Out of this, Rs. 7.5 billion is allocated for the three sections in Kavrepalanchok District and Rs. 1 billion for the Sindhuli section. Discussions are ongoing with the Japan International Cooperation Agency (JICA) regarding the challenging and winding 5.5-kilometre segment from Barkhekhola to Dalabensi, and JICA shows interest in conducting a field study and potentially undertaking the project. JICA also conducts a feasibility study to construct a tunnel between Khurkot and Chiyabari in Sindhuli, which helps shorten the BP Highway. In anticipation of the upcoming monsoon season and the potential impact on transportation, the Division Road Office in Bhaktapur raises the height of the temporary road built along the flood-damaged areas of the BP Highway.


Restricted to Editorial Use Only.
Commercial use is not permitted without prior authorization.
Please contact us for more information.


Vehicles drive through the diversions along the BP Highway in Kavrepalanchowk District, Nepal, on December 26, 2025, after it is swept away...

#13130396

Nepal's BP Highway Resumes Operations After 2024 Floods

26 December 2025

Vehicles drive through the diversions along the BP Highway in Kavrepalanchowk District, Nepal, on December 26, 2025, after it is swept away...

#13130396

26 December 2025

Vehicles drive through the diversions along the BP Highway in Kavrepalanchowk District, Nepal, on December 26, 2025, after it is swept away by a flash flood in September 2024. The section of the BP Highway between Katunje and Barkhekhola is severely damaged by the flash flood in the Rosi River in September 2024. Three sections are rebuilt under the funding of the government of Nepal, while the Japanese government is requested to support the rebuilding of the fourth section. A total budget assurance of Rs. 8.5 billion is secured from the government for the reconstruction of the highway. Out of this, Rs. 7.5 billion is allocated for the three sections in Kavrepalanchok District and Rs. 1 billion for the Sindhuli section. Discussions are ongoing with the Japan International Cooperation Agency (JICA) regarding the challenging and winding 5.5-kilometre segment from Barkhekhola to Dalabensi, and JICA shows interest in conducting a field study and potentially undertaking the project. JICA also conducts a feasibility study to construct a tunnel between Khurkot and Chiyabari in Sindhuli, which helps shorten the BP Highway. In anticipation of the upcoming monsoon season and the potential impact on transportation, the Division Road Office in Bhaktapur raises the height of the temporary road built along the flood-damaged areas of the BP Highway.


Restricted to Editorial Use Only.
Commercial use is not permitted without prior authorization.
Please contact us for more information.


Vehicles drive through the diversions along the BP Highway in Kavrepalanchowk District, Nepal, on December 26, 2025, after it is swept away...

#13130397

Nepal's BP Highway Resumes Operations After 2024 Floods

26 December 2025

Vehicles drive through the diversions along the BP Highway in Kavrepalanchowk District, Nepal, on December 26, 2025, after it is swept away...

#13130397

26 December 2025

Vehicles drive through the diversions along the BP Highway in Kavrepalanchowk District, Nepal, on December 26, 2025, after it is swept away by a flash flood in September 2024. The section of the BP Highway between Katunje and Barkhekhola is severely damaged by the flash flood in the Rosi River in September 2024. Three sections are rebuilt under the funding of the government of Nepal, while the Japanese government is requested to support the rebuilding of the fourth section. A total budget assurance of Rs. 8.5 billion is secured from the government for the reconstruction of the highway. Out of this, Rs. 7.5 billion is allocated for the three sections in Kavrepalanchok District and Rs. 1 billion for the Sindhuli section. Discussions are ongoing with the Japan International Cooperation Agency (JICA) regarding the challenging and winding 5.5-kilometre segment from Barkhekhola to Dalabensi, and JICA shows interest in conducting a field study and potentially undertaking the project. JICA also conducts a feasibility study to construct a tunnel between Khurkot and Chiyabari in Sindhuli, which helps shorten the BP Highway. In anticipation of the upcoming monsoon season and the potential impact on transportation, the Division Road Office in Bhaktapur raises the height of the temporary road built along the flood-damaged areas of the BP Highway.


Restricted to Editorial Use Only.
Commercial use is not permitted without prior authorization.
Please contact us for more information.


Vehicles drive through the diversions along the BP Highway in Kavrepalanchowk District, Nepal, on December 26, 2025, after it is swept away...

#13130398

Nepal's BP Highway Resumes Operations After 2024 Floods

26 December 2025

Vehicles drive through the diversions along the BP Highway in Kavrepalanchowk District, Nepal, on December 26, 2025, after it is swept away...

#13130398

26 December 2025

Vehicles drive through the diversions along the BP Highway in Kavrepalanchowk District, Nepal, on December 26, 2025, after it is swept away by a flash flood in September 2024. The section of the BP Highway between Katunje and Barkhekhola is severely damaged by the flash flood in the Rosi River in September 2024. Three sections are rebuilt under the funding of the government of Nepal, while the Japanese government is requested to support the rebuilding of the fourth section. A total budget assurance of Rs. 8.5 billion is secured from the government for the reconstruction of the highway. Out of this, Rs. 7.5 billion is allocated for the three sections in Kavrepalanchok District and Rs. 1 billion for the Sindhuli section. Discussions are ongoing with the Japan International Cooperation Agency (JICA) regarding the challenging and winding 5.5-kilometre segment from Barkhekhola to Dalabensi, and JICA shows interest in conducting a field study and potentially undertaking the project. JICA also conducts a feasibility study to construct a tunnel between Khurkot and Chiyabari in Sindhuli, which helps shorten the BP Highway. In anticipation of the upcoming monsoon season and the potential impact on transportation, the Division Road Office in Bhaktapur raises the height of the temporary road built along the flood-damaged areas of the BP Highway.


Restricted to Editorial Use Only.
Commercial use is not permitted without prior authorization.
Please contact us for more information.


Vehicles drive through the diversions along the BP Highway in Kavrepalanchowk District, Nepal, on December 26, 2025, after it is swept away...

#13130399

Nepal's BP Highway Resumes Operations After 2024 Floods

26 December 2025

Vehicles drive through the diversions along the BP Highway in Kavrepalanchowk District, Nepal, on December 26, 2025, after it is swept away...

#13130399

26 December 2025

Vehicles drive through the diversions along the BP Highway in Kavrepalanchowk District, Nepal, on December 26, 2025, after it is swept away by a flash flood in September 2024. The section of the BP Highway between Katunje and Barkhekhola is severely damaged by the flash flood in the Rosi River in September 2024. Three sections are rebuilt under the funding of the government of Nepal, while the Japanese government is requested to support the rebuilding of the fourth section. A total budget assurance of Rs. 8.5 billion is secured from the government for the reconstruction of the highway. Out of this, Rs. 7.5 billion is allocated for the three sections in Kavrepalanchok District and Rs. 1 billion for the Sindhuli section. Discussions are ongoing with the Japan International Cooperation Agency (JICA) regarding the challenging and winding 5.5-kilometre segment from Barkhekhola to Dalabensi, and JICA shows interest in conducting a field study and potentially undertaking the project. JICA also conducts a feasibility study to construct a tunnel between Khurkot and Chiyabari in Sindhuli, which helps shorten the BP Highway. In anticipation of the upcoming monsoon season and the potential impact on transportation, the Division Road Office in Bhaktapur raises the height of the temporary road built along the flood-damaged areas of the BP Highway.


Restricted to Editorial Use Only.
Commercial use is not permitted without prior authorization.
Please contact us for more information.


Vehicles drive through the diversions along the BP Highway in Kavrepalanchowk District, Nepal, on December 26, 2025, after it is swept away...

#13130401

Nepal's BP Highway Resumes Operations After 2024 Floods

26 December 2025

Vehicles drive through the diversions along the BP Highway in Kavrepalanchowk District, Nepal, on December 26, 2025, after it is swept away...

#13130401

26 December 2025

Vehicles drive through the diversions along the BP Highway in Kavrepalanchowk District, Nepal, on December 26, 2025, after it is swept away by a flash flood in September 2024. The section of the BP Highway between Katunje and Barkhekhola is severely damaged by the flash flood in the Rosi River in September 2024. Three sections are rebuilt under the funding of the government of Nepal, while the Japanese government is requested to support the rebuilding of the fourth section. A total budget assurance of Rs. 8.5 billion is secured from the government for the reconstruction of the highway. Out of this, Rs. 7.5 billion is allocated for the three sections in Kavrepalanchok District and Rs. 1 billion for the Sindhuli section. Discussions are ongoing with the Japan International Cooperation Agency (JICA) regarding the challenging and winding 5.5-kilometre segment from Barkhekhola to Dalabensi, and JICA shows interest in conducting a field study and potentially undertaking the project. JICA also conducts a feasibility study to construct a tunnel between Khurkot and Chiyabari in Sindhuli, which helps shorten the BP Highway. In anticipation of the upcoming monsoon season and the potential impact on transportation, the Division Road Office in Bhaktapur raises the height of the temporary road built along the flood-damaged areas of the BP Highway.


Restricted to Editorial Use Only.
Commercial use is not permitted without prior authorization.
Please contact us for more information.


Vehicles drive through the diversions along the BP Highway in Kavrepalanchowk District, Nepal, on December 26, 2025, after it is swept away...

#13130403

Nepal's BP Highway Resumes Operations After 2024 Floods

26 December 2025

Vehicles drive through the diversions along the BP Highway in Kavrepalanchowk District, Nepal, on December 26, 2025, after it is swept away...

#13130403

26 December 2025

Vehicles drive through the diversions along the BP Highway in Kavrepalanchowk District, Nepal, on December 26, 2025, after it is swept away by a flash flood in September 2024. The section of the BP Highway between Katunje and Barkhekhola is severely damaged by the flash flood in the Rosi River in September 2024. Three sections are rebuilt under the funding of the government of Nepal, while the Japanese government is requested to support the rebuilding of the fourth section. A total budget assurance of Rs. 8.5 billion is secured from the government for the reconstruction of the highway. Out of this, Rs. 7.5 billion is allocated for the three sections in Kavrepalanchok District and Rs. 1 billion for the Sindhuli section. Discussions are ongoing with the Japan International Cooperation Agency (JICA) regarding the challenging and winding 5.5-kilometre segment from Barkhekhola to Dalabensi, and JICA shows interest in conducting a field study and potentially undertaking the project. JICA also conducts a feasibility study to construct a tunnel between Khurkot and Chiyabari in Sindhuli, which helps shorten the BP Highway. In anticipation of the upcoming monsoon season and the potential impact on transportation, the Division Road Office in Bhaktapur raises the height of the temporary road built along the flood-damaged areas of the BP Highway.


Restricted to Editorial Use Only.
Commercial use is not permitted without prior authorization.
Please contact us for more information.


The aftermath conditions of Tropical Cyclone Senyar flash floods in Aceh Tamiang, Aceh, Indonesia, on December 25, 2025, result in the loss...

#13130300

The Asia Pacific Cyclone Senyar Catastrophe

26 December 2025

The aftermath conditions of Tropical Cyclone Senyar flash floods in Aceh Tamiang, Aceh, Indonesia, on December 25, 2025, result in the loss...

#13130300

26 December 2025

The aftermath conditions of Tropical Cyclone Senyar flash floods in Aceh Tamiang, Aceh, Indonesia, on December 25, 2025, result in the loss of at least 1,135 lives in Indonesia, according to the data from the National Disaster Management Agency (BNPB). The disaster also triggers a similar humanitarian crisis in several Asia-Pacific countries, with a total death toll exceeding 2,200.


Restricted to Editorial Use Only.
Commercial use is not permitted without prior authorization.
Please contact us for more information.


The aftermath conditions of Tropical Cyclone Senyar flash floods in Aceh Tamiang, Aceh, Indonesia, on December 25, 2025, result in the loss...

#13130301

The Asia Pacific Cyclone Senyar Catastrophe

26 December 2025

The aftermath conditions of Tropical Cyclone Senyar flash floods in Aceh Tamiang, Aceh, Indonesia, on December 25, 2025, result in the loss...

#13130301

26 December 2025

The aftermath conditions of Tropical Cyclone Senyar flash floods in Aceh Tamiang, Aceh, Indonesia, on December 25, 2025, result in the loss of at least 1,135 lives in Indonesia, according to the data from the National Disaster Management Agency (BNPB). The disaster also triggers a similar humanitarian crisis in several Asia-Pacific countries, with a total death toll exceeding 2,200.


Restricted to Editorial Use Only.
Commercial use is not permitted without prior authorization.
Please contact us for more information.


The aftermath conditions of Tropical Cyclone Senyar flash floods in Aceh Tamiang, Aceh, Indonesia, on December 25, 2025, result in the loss...

#13130302

The Asia Pacific Cyclone Senyar Catastrophe

26 December 2025

The aftermath conditions of Tropical Cyclone Senyar flash floods in Aceh Tamiang, Aceh, Indonesia, on December 25, 2025, result in the loss...

#13130302

26 December 2025

The aftermath conditions of Tropical Cyclone Senyar flash floods in Aceh Tamiang, Aceh, Indonesia, on December 25, 2025, result in the loss of at least 1,135 lives in Indonesia, according to the data from the National Disaster Management Agency (BNPB). The disaster also triggers a similar humanitarian crisis in several Asia-Pacific countries, with a total death toll exceeding 2,200.


Restricted to Editorial Use Only.
Commercial use is not permitted without prior authorization.
Please contact us for more information.


The aftermath conditions of Tropical Cyclone Senyar flash floods in Aceh Tamiang, Aceh, Indonesia, on December 25, 2025, result in the loss...

#13130303

The Asia Pacific Cyclone Senyar Catastrophe

26 December 2025

The aftermath conditions of Tropical Cyclone Senyar flash floods in Aceh Tamiang, Aceh, Indonesia, on December 25, 2025, result in the loss...

#13130303

26 December 2025

The aftermath conditions of Tropical Cyclone Senyar flash floods in Aceh Tamiang, Aceh, Indonesia, on December 25, 2025, result in the loss of at least 1,135 lives in Indonesia, according to the data from the National Disaster Management Agency (BNPB). The disaster also triggers a similar humanitarian crisis in several Asia-Pacific countries, with a total death toll exceeding 2,200.


Restricted to Editorial Use Only.
Commercial use is not permitted without prior authorization.
Please contact us for more information.


The aftermath conditions of Tropical Cyclone Senyar flash floods in Aceh Tamiang, Aceh, Indonesia, on December 25, 2025, result in the loss...

#13130304

The Asia Pacific Cyclone Senyar Catastrophe

26 December 2025

The aftermath conditions of Tropical Cyclone Senyar flash floods in Aceh Tamiang, Aceh, Indonesia, on December 25, 2025, result in the loss...

#13130304

26 December 2025

The aftermath conditions of Tropical Cyclone Senyar flash floods in Aceh Tamiang, Aceh, Indonesia, on December 25, 2025, result in the loss of at least 1,135 lives in Indonesia, according to the data from the National Disaster Management Agency (BNPB). The disaster also triggers a similar humanitarian crisis in several Asia-Pacific countries, with a total death toll exceeding 2,200.


Restricted to Editorial Use Only.
Commercial use is not permitted without prior authorization.
Please contact us for more information.


A school building is destroyed in the aftermath of Tropical Cyclone Senyar flash floods in Aceh Tamiang, Aceh, Indonesia, on December 25, 20...

#13130308

The Asia Pacific Cyclone Senyar Catastrophe

26 December 2025

A school building is destroyed in the aftermath of Tropical Cyclone Senyar flash floods in Aceh Tamiang, Aceh, Indonesia, on December 25, 20...

#13130308

26 December 2025

A school building is destroyed in the aftermath of Tropical Cyclone Senyar flash floods in Aceh Tamiang, Aceh, Indonesia, on December 25, 2025. The data of the National Disaster Management Agency (BNPB) mentions that the devastating disaster results in the loss of at least 1,135 lives in Indonesia and triggers a similar humanitarian crisis in several Asia-Pacific countries, with a total death toll exceeding 2,200.


Restricted to Editorial Use Only.
Commercial use is not permitted without prior authorization.
Please contact us for more information.


A woman carries aid back to her home from a temporary shelter after flash floods caused by Tropical Cyclone Senyar in Aceh Tamiang, Aceh, In...

#13130310

The Asia Pacific Cyclone Senyar Catastrophe

26 December 2025

A woman carries aid back to her home from a temporary shelter after flash floods caused by Tropical Cyclone Senyar in Aceh Tamiang, Aceh, In...

#13130310

26 December 2025

A woman carries aid back to her home from a temporary shelter after flash floods caused by Tropical Cyclone Senyar in Aceh Tamiang, Aceh, Indonesia, on December 25, 2025. Data from the National Disaster Management Agency (BNPB) states that the devastating disaster results in the loss of at least 1,135 lives in Indonesia and triggers a similar humanitarian crisis in several Asia-Pacific countries, with the total death toll exceeding 2,200.


Restricted to Editorial Use Only.
Commercial use is not permitted without prior authorization.
Please contact us for more information.


of 158
Next
NurPhoto Logo

Independent photojournalistic agency delivering global visual storytelling since 2013. Trusted by leading media organizations worldwide.

Company
  • About Us
  • Work With Us
  • Contact Us
  • Reportages
Services
  • Editorial Pictures
  • Assignments
  • Research Services
  • Fine Art Prints
  • Creative Content
Resources
  • License Terms
  • Terms of Service
  • Privacy Policy
  • Support Center
Connect With Us
[email protected]
24/7 Support
Follow Our Stories

© 2013-2025 NurPhoto S.r.l. All rights reserved. | VAT IT01921690663

We accept:
Click outside this window to close it