Skip to main content
NurPhoto Agency Logo
  • Home
  • Editorial Pictures
    • Unrest, Conflicts and War
    • Arts, Culture and Entertainment
    • Sports

    • All Categories

    • Latest Galleries
  • Reportage
  • News of the Week
  • Videos
  • (0)
  • Login
  • Register

Search Editorial Photos

Enter keywords to search our editorial photo archive
  1. Home
  2. Search
  3. Sindhuli

Refine Results

Active Filters:
Sort By
Content Type
Location
People

"Sindhuli"

142 professional editorial images found

Loading search results...
Vehicles drive through the diversions along the BP Highway in Kavrepalanchowk District, Nepal, on December 26, 2025, after it is swept away...

#13130393

Nepal's BP Highway Resumes Operations After 2024 Floods

26 December 2025

Vehicles drive through the diversions along the BP Highway in Kavrepalanchowk District, Nepal, on December 26, 2025, after it is swept away...

#13130393

26 December 2025

Vehicles drive through the diversions along the BP Highway in Kavrepalanchowk District, Nepal, on December 26, 2025, after it is swept away by a flash flood in September 2024. The section of the BP Highway between Katunje and Barkhekhola is severely damaged by the flash flood in the Rosi River in September 2024. Three sections are rebuilt under the funding of the government of Nepal, while the Japanese government is requested to support the rebuilding of the fourth section. A total budget assurance of Rs. 8.5 billion is secured from the government for the reconstruction of the highway. Out of this, Rs. 7.5 billion is allocated for the three sections in Kavrepalanchok District and Rs. 1 billion for the Sindhuli section. Discussions are ongoing with the Japan International Cooperation Agency (JICA) regarding the challenging and winding 5.5-kilometre segment from Barkhekhola to Dalabensi, and JICA shows interest in conducting a field study and potentially undertaking the project. JICA also conducts a feasibility study to construct a tunnel between Khurkot and Chiyabari in Sindhuli, which helps shorten the BP Highway. In anticipation of the upcoming monsoon season and the potential impact on transportation, the Division Road Office in Bhaktapur raises the height of the temporary road built along the flood-damaged areas of the BP Highway.


Restricted to Editorial Use Only.
Commercial use is not permitted without prior authorization.
Please contact us for more information.


Vehicles drive through the diversions along the BP Highway in Kavrepalanchowk District, Nepal, on December 26, 2025, after it is swept away...

#13130394

Nepal's BP Highway Resumes Operations After 2024 Floods

26 December 2025

Vehicles drive through the diversions along the BP Highway in Kavrepalanchowk District, Nepal, on December 26, 2025, after it is swept away...

#13130394

26 December 2025

Vehicles drive through the diversions along the BP Highway in Kavrepalanchowk District, Nepal, on December 26, 2025, after it is swept away by a flash flood in September 2024. The section of the BP Highway between Katunje and Barkhekhola is severely damaged by the flash flood in the Rosi River in September 2024. Three sections are rebuilt under the funding of the government of Nepal, while the Japanese government is requested to support the rebuilding of the fourth section. A total budget assurance of Rs. 8.5 billion is secured from the government for the reconstruction of the highway. Out of this, Rs. 7.5 billion is allocated for the three sections in Kavrepalanchok District and Rs. 1 billion for the Sindhuli section. Discussions are ongoing with the Japan International Cooperation Agency (JICA) regarding the challenging and winding 5.5-kilometre segment from Barkhekhola to Dalabensi, and JICA shows interest in conducting a field study and potentially undertaking the project. JICA also conducts a feasibility study to construct a tunnel between Khurkot and Chiyabari in Sindhuli, which helps shorten the BP Highway. In anticipation of the upcoming monsoon season and the potential impact on transportation, the Division Road Office in Bhaktapur raises the height of the temporary road built along the flood-damaged areas of the BP Highway.


Restricted to Editorial Use Only.
Commercial use is not permitted without prior authorization.
Please contact us for more information.


Vehicles drive through the diversions along the BP Highway in Kavrepalanchowk District, Nepal, on December 26, 2025, after it is swept away...

#13130395

Nepal's BP Highway Resumes Operations After 2024 Floods

26 December 2025

Vehicles drive through the diversions along the BP Highway in Kavrepalanchowk District, Nepal, on December 26, 2025, after it is swept away...

#13130395

26 December 2025

Vehicles drive through the diversions along the BP Highway in Kavrepalanchowk District, Nepal, on December 26, 2025, after it is swept away by a flash flood in September 2024. The section of the BP Highway between Katunje and Barkhekhola is severely damaged by the flash flood in the Rosi River in September 2024. Three sections are rebuilt under the funding of the government of Nepal, while the Japanese government is requested to support the rebuilding of the fourth section. A total budget assurance of Rs. 8.5 billion is secured from the government for the reconstruction of the highway. Out of this, Rs. 7.5 billion is allocated for the three sections in Kavrepalanchok District and Rs. 1 billion for the Sindhuli section. Discussions are ongoing with the Japan International Cooperation Agency (JICA) regarding the challenging and winding 5.5-kilometre segment from Barkhekhola to Dalabensi, and JICA shows interest in conducting a field study and potentially undertaking the project. JICA also conducts a feasibility study to construct a tunnel between Khurkot and Chiyabari in Sindhuli, which helps shorten the BP Highway. In anticipation of the upcoming monsoon season and the potential impact on transportation, the Division Road Office in Bhaktapur raises the height of the temporary road built along the flood-damaged areas of the BP Highway.


Restricted to Editorial Use Only.
Commercial use is not permitted without prior authorization.
Please contact us for more information.


Vehicles drive through the diversions along the BP Highway in Kavrepalanchowk District, Nepal, on December 26, 2025, after it is swept away...

#13130396

Nepal's BP Highway Resumes Operations After 2024 Floods

26 December 2025

Vehicles drive through the diversions along the BP Highway in Kavrepalanchowk District, Nepal, on December 26, 2025, after it is swept away...

#13130396

26 December 2025

Vehicles drive through the diversions along the BP Highway in Kavrepalanchowk District, Nepal, on December 26, 2025, after it is swept away by a flash flood in September 2024. The section of the BP Highway between Katunje and Barkhekhola is severely damaged by the flash flood in the Rosi River in September 2024. Three sections are rebuilt under the funding of the government of Nepal, while the Japanese government is requested to support the rebuilding of the fourth section. A total budget assurance of Rs. 8.5 billion is secured from the government for the reconstruction of the highway. Out of this, Rs. 7.5 billion is allocated for the three sections in Kavrepalanchok District and Rs. 1 billion for the Sindhuli section. Discussions are ongoing with the Japan International Cooperation Agency (JICA) regarding the challenging and winding 5.5-kilometre segment from Barkhekhola to Dalabensi, and JICA shows interest in conducting a field study and potentially undertaking the project. JICA also conducts a feasibility study to construct a tunnel between Khurkot and Chiyabari in Sindhuli, which helps shorten the BP Highway. In anticipation of the upcoming monsoon season and the potential impact on transportation, the Division Road Office in Bhaktapur raises the height of the temporary road built along the flood-damaged areas of the BP Highway.


Restricted to Editorial Use Only.
Commercial use is not permitted without prior authorization.
Please contact us for more information.


Vehicles drive through the diversions along the BP Highway in Kavrepalanchowk District, Nepal, on December 26, 2025, after it is swept away...

#13130397

Nepal's BP Highway Resumes Operations After 2024 Floods

26 December 2025

Vehicles drive through the diversions along the BP Highway in Kavrepalanchowk District, Nepal, on December 26, 2025, after it is swept away...

#13130397

26 December 2025

Vehicles drive through the diversions along the BP Highway in Kavrepalanchowk District, Nepal, on December 26, 2025, after it is swept away by a flash flood in September 2024. The section of the BP Highway between Katunje and Barkhekhola is severely damaged by the flash flood in the Rosi River in September 2024. Three sections are rebuilt under the funding of the government of Nepal, while the Japanese government is requested to support the rebuilding of the fourth section. A total budget assurance of Rs. 8.5 billion is secured from the government for the reconstruction of the highway. Out of this, Rs. 7.5 billion is allocated for the three sections in Kavrepalanchok District and Rs. 1 billion for the Sindhuli section. Discussions are ongoing with the Japan International Cooperation Agency (JICA) regarding the challenging and winding 5.5-kilometre segment from Barkhekhola to Dalabensi, and JICA shows interest in conducting a field study and potentially undertaking the project. JICA also conducts a feasibility study to construct a tunnel between Khurkot and Chiyabari in Sindhuli, which helps shorten the BP Highway. In anticipation of the upcoming monsoon season and the potential impact on transportation, the Division Road Office in Bhaktapur raises the height of the temporary road built along the flood-damaged areas of the BP Highway.


Restricted to Editorial Use Only.
Commercial use is not permitted without prior authorization.
Please contact us for more information.


Vehicles drive through the diversions along the BP Highway in Kavrepalanchowk District, Nepal, on December 26, 2025, after it is swept away...

#13130398

Nepal's BP Highway Resumes Operations After 2024 Floods

26 December 2025

Vehicles drive through the diversions along the BP Highway in Kavrepalanchowk District, Nepal, on December 26, 2025, after it is swept away...

#13130398

26 December 2025

Vehicles drive through the diversions along the BP Highway in Kavrepalanchowk District, Nepal, on December 26, 2025, after it is swept away by a flash flood in September 2024. The section of the BP Highway between Katunje and Barkhekhola is severely damaged by the flash flood in the Rosi River in September 2024. Three sections are rebuilt under the funding of the government of Nepal, while the Japanese government is requested to support the rebuilding of the fourth section. A total budget assurance of Rs. 8.5 billion is secured from the government for the reconstruction of the highway. Out of this, Rs. 7.5 billion is allocated for the three sections in Kavrepalanchok District and Rs. 1 billion for the Sindhuli section. Discussions are ongoing with the Japan International Cooperation Agency (JICA) regarding the challenging and winding 5.5-kilometre segment from Barkhekhola to Dalabensi, and JICA shows interest in conducting a field study and potentially undertaking the project. JICA also conducts a feasibility study to construct a tunnel between Khurkot and Chiyabari in Sindhuli, which helps shorten the BP Highway. In anticipation of the upcoming monsoon season and the potential impact on transportation, the Division Road Office in Bhaktapur raises the height of the temporary road built along the flood-damaged areas of the BP Highway.


Restricted to Editorial Use Only.
Commercial use is not permitted without prior authorization.
Please contact us for more information.


Vehicles drive through the diversions along the BP Highway in Kavrepalanchowk District, Nepal, on December 26, 2025, after it is swept away...

#13130399

Nepal's BP Highway Resumes Operations After 2024 Floods

26 December 2025

Vehicles drive through the diversions along the BP Highway in Kavrepalanchowk District, Nepal, on December 26, 2025, after it is swept away...

#13130399

26 December 2025

Vehicles drive through the diversions along the BP Highway in Kavrepalanchowk District, Nepal, on December 26, 2025, after it is swept away by a flash flood in September 2024. The section of the BP Highway between Katunje and Barkhekhola is severely damaged by the flash flood in the Rosi River in September 2024. Three sections are rebuilt under the funding of the government of Nepal, while the Japanese government is requested to support the rebuilding of the fourth section. A total budget assurance of Rs. 8.5 billion is secured from the government for the reconstruction of the highway. Out of this, Rs. 7.5 billion is allocated for the three sections in Kavrepalanchok District and Rs. 1 billion for the Sindhuli section. Discussions are ongoing with the Japan International Cooperation Agency (JICA) regarding the challenging and winding 5.5-kilometre segment from Barkhekhola to Dalabensi, and JICA shows interest in conducting a field study and potentially undertaking the project. JICA also conducts a feasibility study to construct a tunnel between Khurkot and Chiyabari in Sindhuli, which helps shorten the BP Highway. In anticipation of the upcoming monsoon season and the potential impact on transportation, the Division Road Office in Bhaktapur raises the height of the temporary road built along the flood-damaged areas of the BP Highway.


Restricted to Editorial Use Only.
Commercial use is not permitted without prior authorization.
Please contact us for more information.


Vehicles drive through the diversions along the BP Highway in Kavrepalanchowk District, Nepal, on December 26, 2025, after it is swept away...

#13130401

Nepal's BP Highway Resumes Operations After 2024 Floods

26 December 2025

Vehicles drive through the diversions along the BP Highway in Kavrepalanchowk District, Nepal, on December 26, 2025, after it is swept away...

#13130401

26 December 2025

Vehicles drive through the diversions along the BP Highway in Kavrepalanchowk District, Nepal, on December 26, 2025, after it is swept away by a flash flood in September 2024. The section of the BP Highway between Katunje and Barkhekhola is severely damaged by the flash flood in the Rosi River in September 2024. Three sections are rebuilt under the funding of the government of Nepal, while the Japanese government is requested to support the rebuilding of the fourth section. A total budget assurance of Rs. 8.5 billion is secured from the government for the reconstruction of the highway. Out of this, Rs. 7.5 billion is allocated for the three sections in Kavrepalanchok District and Rs. 1 billion for the Sindhuli section. Discussions are ongoing with the Japan International Cooperation Agency (JICA) regarding the challenging and winding 5.5-kilometre segment from Barkhekhola to Dalabensi, and JICA shows interest in conducting a field study and potentially undertaking the project. JICA also conducts a feasibility study to construct a tunnel between Khurkot and Chiyabari in Sindhuli, which helps shorten the BP Highway. In anticipation of the upcoming monsoon season and the potential impact on transportation, the Division Road Office in Bhaktapur raises the height of the temporary road built along the flood-damaged areas of the BP Highway.


Restricted to Editorial Use Only.
Commercial use is not permitted without prior authorization.
Please contact us for more information.


Vehicles drive through the diversions along the BP Highway in Kavrepalanchowk District, Nepal, on December 26, 2025, after it is swept away...

#13130403

Nepal's BP Highway Resumes Operations After 2024 Floods

26 December 2025

Vehicles drive through the diversions along the BP Highway in Kavrepalanchowk District, Nepal, on December 26, 2025, after it is swept away...

#13130403

26 December 2025

Vehicles drive through the diversions along the BP Highway in Kavrepalanchowk District, Nepal, on December 26, 2025, after it is swept away by a flash flood in September 2024. The section of the BP Highway between Katunje and Barkhekhola is severely damaged by the flash flood in the Rosi River in September 2024. Three sections are rebuilt under the funding of the government of Nepal, while the Japanese government is requested to support the rebuilding of the fourth section. A total budget assurance of Rs. 8.5 billion is secured from the government for the reconstruction of the highway. Out of this, Rs. 7.5 billion is allocated for the three sections in Kavrepalanchok District and Rs. 1 billion for the Sindhuli section. Discussions are ongoing with the Japan International Cooperation Agency (JICA) regarding the challenging and winding 5.5-kilometre segment from Barkhekhola to Dalabensi, and JICA shows interest in conducting a field study and potentially undertaking the project. JICA also conducts a feasibility study to construct a tunnel between Khurkot and Chiyabari in Sindhuli, which helps shorten the BP Highway. In anticipation of the upcoming monsoon season and the potential impact on transportation, the Division Road Office in Bhaktapur raises the height of the temporary road built along the flood-damaged areas of the BP Highway.


Restricted to Editorial Use Only.
Commercial use is not permitted without prior authorization.
Please contact us for more information.


A Nepali farmer plucks sweet oranges from an orchard in Sindhuli, Nepal, on December 9, 2025, to sell them in the market. With the onset of...

#13076728

Farmers In Nepal Go Brisk Plucking Citrus Fruits From Their Orchard After Entering The Peak Season-40

9 December 2025

A Nepali farmer plucks sweet oranges from an orchard in Sindhuli, Nepal, on December 9, 2025, to sell them in the market. With the onset of...

#13076728

9 December 2025

A Nepali farmer plucks sweet oranges from an orchard in Sindhuli, Nepal, on December 9, 2025, to sell them in the market. With the onset of cooler months, Nepal's orchards of oranges and sweet oranges in rural areas such as Sindhuli, a key area for citrus fruits, experience brisk plucking. Known for their juicy segments and vibrant peel, these citrus fruits not only fuel the economy but also provide substantial health benefits. Both oranges, part of the citrus family, are Nepal's most cultivated fruit. Production exceeds 185,000 tons annually and is farmed on nearly 27,892 hectares across 48 districts.


Restricted to Editorial Use Only.
Commercial use is not permitted without prior authorization.
Please contact us for more information.


A Nepali farmer plucks an orange from an orchard in Sindhuli, Nepal, on December 9, 2025, to sell it in the market. With the onset of cooler...

#13076730

Farmers In Nepal Go Brisk Plucking Citrus Fruits From Their Orchard After Entering The Peak Season-40

9 December 2025

A Nepali farmer plucks an orange from an orchard in Sindhuli, Nepal, on December 9, 2025, to sell it in the market. With the onset of cooler...

#13076730

9 December 2025

A Nepali farmer plucks an orange from an orchard in Sindhuli, Nepal, on December 9, 2025, to sell it in the market. With the onset of cooler months, Nepal's orchards of oranges and sweet oranges prompt farmers in rural Nepal, such as Sindhuli, the pocket area for citrus fruits, to briskly pluck them from their orchards. Both fruits, known for their juicy segments and vibrant peel, not only fuel the economy but also provide substantial health benefits. Both oranges, part of the citrus family, are Nepal's most cultivated fruit. With production exceeding 185,000 tons annually, they are farmed on nearly 27,892 hectares across 48 districts.


Restricted to Editorial Use Only.
Commercial use is not permitted without prior authorization.
Please contact us for more information.


A Nepali farmer plucks an orange from an orchard in Sindhuli, Nepal, on December 9, 2025, to sell it in the market. With the onset of cooler...

#13076732

Farmers In Nepal Go Brisk Plucking Citrus Fruits From Their Orchard After Entering The Peak Season-40

9 December 2025

A Nepali farmer plucks an orange from an orchard in Sindhuli, Nepal, on December 9, 2025, to sell it in the market. With the onset of cooler...

#13076732

9 December 2025

A Nepali farmer plucks an orange from an orchard in Sindhuli, Nepal, on December 9, 2025, to sell it in the market. With the onset of cooler months, Nepal's orchards of oranges and sweet oranges prompt farmers in rural Nepal, such as Sindhuli, the pocket area for citrus fruits, to briskly pluck them from their orchards. Both fruits, known for their juicy segments and vibrant peel, not only fuel the economy but also provide substantial health benefits. Both oranges, part of the citrus family, are Nepal's most cultivated fruit. With production exceeding 185,000 tons annually, they are farmed on nearly 27,892 hectares across 48 districts.


Restricted to Editorial Use Only.
Commercial use is not permitted without prior authorization.
Please contact us for more information.


A Nepali farmer plucks an orange from an orchard in Sindhuli, Nepal, on December 9, 2025, to sell it in the market. With the onset of cooler...

#13076734

Farmers In Nepal Go Brisk Plucking Citrus Fruits From Their Orchard After Entering The Peak Season-40

9 December 2025

A Nepali farmer plucks an orange from an orchard in Sindhuli, Nepal, on December 9, 2025, to sell it in the market. With the onset of cooler...

#13076734

9 December 2025

A Nepali farmer plucks an orange from an orchard in Sindhuli, Nepal, on December 9, 2025, to sell it in the market. With the onset of cooler months, Nepal's orchards of oranges and sweet oranges prompt farmers in rural Nepal, such as Sindhuli, the pocket area for citrus fruits, to briskly pluck them from their orchards. Both fruits, known for their juicy segments and vibrant peel, not only fuel the economy but also provide substantial health benefits. Both oranges, part of the citrus family, are Nepal's most cultivated fruit. With production exceeding 185,000 tons annually, they are farmed on nearly 27,892 hectares across 48 districts.


Restricted to Editorial Use Only.
Commercial use is not permitted without prior authorization.
Please contact us for more information.


Freshly plucked sweet oranges from an orchard are pictured in Sindhuli, Nepal, on December 9, 2025, for sale in the market. With the onset o...

#13076737

Farmers In Nepal Go Brisk Plucking Citrus Fruits From Their Orchard After Entering The Peak Season-40

9 December 2025

Freshly plucked sweet oranges from an orchard are pictured in Sindhuli, Nepal, on December 9, 2025, for sale in the market. With the onset o...

#13076737

9 December 2025

Freshly plucked sweet oranges from an orchard are pictured in Sindhuli, Nepal, on December 9, 2025, for sale in the market. With the onset of cooler months, Nepal's orchards of oranges and sweet oranges in rural areas such as Sindhuli, a pocket area for citrus fruits, experience brisk plucking from their orchards. Known for their juicy segments and vibrant peel, these citrus favorites not only fuel the economy but also provide substantial health benefits. Both oranges, part of the citrus family, are Nepal's most cultivated fruit. With production exceeding 185,000 tons annually, they are farmed on nearly 27,892 hectares across 48 districts.


Restricted to Editorial Use Only.
Commercial use is not permitted without prior authorization.
Please contact us for more information.


A Nepali farmer plucks an orange from an orchard in Sindhuli, Nepal, on December 9, 2025, to sell it in the market. With the onset of cooler...

#13076739

Farmers In Nepal Go Brisk Plucking Citrus Fruits From Their Orchard After Entering The Peak Season-40

9 December 2025

A Nepali farmer plucks an orange from an orchard in Sindhuli, Nepal, on December 9, 2025, to sell it in the market. With the onset of cooler...

#13076739

9 December 2025

A Nepali farmer plucks an orange from an orchard in Sindhuli, Nepal, on December 9, 2025, to sell it in the market. With the onset of cooler months, Nepal's orchards of oranges and sweet oranges prompt farmers in rural Nepal, such as Sindhuli, the pocket area for citrus fruits, to briskly pluck them from their orchards. Both fruits, known for their juicy segments and vibrant peel, not only fuel the economy but also provide substantial health benefits. Both oranges, part of the citrus family, are Nepal's most cultivated fruit. With production exceeding 185,000 tons annually, they are farmed on nearly 27,892 hectares across 48 districts.


Restricted to Editorial Use Only.
Commercial use is not permitted without prior authorization.
Please contact us for more information.


Freshly plucked oranges from an orchard are pictured in Sindhuli, Nepal, on December 9, 2025, for sale in the market. With the onset of cool...

#13076741

Farmers In Nepal Go Brisk Plucking Citrus Fruits From Their Orchard After Entering The Peak Season-40

9 December 2025

Freshly plucked oranges from an orchard are pictured in Sindhuli, Nepal, on December 9, 2025, for sale in the market. With the onset of cool...

#13076741

9 December 2025

Freshly plucked oranges from an orchard are pictured in Sindhuli, Nepal, on December 9, 2025, for sale in the market. With the onset of cooler months, Nepal's orange and sweet orange farmers in rural areas such as Sindhuli, a key area for citrus fruits, briskly pluck them from their orchards. Known for their juicy segments and vibrant peel, these citrus favorites not only fuel the economy but also provide substantial health benefits. Oranges, part of the citrus family, are Nepal's most cultivated fruit. With production exceeding 185,000 tons annually, they are farmed on nearly 27,892 hectares across 48 districts.


Restricted to Editorial Use Only.
Commercial use is not permitted without prior authorization.
Please contact us for more information.


of 9
Next
NurPhoto Logo

Independent photojournalistic agency delivering global visual storytelling since 2013. Trusted by leading media organizations worldwide.

Company
  • About Us
  • Work With Us
  • Contact Us
  • Reportages
Services
  • Editorial Pictures
  • Assignments
  • Research Services
  • Fine Art Prints
  • Creative Content
Resources
  • License Terms
  • Terms of Service
  • Privacy Policy
  • Support Center
Connect With Us
[email protected]
24/7 Support
Follow Our Stories

© 2013-2026 NurPhoto S.r.l. All rights reserved. | VAT IT01921690663

We accept:
Click outside this window to close it