Search Editorial Photos
"damaged section"
784 professional editorial images found
#13281012
6 February 2026
Workers prepare to lift a section of a pipe at Kyiv CHPP-4, which is severely damaged in a massive Russian missile attack in Kyiv, Ukraine, on February 6, 2026. On the night of February 2-3, Russian forces strike the heating system of Kyiv CHPP-4 (Darnytska CHPP) with five ballistic missiles, causing critical damage and forcing its shutdown. As a result, 1,129 residential buildings in Dniprovskyi and part of Darnytskyi districts, along with 46 schools, 72 kindergartens, 18 medical institutions, and other social and urban infrastructure facilities, are left without heating and hot water amid temperatures of -25?C.
Restricted to Editorial Use Only.
Commercial use is not permitted without prior authorization.
Please contact us for more information.
#13281013
6 February 2026
Workers prepare to lift a section of a pipe at Kyiv CHPP-4, which is severely damaged in a massive Russian missile attack in Kyiv, Ukraine, on February 6, 2026. On the night of February 2-3, Russian forces strike the heating system of Kyiv CHPP-4 (Darnytska CHPP) with five ballistic missiles, causing critical damage and forcing its shutdown. As a result, 1,129 residential buildings in Dniprovskyi and part of Darnytskyi districts, along with 46 schools, 72 kindergartens, 18 medical institutions, and other social and urban infrastructure facilities, are left without heating and hot water amid temperatures of -25?C.
Restricted to Editorial Use Only.
Commercial use is not permitted without prior authorization.
Please contact us for more information.
#13130393
26 December 2025
Vehicles drive through the diversions along the BP Highway in Kavrepalanchowk District, Nepal, on December 26, 2025, after it is swept away by a flash flood in September 2024. The section of the BP Highway between Katunje and Barkhekhola is severely damaged by the flash flood in the Rosi River in September 2024. Three sections are rebuilt under the funding of the government of Nepal, while the Japanese government is requested to support the rebuilding of the fourth section. A total budget assurance of Rs. 8.5 billion is secured from the government for the reconstruction of the highway. Out of this, Rs. 7.5 billion is allocated for the three sections in Kavrepalanchok District and Rs. 1 billion for the Sindhuli section. Discussions are ongoing with the Japan International Cooperation Agency (JICA) regarding the challenging and winding 5.5-kilometre segment from Barkhekhola to Dalabensi, and JICA shows interest in conducting a field study and potentially undertaking the project. JICA also conducts a feasibility study to construct a tunnel between Khurkot and Chiyabari in Sindhuli, which helps shorten the BP Highway. In anticipation of the upcoming monsoon season and the potential impact on transportation, the Division Road Office in Bhaktapur raises the height of the temporary road built along the flood-damaged areas of the BP Highway.
Restricted to Editorial Use Only.
Commercial use is not permitted without prior authorization.
Please contact us for more information.
#13130394
26 December 2025
Vehicles drive through the diversions along the BP Highway in Kavrepalanchowk District, Nepal, on December 26, 2025, after it is swept away by a flash flood in September 2024. The section of the BP Highway between Katunje and Barkhekhola is severely damaged by the flash flood in the Rosi River in September 2024. Three sections are rebuilt under the funding of the government of Nepal, while the Japanese government is requested to support the rebuilding of the fourth section. A total budget assurance of Rs. 8.5 billion is secured from the government for the reconstruction of the highway. Out of this, Rs. 7.5 billion is allocated for the three sections in Kavrepalanchok District and Rs. 1 billion for the Sindhuli section. Discussions are ongoing with the Japan International Cooperation Agency (JICA) regarding the challenging and winding 5.5-kilometre segment from Barkhekhola to Dalabensi, and JICA shows interest in conducting a field study and potentially undertaking the project. JICA also conducts a feasibility study to construct a tunnel between Khurkot and Chiyabari in Sindhuli, which helps shorten the BP Highway. In anticipation of the upcoming monsoon season and the potential impact on transportation, the Division Road Office in Bhaktapur raises the height of the temporary road built along the flood-damaged areas of the BP Highway.
Restricted to Editorial Use Only.
Commercial use is not permitted without prior authorization.
Please contact us for more information.
#13130395
26 December 2025
Vehicles drive through the diversions along the BP Highway in Kavrepalanchowk District, Nepal, on December 26, 2025, after it is swept away by a flash flood in September 2024. The section of the BP Highway between Katunje and Barkhekhola is severely damaged by the flash flood in the Rosi River in September 2024. Three sections are rebuilt under the funding of the government of Nepal, while the Japanese government is requested to support the rebuilding of the fourth section. A total budget assurance of Rs. 8.5 billion is secured from the government for the reconstruction of the highway. Out of this, Rs. 7.5 billion is allocated for the three sections in Kavrepalanchok District and Rs. 1 billion for the Sindhuli section. Discussions are ongoing with the Japan International Cooperation Agency (JICA) regarding the challenging and winding 5.5-kilometre segment from Barkhekhola to Dalabensi, and JICA shows interest in conducting a field study and potentially undertaking the project. JICA also conducts a feasibility study to construct a tunnel between Khurkot and Chiyabari in Sindhuli, which helps shorten the BP Highway. In anticipation of the upcoming monsoon season and the potential impact on transportation, the Division Road Office in Bhaktapur raises the height of the temporary road built along the flood-damaged areas of the BP Highway.
Restricted to Editorial Use Only.
Commercial use is not permitted without prior authorization.
Please contact us for more information.
#13130396
26 December 2025
Vehicles drive through the diversions along the BP Highway in Kavrepalanchowk District, Nepal, on December 26, 2025, after it is swept away by a flash flood in September 2024. The section of the BP Highway between Katunje and Barkhekhola is severely damaged by the flash flood in the Rosi River in September 2024. Three sections are rebuilt under the funding of the government of Nepal, while the Japanese government is requested to support the rebuilding of the fourth section. A total budget assurance of Rs. 8.5 billion is secured from the government for the reconstruction of the highway. Out of this, Rs. 7.5 billion is allocated for the three sections in Kavrepalanchok District and Rs. 1 billion for the Sindhuli section. Discussions are ongoing with the Japan International Cooperation Agency (JICA) regarding the challenging and winding 5.5-kilometre segment from Barkhekhola to Dalabensi, and JICA shows interest in conducting a field study and potentially undertaking the project. JICA also conducts a feasibility study to construct a tunnel between Khurkot and Chiyabari in Sindhuli, which helps shorten the BP Highway. In anticipation of the upcoming monsoon season and the potential impact on transportation, the Division Road Office in Bhaktapur raises the height of the temporary road built along the flood-damaged areas of the BP Highway.
Restricted to Editorial Use Only.
Commercial use is not permitted without prior authorization.
Please contact us for more information.
#13130397
26 December 2025
Vehicles drive through the diversions along the BP Highway in Kavrepalanchowk District, Nepal, on December 26, 2025, after it is swept away by a flash flood in September 2024. The section of the BP Highway between Katunje and Barkhekhola is severely damaged by the flash flood in the Rosi River in September 2024. Three sections are rebuilt under the funding of the government of Nepal, while the Japanese government is requested to support the rebuilding of the fourth section. A total budget assurance of Rs. 8.5 billion is secured from the government for the reconstruction of the highway. Out of this, Rs. 7.5 billion is allocated for the three sections in Kavrepalanchok District and Rs. 1 billion for the Sindhuli section. Discussions are ongoing with the Japan International Cooperation Agency (JICA) regarding the challenging and winding 5.5-kilometre segment from Barkhekhola to Dalabensi, and JICA shows interest in conducting a field study and potentially undertaking the project. JICA also conducts a feasibility study to construct a tunnel between Khurkot and Chiyabari in Sindhuli, which helps shorten the BP Highway. In anticipation of the upcoming monsoon season and the potential impact on transportation, the Division Road Office in Bhaktapur raises the height of the temporary road built along the flood-damaged areas of the BP Highway.
Restricted to Editorial Use Only.
Commercial use is not permitted without prior authorization.
Please contact us for more information.
#13130398
26 December 2025
Vehicles drive through the diversions along the BP Highway in Kavrepalanchowk District, Nepal, on December 26, 2025, after it is swept away by a flash flood in September 2024. The section of the BP Highway between Katunje and Barkhekhola is severely damaged by the flash flood in the Rosi River in September 2024. Three sections are rebuilt under the funding of the government of Nepal, while the Japanese government is requested to support the rebuilding of the fourth section. A total budget assurance of Rs. 8.5 billion is secured from the government for the reconstruction of the highway. Out of this, Rs. 7.5 billion is allocated for the three sections in Kavrepalanchok District and Rs. 1 billion for the Sindhuli section. Discussions are ongoing with the Japan International Cooperation Agency (JICA) regarding the challenging and winding 5.5-kilometre segment from Barkhekhola to Dalabensi, and JICA shows interest in conducting a field study and potentially undertaking the project. JICA also conducts a feasibility study to construct a tunnel between Khurkot and Chiyabari in Sindhuli, which helps shorten the BP Highway. In anticipation of the upcoming monsoon season and the potential impact on transportation, the Division Road Office in Bhaktapur raises the height of the temporary road built along the flood-damaged areas of the BP Highway.
Restricted to Editorial Use Only.
Commercial use is not permitted without prior authorization.
Please contact us for more information.
#13130399
26 December 2025
Vehicles drive through the diversions along the BP Highway in Kavrepalanchowk District, Nepal, on December 26, 2025, after it is swept away by a flash flood in September 2024. The section of the BP Highway between Katunje and Barkhekhola is severely damaged by the flash flood in the Rosi River in September 2024. Three sections are rebuilt under the funding of the government of Nepal, while the Japanese government is requested to support the rebuilding of the fourth section. A total budget assurance of Rs. 8.5 billion is secured from the government for the reconstruction of the highway. Out of this, Rs. 7.5 billion is allocated for the three sections in Kavrepalanchok District and Rs. 1 billion for the Sindhuli section. Discussions are ongoing with the Japan International Cooperation Agency (JICA) regarding the challenging and winding 5.5-kilometre segment from Barkhekhola to Dalabensi, and JICA shows interest in conducting a field study and potentially undertaking the project. JICA also conducts a feasibility study to construct a tunnel between Khurkot and Chiyabari in Sindhuli, which helps shorten the BP Highway. In anticipation of the upcoming monsoon season and the potential impact on transportation, the Division Road Office in Bhaktapur raises the height of the temporary road built along the flood-damaged areas of the BP Highway.
Restricted to Editorial Use Only.
Commercial use is not permitted without prior authorization.
Please contact us for more information.
#13130401
26 December 2025
Vehicles drive through the diversions along the BP Highway in Kavrepalanchowk District, Nepal, on December 26, 2025, after it is swept away by a flash flood in September 2024. The section of the BP Highway between Katunje and Barkhekhola is severely damaged by the flash flood in the Rosi River in September 2024. Three sections are rebuilt under the funding of the government of Nepal, while the Japanese government is requested to support the rebuilding of the fourth section. A total budget assurance of Rs. 8.5 billion is secured from the government for the reconstruction of the highway. Out of this, Rs. 7.5 billion is allocated for the three sections in Kavrepalanchok District and Rs. 1 billion for the Sindhuli section. Discussions are ongoing with the Japan International Cooperation Agency (JICA) regarding the challenging and winding 5.5-kilometre segment from Barkhekhola to Dalabensi, and JICA shows interest in conducting a field study and potentially undertaking the project. JICA also conducts a feasibility study to construct a tunnel between Khurkot and Chiyabari in Sindhuli, which helps shorten the BP Highway. In anticipation of the upcoming monsoon season and the potential impact on transportation, the Division Road Office in Bhaktapur raises the height of the temporary road built along the flood-damaged areas of the BP Highway.
Restricted to Editorial Use Only.
Commercial use is not permitted without prior authorization.
Please contact us for more information.
#13130403
26 December 2025
Vehicles drive through the diversions along the BP Highway in Kavrepalanchowk District, Nepal, on December 26, 2025, after it is swept away by a flash flood in September 2024. The section of the BP Highway between Katunje and Barkhekhola is severely damaged by the flash flood in the Rosi River in September 2024. Three sections are rebuilt under the funding of the government of Nepal, while the Japanese government is requested to support the rebuilding of the fourth section. A total budget assurance of Rs. 8.5 billion is secured from the government for the reconstruction of the highway. Out of this, Rs. 7.5 billion is allocated for the three sections in Kavrepalanchok District and Rs. 1 billion for the Sindhuli section. Discussions are ongoing with the Japan International Cooperation Agency (JICA) regarding the challenging and winding 5.5-kilometre segment from Barkhekhola to Dalabensi, and JICA shows interest in conducting a field study and potentially undertaking the project. JICA also conducts a feasibility study to construct a tunnel between Khurkot and Chiyabari in Sindhuli, which helps shorten the BP Highway. In anticipation of the upcoming monsoon season and the potential impact on transportation, the Division Road Office in Bhaktapur raises the height of the temporary road built along the flood-damaged areas of the BP Highway.
Restricted to Editorial Use Only.
Commercial use is not permitted without prior authorization.
Please contact us for more information.
Former Nepali President Bidhya Devi Bhandari Visits Torched Government Buildings During Gen-Z Uprising
7 December 2025
#13068889
7 December 2025
Former Nepali President Bidya Devi Bhandari (in blue shawl) walks out from the arson-hit Office of the Prime Minister and Council of Ministers building, one of the torched government buildings inside Singha Durbar, the administrative capital of Nepal, during the Gen-Z uprising in Kathmandu, Nepal, on December 7, 2025. The western section of Singha Durbar is completely damaged due to arson during the Gen-Z movement that takes place on September 8 and 9.
Restricted to Editorial Use Only.
Commercial use is not permitted without prior authorization.
Please contact us for more information.
Former Nepali President Bidhya Devi Bhandari Visits Torched Government Buildings During Gen-Z Uprising
7 December 2025
#13068890
7 December 2025
Former Nepali President Bidya Devi Bhandari (in blue shawl) inspects the torched government buildings inside Singha Durbar, the administrative capital of Nepal, during the Gen-Z uprising in Kathmandu, Nepal, on December 7, 2025. The western section of Singha Durbar is completely damaged due to arson during the Gen-Z movement that takes place on September 8 and 9.
Restricted to Editorial Use Only.
Commercial use is not permitted without prior authorization.
Please contact us for more information.
Former Nepali President Bidhya Devi Bhandari Visits Torched Government Buildings During Gen-Z Uprising
7 December 2025
#13068891
7 December 2025
Former Nepali President Bidya Devi Bhandari (in blue shawl) inspects the torched government buildings inside Singha Durbar, the administrative capital of Nepal, during the Gen-Z uprising in Kathmandu, Nepal, on December 7, 2025. The western section of Singha Durbar is completely damaged due to arson during the Gen-Z movement that takes place on September 8 and 9.
Restricted to Editorial Use Only.
Commercial use is not permitted without prior authorization.
Please contact us for more information.
Former Nepali President Bidhya Devi Bhandari Visits Torched Government Buildings During Gen-Z Uprising
7 December 2025
#13068892
7 December 2025
Former Nepali President Bidya Devi Bhandari (in blue shawl) inspects the torched government buildings inside Singha Durbar, the administrative capital of Nepal, during the Gen-Z uprising in Kathmandu, Nepal, on December 7, 2025. The western section of Singha Durbar is completely damaged due to arson during the Gen-Z movement that takes place on September 8 and 9.
Restricted to Editorial Use Only.
Commercial use is not permitted without prior authorization.
Please contact us for more information.
Former Nepali President Bidhya Devi Bhandari Visits Torched Government Buildings During Gen-Z Uprising
7 December 2025
#13068893
7 December 2025
Former Nepali President Bidya Devi Bhandari (in blue shawl) inspects the torched government buildings inside Singha Durbar, the administrative capital of Nepal, during the Gen-Z uprising in Kathmandu, Nepal, on December 7, 2025. The western section of Singha Durbar is completely damaged due to arson during the Gen-Z movement that takes place on September 8 and 9.
Restricted to Editorial Use Only.
Commercial use is not permitted without prior authorization.
Please contact us for more information.