Skip to main content
NurPhoto Agency Logo
  • Home
  • Editorial Pictures
    • Unrest, Conflicts and War
    • Arts, Culture and Entertainment
    • Sports

    • All Categories

    • Latest Galleries
  • Reportage
  • News of the Week
  • Videos
  • (0)
  • Login
  • Register

Search Editorial Photos

Enter keywords to search our editorial photo archive
  1. Home
  2. Search
  3. governmental projects

Refine Results

Active Filters:
Sort By
Content Type
Location
People

"governmental projects"

8,099 professional editorial images found

Loading search results...
Vehicles drive through the diversions along the BP Highway in Kavrepalanchowk District, Nepal, on December 26, 2025, after it is swept away...

#13130393

Nepal's BP Highway Resumes Operations After 2024 Floods

26 December 2025

Vehicles drive through the diversions along the BP Highway in Kavrepalanchowk District, Nepal, on December 26, 2025, after it is swept away...

#13130393

26 December 2025

Vehicles drive through the diversions along the BP Highway in Kavrepalanchowk District, Nepal, on December 26, 2025, after it is swept away by a flash flood in September 2024. The section of the BP Highway between Katunje and Barkhekhola is severely damaged by the flash flood in the Rosi River in September 2024. Three sections are rebuilt under the funding of the government of Nepal, while the Japanese government is requested to support the rebuilding of the fourth section. A total budget assurance of Rs. 8.5 billion is secured from the government for the reconstruction of the highway. Out of this, Rs. 7.5 billion is allocated for the three sections in Kavrepalanchok District and Rs. 1 billion for the Sindhuli section. Discussions are ongoing with the Japan International Cooperation Agency (JICA) regarding the challenging and winding 5.5-kilometre segment from Barkhekhola to Dalabensi, and JICA shows interest in conducting a field study and potentially undertaking the project. JICA also conducts a feasibility study to construct a tunnel between Khurkot and Chiyabari in Sindhuli, which helps shorten the BP Highway. In anticipation of the upcoming monsoon season and the potential impact on transportation, the Division Road Office in Bhaktapur raises the height of the temporary road built along the flood-damaged areas of the BP Highway.


Restricted to Editorial Use Only.
Commercial use is not permitted without prior authorization.
Please contact us for more information.


Vehicles drive through the diversions along the BP Highway in Kavrepalanchowk District, Nepal, on December 26, 2025, after it is swept away...

#13130394

Nepal's BP Highway Resumes Operations After 2024 Floods

26 December 2025

Vehicles drive through the diversions along the BP Highway in Kavrepalanchowk District, Nepal, on December 26, 2025, after it is swept away...

#13130394

26 December 2025

Vehicles drive through the diversions along the BP Highway in Kavrepalanchowk District, Nepal, on December 26, 2025, after it is swept away by a flash flood in September 2024. The section of the BP Highway between Katunje and Barkhekhola is severely damaged by the flash flood in the Rosi River in September 2024. Three sections are rebuilt under the funding of the government of Nepal, while the Japanese government is requested to support the rebuilding of the fourth section. A total budget assurance of Rs. 8.5 billion is secured from the government for the reconstruction of the highway. Out of this, Rs. 7.5 billion is allocated for the three sections in Kavrepalanchok District and Rs. 1 billion for the Sindhuli section. Discussions are ongoing with the Japan International Cooperation Agency (JICA) regarding the challenging and winding 5.5-kilometre segment from Barkhekhola to Dalabensi, and JICA shows interest in conducting a field study and potentially undertaking the project. JICA also conducts a feasibility study to construct a tunnel between Khurkot and Chiyabari in Sindhuli, which helps shorten the BP Highway. In anticipation of the upcoming monsoon season and the potential impact on transportation, the Division Road Office in Bhaktapur raises the height of the temporary road built along the flood-damaged areas of the BP Highway.


Restricted to Editorial Use Only.
Commercial use is not permitted without prior authorization.
Please contact us for more information.


Vehicles drive through the diversions along the BP Highway in Kavrepalanchowk District, Nepal, on December 26, 2025, after it is swept away...

#13130395

Nepal's BP Highway Resumes Operations After 2024 Floods

26 December 2025

Vehicles drive through the diversions along the BP Highway in Kavrepalanchowk District, Nepal, on December 26, 2025, after it is swept away...

#13130395

26 December 2025

Vehicles drive through the diversions along the BP Highway in Kavrepalanchowk District, Nepal, on December 26, 2025, after it is swept away by a flash flood in September 2024. The section of the BP Highway between Katunje and Barkhekhola is severely damaged by the flash flood in the Rosi River in September 2024. Three sections are rebuilt under the funding of the government of Nepal, while the Japanese government is requested to support the rebuilding of the fourth section. A total budget assurance of Rs. 8.5 billion is secured from the government for the reconstruction of the highway. Out of this, Rs. 7.5 billion is allocated for the three sections in Kavrepalanchok District and Rs. 1 billion for the Sindhuli section. Discussions are ongoing with the Japan International Cooperation Agency (JICA) regarding the challenging and winding 5.5-kilometre segment from Barkhekhola to Dalabensi, and JICA shows interest in conducting a field study and potentially undertaking the project. JICA also conducts a feasibility study to construct a tunnel between Khurkot and Chiyabari in Sindhuli, which helps shorten the BP Highway. In anticipation of the upcoming monsoon season and the potential impact on transportation, the Division Road Office in Bhaktapur raises the height of the temporary road built along the flood-damaged areas of the BP Highway.


Restricted to Editorial Use Only.
Commercial use is not permitted without prior authorization.
Please contact us for more information.


Vehicles drive through the diversions along the BP Highway in Kavrepalanchowk District, Nepal, on December 26, 2025, after it is swept away...

#13130396

Nepal's BP Highway Resumes Operations After 2024 Floods

26 December 2025

Vehicles drive through the diversions along the BP Highway in Kavrepalanchowk District, Nepal, on December 26, 2025, after it is swept away...

#13130396

26 December 2025

Vehicles drive through the diversions along the BP Highway in Kavrepalanchowk District, Nepal, on December 26, 2025, after it is swept away by a flash flood in September 2024. The section of the BP Highway between Katunje and Barkhekhola is severely damaged by the flash flood in the Rosi River in September 2024. Three sections are rebuilt under the funding of the government of Nepal, while the Japanese government is requested to support the rebuilding of the fourth section. A total budget assurance of Rs. 8.5 billion is secured from the government for the reconstruction of the highway. Out of this, Rs. 7.5 billion is allocated for the three sections in Kavrepalanchok District and Rs. 1 billion for the Sindhuli section. Discussions are ongoing with the Japan International Cooperation Agency (JICA) regarding the challenging and winding 5.5-kilometre segment from Barkhekhola to Dalabensi, and JICA shows interest in conducting a field study and potentially undertaking the project. JICA also conducts a feasibility study to construct a tunnel between Khurkot and Chiyabari in Sindhuli, which helps shorten the BP Highway. In anticipation of the upcoming monsoon season and the potential impact on transportation, the Division Road Office in Bhaktapur raises the height of the temporary road built along the flood-damaged areas of the BP Highway.


Restricted to Editorial Use Only.
Commercial use is not permitted without prior authorization.
Please contact us for more information.


Vehicles drive through the diversions along the BP Highway in Kavrepalanchowk District, Nepal, on December 26, 2025, after it is swept away...

#13130397

Nepal's BP Highway Resumes Operations After 2024 Floods

26 December 2025

Vehicles drive through the diversions along the BP Highway in Kavrepalanchowk District, Nepal, on December 26, 2025, after it is swept away...

#13130397

26 December 2025

Vehicles drive through the diversions along the BP Highway in Kavrepalanchowk District, Nepal, on December 26, 2025, after it is swept away by a flash flood in September 2024. The section of the BP Highway between Katunje and Barkhekhola is severely damaged by the flash flood in the Rosi River in September 2024. Three sections are rebuilt under the funding of the government of Nepal, while the Japanese government is requested to support the rebuilding of the fourth section. A total budget assurance of Rs. 8.5 billion is secured from the government for the reconstruction of the highway. Out of this, Rs. 7.5 billion is allocated for the three sections in Kavrepalanchok District and Rs. 1 billion for the Sindhuli section. Discussions are ongoing with the Japan International Cooperation Agency (JICA) regarding the challenging and winding 5.5-kilometre segment from Barkhekhola to Dalabensi, and JICA shows interest in conducting a field study and potentially undertaking the project. JICA also conducts a feasibility study to construct a tunnel between Khurkot and Chiyabari in Sindhuli, which helps shorten the BP Highway. In anticipation of the upcoming monsoon season and the potential impact on transportation, the Division Road Office in Bhaktapur raises the height of the temporary road built along the flood-damaged areas of the BP Highway.


Restricted to Editorial Use Only.
Commercial use is not permitted without prior authorization.
Please contact us for more information.


Vehicles drive through the diversions along the BP Highway in Kavrepalanchowk District, Nepal, on December 26, 2025, after it is swept away...

#13130398

Nepal's BP Highway Resumes Operations After 2024 Floods

26 December 2025

Vehicles drive through the diversions along the BP Highway in Kavrepalanchowk District, Nepal, on December 26, 2025, after it is swept away...

#13130398

26 December 2025

Vehicles drive through the diversions along the BP Highway in Kavrepalanchowk District, Nepal, on December 26, 2025, after it is swept away by a flash flood in September 2024. The section of the BP Highway between Katunje and Barkhekhola is severely damaged by the flash flood in the Rosi River in September 2024. Three sections are rebuilt under the funding of the government of Nepal, while the Japanese government is requested to support the rebuilding of the fourth section. A total budget assurance of Rs. 8.5 billion is secured from the government for the reconstruction of the highway. Out of this, Rs. 7.5 billion is allocated for the three sections in Kavrepalanchok District and Rs. 1 billion for the Sindhuli section. Discussions are ongoing with the Japan International Cooperation Agency (JICA) regarding the challenging and winding 5.5-kilometre segment from Barkhekhola to Dalabensi, and JICA shows interest in conducting a field study and potentially undertaking the project. JICA also conducts a feasibility study to construct a tunnel between Khurkot and Chiyabari in Sindhuli, which helps shorten the BP Highway. In anticipation of the upcoming monsoon season and the potential impact on transportation, the Division Road Office in Bhaktapur raises the height of the temporary road built along the flood-damaged areas of the BP Highway.


Restricted to Editorial Use Only.
Commercial use is not permitted without prior authorization.
Please contact us for more information.


Vehicles drive through the diversions along the BP Highway in Kavrepalanchowk District, Nepal, on December 26, 2025, after it is swept away...

#13130399

Nepal's BP Highway Resumes Operations After 2024 Floods

26 December 2025

Vehicles drive through the diversions along the BP Highway in Kavrepalanchowk District, Nepal, on December 26, 2025, after it is swept away...

#13130399

26 December 2025

Vehicles drive through the diversions along the BP Highway in Kavrepalanchowk District, Nepal, on December 26, 2025, after it is swept away by a flash flood in September 2024. The section of the BP Highway between Katunje and Barkhekhola is severely damaged by the flash flood in the Rosi River in September 2024. Three sections are rebuilt under the funding of the government of Nepal, while the Japanese government is requested to support the rebuilding of the fourth section. A total budget assurance of Rs. 8.5 billion is secured from the government for the reconstruction of the highway. Out of this, Rs. 7.5 billion is allocated for the three sections in Kavrepalanchok District and Rs. 1 billion for the Sindhuli section. Discussions are ongoing with the Japan International Cooperation Agency (JICA) regarding the challenging and winding 5.5-kilometre segment from Barkhekhola to Dalabensi, and JICA shows interest in conducting a field study and potentially undertaking the project. JICA also conducts a feasibility study to construct a tunnel between Khurkot and Chiyabari in Sindhuli, which helps shorten the BP Highway. In anticipation of the upcoming monsoon season and the potential impact on transportation, the Division Road Office in Bhaktapur raises the height of the temporary road built along the flood-damaged areas of the BP Highway.


Restricted to Editorial Use Only.
Commercial use is not permitted without prior authorization.
Please contact us for more information.


Vehicles drive through the diversions along the BP Highway in Kavrepalanchowk District, Nepal, on December 26, 2025, after it is swept away...

#13130401

Nepal's BP Highway Resumes Operations After 2024 Floods

26 December 2025

Vehicles drive through the diversions along the BP Highway in Kavrepalanchowk District, Nepal, on December 26, 2025, after it is swept away...

#13130401

26 December 2025

Vehicles drive through the diversions along the BP Highway in Kavrepalanchowk District, Nepal, on December 26, 2025, after it is swept away by a flash flood in September 2024. The section of the BP Highway between Katunje and Barkhekhola is severely damaged by the flash flood in the Rosi River in September 2024. Three sections are rebuilt under the funding of the government of Nepal, while the Japanese government is requested to support the rebuilding of the fourth section. A total budget assurance of Rs. 8.5 billion is secured from the government for the reconstruction of the highway. Out of this, Rs. 7.5 billion is allocated for the three sections in Kavrepalanchok District and Rs. 1 billion for the Sindhuli section. Discussions are ongoing with the Japan International Cooperation Agency (JICA) regarding the challenging and winding 5.5-kilometre segment from Barkhekhola to Dalabensi, and JICA shows interest in conducting a field study and potentially undertaking the project. JICA also conducts a feasibility study to construct a tunnel between Khurkot and Chiyabari in Sindhuli, which helps shorten the BP Highway. In anticipation of the upcoming monsoon season and the potential impact on transportation, the Division Road Office in Bhaktapur raises the height of the temporary road built along the flood-damaged areas of the BP Highway.


Restricted to Editorial Use Only.
Commercial use is not permitted without prior authorization.
Please contact us for more information.


Vehicles drive through the diversions along the BP Highway in Kavrepalanchowk District, Nepal, on December 26, 2025, after it is swept away...

#13130403

Nepal's BP Highway Resumes Operations After 2024 Floods

26 December 2025

Vehicles drive through the diversions along the BP Highway in Kavrepalanchowk District, Nepal, on December 26, 2025, after it is swept away...

#13130403

26 December 2025

Vehicles drive through the diversions along the BP Highway in Kavrepalanchowk District, Nepal, on December 26, 2025, after it is swept away by a flash flood in September 2024. The section of the BP Highway between Katunje and Barkhekhola is severely damaged by the flash flood in the Rosi River in September 2024. Three sections are rebuilt under the funding of the government of Nepal, while the Japanese government is requested to support the rebuilding of the fourth section. A total budget assurance of Rs. 8.5 billion is secured from the government for the reconstruction of the highway. Out of this, Rs. 7.5 billion is allocated for the three sections in Kavrepalanchok District and Rs. 1 billion for the Sindhuli section. Discussions are ongoing with the Japan International Cooperation Agency (JICA) regarding the challenging and winding 5.5-kilometre segment from Barkhekhola to Dalabensi, and JICA shows interest in conducting a field study and potentially undertaking the project. JICA also conducts a feasibility study to construct a tunnel between Khurkot and Chiyabari in Sindhuli, which helps shorten the BP Highway. In anticipation of the upcoming monsoon season and the potential impact on transportation, the Division Road Office in Bhaktapur raises the height of the temporary road built along the flood-damaged areas of the BP Highway.


Restricted to Editorial Use Only.
Commercial use is not permitted without prior authorization.
Please contact us for more information.


On December 18, 2025, in Brazil, President Lula da Silva inaugurates the model of the Sao Francisco River transposition project and uses vir...

#13110273

Lula's Sao Francisco River Transposition Project In Northeast Brazil

19 December 2025

On December 18, 2025, in Brazil, President Lula da Silva inaugurates the model of the Sao Francisco River transposition project and uses vir...

#13110273

19 December 2025

On December 18, 2025, in Brazil, President Lula da Silva inaugurates the model of the Sao Francisco River transposition project and uses virtual reality glasses. The inauguration is attended by Hugo Motta, President of the Chamber of Deputies.


Restricted to Editorial Use Only.
Commercial use is not permitted without prior authorization.
Please contact us for more information.


On December 18, 2025, in Brazil, President Lula da Silva inaugurates the model of the Sao Francisco River transposition project and uses vir...

#13110274

Lula's Sao Francisco River Transposition Project In Northeast Brazil

19 December 2025

On December 18, 2025, in Brazil, President Lula da Silva inaugurates the model of the Sao Francisco River transposition project and uses vir...

#13110274

19 December 2025

On December 18, 2025, in Brazil, President Lula da Silva inaugurates the model of the Sao Francisco River transposition project and uses virtual reality glasses. The inauguration is attended by Hugo Motta, President of the Chamber of Deputies.


Restricted to Editorial Use Only.
Commercial use is not permitted without prior authorization.
Please contact us for more information.


On December 18, 2025, in Brazil, President Lula da Silva inaugurates the model of the Sao Francisco River transposition project and uses vir...

#13110277

Lula's Sao Francisco River Transposition Project In Northeast Brazil

19 December 2025

On December 18, 2025, in Brazil, President Lula da Silva inaugurates the model of the Sao Francisco River transposition project and uses vir...

#13110277

19 December 2025

On December 18, 2025, in Brazil, President Lula da Silva inaugurates the model of the Sao Francisco River transposition project and uses virtual reality glasses. The inauguration is attended by Hugo Motta, President of the Chamber of Deputies.


Restricted to Editorial Use Only.
Commercial use is not permitted without prior authorization.
Please contact us for more information.


On December 18, 2025, in Brazil, President Lula da Silva inaugurates the model of the Sao Francisco River transposition project and uses vir...

#13110278

Lula's Sao Francisco River Transposition Project In Northeast Brazil

19 December 2025

On December 18, 2025, in Brazil, President Lula da Silva inaugurates the model of the Sao Francisco River transposition project and uses vir...

#13110278

19 December 2025

On December 18, 2025, in Brazil, President Lula da Silva inaugurates the model of the Sao Francisco River transposition project and uses virtual reality glasses. The inauguration is attended by Hugo Motta, President of the Chamber of Deputies.


Restricted to Editorial Use Only.
Commercial use is not permitted without prior authorization.
Please contact us for more information.


On December 18, 2025, in Brazil, President Lula da Silva inaugurates the model of the Sao Francisco River transposition project and uses vir...

#13110279

Lula's Sao Francisco River Transposition Project In Northeast Brazil

19 December 2025

On December 18, 2025, in Brazil, President Lula da Silva inaugurates the model of the Sao Francisco River transposition project and uses vir...

#13110279

19 December 2025

On December 18, 2025, in Brazil, President Lula da Silva inaugurates the model of the Sao Francisco River transposition project and uses virtual reality glasses. The inauguration is attended by Hugo Motta, President of the Chamber of Deputies.


Restricted to Editorial Use Only.
Commercial use is not permitted without prior authorization.
Please contact us for more information.


On December 18, 2025, in Brazil, President Lula da Silva inaugurates the model of the Sao Francisco River transposition project and uses vir...

#13110282

Lula's Sao Francisco River Transposition Project In Northeast Brazil

19 December 2025

On December 18, 2025, in Brazil, President Lula da Silva inaugurates the model of the Sao Francisco River transposition project and uses vir...

#13110282

19 December 2025

On December 18, 2025, in Brazil, President Lula da Silva inaugurates the model of the Sao Francisco River transposition project and uses virtual reality glasses. The inauguration is attended by Hugo Motta, President of the Chamber of Deputies.


Restricted to Editorial Use Only.
Commercial use is not permitted without prior authorization.
Please contact us for more information.


On December 18, 2025, in Brazil, President Lula da Silva inaugurates the model of the Sao Francisco River transposition project and uses vir...

#13110285

Lula's Sao Francisco River Transposition Project In Northeast Brazil

19 December 2025

On December 18, 2025, in Brazil, President Lula da Silva inaugurates the model of the Sao Francisco River transposition project and uses vir...

#13110285

19 December 2025

On December 18, 2025, in Brazil, President Lula da Silva inaugurates the model of the Sao Francisco River transposition project and uses virtual reality glasses. The inauguration is attended by Hugo Motta, President of the Chamber of Deputies.


Restricted to Editorial Use Only.
Commercial use is not permitted without prior authorization.
Please contact us for more information.


of 507
Next
NurPhoto Logo

Independent photojournalistic agency delivering global visual storytelling since 2013. Trusted by leading media organizations worldwide.

Company
  • About Us
  • Work With Us
  • Contact Us
  • Reportages
Services
  • Editorial Pictures
  • Assignments
  • Research Services
  • Fine Art Prints
  • Creative Content
Resources
  • License Terms
  • Terms of Service
  • Privacy Policy
  • Support Center
Connect With Us
[email protected]
24/7 Support
Follow Our Stories

© 2013-2025 NurPhoto S.r.l. All rights reserved. | VAT IT01921690663

We accept:
Click outside this window to close it