Skip to main content
NurPhoto Agency Logo
  • Home
  • Editorial Pictures
    Categories
    • Unrest, Conflicts and War
    • Arts, Culture and Entertainment
    • Sports
    All Categories
    Unrest, Conflicts and War
    Nepali Activists Calls For Peace In Middle-East Amid Ongoing Tension Between The Iran And Israel 11 photos NEW
    Mar 19, 2026

    Nepali Activists Calls For Peace In Middle-East Amid Ongoing Tension Between The Iran And Israel

    Kathmandu Activists Stage Coordinated Protests Calling For End To US/Israel–Iran Conflict 56 photos NEW
    Mar 19, 2026

    Kathmandu Activists Stage Coordinated Protests Calling For End To US/Israel–Iran Conflict

    Cotton University Students Protest Over Unresolved Issues 14 photos NEW
    Mar 19, 2026

    Cotton University Students Protest Over Unresolved Issues

    Daily Life In War Zone On Eve Of Iranian New Year 36 photos
    Mar 19, 2026

    Daily Life In War Zone On Eve Of Iranian New Year

    The Alliance for Children's Rights 34th Annual Champions For Children Gala 23 photos NEW
    Mar 20, 2026

    The Alliance for Children's Rights 34th Annual Champions For Children Gala

    Kate Nash Performing Live At The Roundhouse, London On 19 March 2026 13 photos NEW
    Mar 20, 2026

    Kate Nash Performing Live At The Roundhouse, London On 19 March 2026

    Nicole Scherzinger, Kimberly Wyatt, And Ashley Roberts Light The Empire State Building 13 photos NEW
    Mar 20, 2026

    Nicole Scherzinger, Kimberly Wyatt, And Ashley Roberts Light The Empire State Building

    Umberto Tozzi Performs During His Farewell Tour "L'Ultima Notte Rosa - The Final Show" Tour In Milan 8 photos NEW
    Mar 20, 2026

    Umberto Tozzi Performs During His Farewell Tour "L'Ultima Notte Rosa - The Final Show" Tour In Milan

    Men’s 2026 Volleyball World Beach Pro Tour  - Qualifications 35 photos NEW
    Mar 20, 2026

    Men’s 2026 Volleyball World Beach Pro Tour - Qualifications

    F1 Grand Prix Of China 138 photos NEW
    Mar 20, 2026

    F1 Grand Prix Of China

    AS Roma v Bologna FC 1909 - UEFA Europa League 2025/26 Round of 16 Second Leg 40 photos NEW
    Mar 20, 2026

    AS Roma v Bologna FC 1909 - UEFA Europa League 2025/26 Round of 16 Second Leg

    Olympiacos Piraeus v Kosner Baskonia Vitoria-Gasteiz - Euroleague 2025/2026 38 photos NEW
    Mar 20, 2026

    Olympiacos Piraeus v Kosner Baskonia Vitoria-Gasteiz - Euroleague 2025/2026

    View all in Unrest, Conflicts and War Browse All Galleries
  • News of the Week
  • Wire
  • Videos
    • My Boards
    • Loading...
    • View All Boards
  • Login
  • Register

Search Editorial Photos

Keywords Enter keywords to search our editorial photo archive
Category
  1. Home
  2. Search
  3. section damaged

Refine Results

Active Filters:
Sort By
Content Type
Location
People

"section damaged"

784 professional editorial images found

Loading search results...
Workers prepare to lift a section of a pipe at Kyiv CHPP-4, which is severely damaged in a massive Russian missile attack in Kyiv, Ukraine,... Editorial
Severely damaged Darnytska CHPP in Kyiv after massive Russian attack
6 Feb 2026 · Kyiv, Ukraine
#13281012
Workers prepare to lift a section of a pipe at Kyiv CHPP-4, which is severely damaged in a massive Russian missile attack in Kyiv, Ukraine,...

#13281012

6 Feb 2026

Workers prepare to lift a section of a pipe at Kyiv CHPP-4, which is severely damaged in a massive Russian missile attack in Kyiv, Ukraine, on February 6, 2026. On the night of February 2-3, Russian forces strike the heating system of Kyiv CHPP-4 (Darnytska CHPP) with five ballistic missiles, causing critical damage and forcing its shutdown. As a result, 1,129 residential buildings in Dniprovskyi and part of Darnytskyi districts, along with 46 schools, 72 kindergartens, 18 medical institutions, and other social and urban infrastructure facilities, are left without heating and hot water amid temperatures of -25?C.


Restricted to Editorial Use Only.
Commercial use is not permitted without prior authorization.
Please contact us for more information.


Workers prepare to lift a section of a pipe at Kyiv CHPP-4, which is severely damaged in a massive Russian missile attack in Kyiv, Ukraine,... Editorial
Severely damaged Darnytska CHPP in Kyiv after massive Russian attack
6 Feb 2026 · Kyiv, Ukraine
#13281013
Workers prepare to lift a section of a pipe at Kyiv CHPP-4, which is severely damaged in a massive Russian missile attack in Kyiv, Ukraine,...

#13281013

6 Feb 2026

Workers prepare to lift a section of a pipe at Kyiv CHPP-4, which is severely damaged in a massive Russian missile attack in Kyiv, Ukraine, on February 6, 2026. On the night of February 2-3, Russian forces strike the heating system of Kyiv CHPP-4 (Darnytska CHPP) with five ballistic missiles, causing critical damage and forcing its shutdown. As a result, 1,129 residential buildings in Dniprovskyi and part of Darnytskyi districts, along with 46 schools, 72 kindergartens, 18 medical institutions, and other social and urban infrastructure facilities, are left without heating and hot water amid temperatures of -25?C.


Restricted to Editorial Use Only.
Commercial use is not permitted without prior authorization.
Please contact us for more information.


Vehicles drive through the diversions along the BP Highway in Kavrepalanchowk District, Nepal, on December 26, 2025, after it is swept away... Editorial
Nepal's BP Highway Resumes Operations After 2024 Floods
26 Dec 2025 · KAVREPALANCHOWK, Nepal
#13130393
Vehicles drive through the diversions along the BP Highway in Kavrepalanchowk District, Nepal, on December 26, 2025, after it is swept away...

#13130393

26 Dec 2025

Vehicles drive through the diversions along the BP Highway in Kavrepalanchowk District, Nepal, on December 26, 2025, after it is swept away by a flash flood in September 2024. The section of the BP Highway between Katunje and Barkhekhola is severely damaged by the flash flood in the Rosi River in September 2024. Three sections are rebuilt under the funding of the government of Nepal, while the Japanese government is requested to support the rebuilding of the fourth section. A total budget assurance of Rs. 8.5 billion is secured from the government for the reconstruction of the highway. Out of this, Rs. 7.5 billion is allocated for the three sections in Kavrepalanchok District and Rs. 1 billion for the Sindhuli section. Discussions are ongoing with the Japan International Cooperation Agency (JICA) regarding the challenging and winding 5.5-kilometre segment from Barkhekhola to Dalabensi, and JICA shows interest in conducting a field study and potentially undertaking the project. JICA also conducts a feasibility study to construct a tunnel between Khurkot and Chiyabari in Sindhuli, which helps shorten the BP Highway. In anticipation of the upcoming monsoon season and the potential impact on transportation, the Division Road Office in Bhaktapur raises the height of the temporary road built along the flood-damaged areas of the BP Highway.


Restricted to Editorial Use Only.
Commercial use is not permitted without prior authorization.
Please contact us for more information.


Vehicles drive through the diversions along the BP Highway in Kavrepalanchowk District, Nepal, on December 26, 2025, after it is swept away... Editorial
Nepal's BP Highway Resumes Operations After 2024 Floods
26 Dec 2025 · KAVREPALANCHOWK, Nepal
#13130394
Vehicles drive through the diversions along the BP Highway in Kavrepalanchowk District, Nepal, on December 26, 2025, after it is swept away...

#13130394

26 Dec 2025

Vehicles drive through the diversions along the BP Highway in Kavrepalanchowk District, Nepal, on December 26, 2025, after it is swept away by a flash flood in September 2024. The section of the BP Highway between Katunje and Barkhekhola is severely damaged by the flash flood in the Rosi River in September 2024. Three sections are rebuilt under the funding of the government of Nepal, while the Japanese government is requested to support the rebuilding of the fourth section. A total budget assurance of Rs. 8.5 billion is secured from the government for the reconstruction of the highway. Out of this, Rs. 7.5 billion is allocated for the three sections in Kavrepalanchok District and Rs. 1 billion for the Sindhuli section. Discussions are ongoing with the Japan International Cooperation Agency (JICA) regarding the challenging and winding 5.5-kilometre segment from Barkhekhola to Dalabensi, and JICA shows interest in conducting a field study and potentially undertaking the project. JICA also conducts a feasibility study to construct a tunnel between Khurkot and Chiyabari in Sindhuli, which helps shorten the BP Highway. In anticipation of the upcoming monsoon season and the potential impact on transportation, the Division Road Office in Bhaktapur raises the height of the temporary road built along the flood-damaged areas of the BP Highway.


Restricted to Editorial Use Only.
Commercial use is not permitted without prior authorization.
Please contact us for more information.


Vehicles drive through the diversions along the BP Highway in Kavrepalanchowk District, Nepal, on December 26, 2025, after it is swept away... Editorial
Nepal's BP Highway Resumes Operations After 2024 Floods
26 Dec 2025 · KAVREPALANCHOWK, Nepal
#13130395
Vehicles drive through the diversions along the BP Highway in Kavrepalanchowk District, Nepal, on December 26, 2025, after it is swept away...

#13130395

26 Dec 2025

Vehicles drive through the diversions along the BP Highway in Kavrepalanchowk District, Nepal, on December 26, 2025, after it is swept away by a flash flood in September 2024. The section of the BP Highway between Katunje and Barkhekhola is severely damaged by the flash flood in the Rosi River in September 2024. Three sections are rebuilt under the funding of the government of Nepal, while the Japanese government is requested to support the rebuilding of the fourth section. A total budget assurance of Rs. 8.5 billion is secured from the government for the reconstruction of the highway. Out of this, Rs. 7.5 billion is allocated for the three sections in Kavrepalanchok District and Rs. 1 billion for the Sindhuli section. Discussions are ongoing with the Japan International Cooperation Agency (JICA) regarding the challenging and winding 5.5-kilometre segment from Barkhekhola to Dalabensi, and JICA shows interest in conducting a field study and potentially undertaking the project. JICA also conducts a feasibility study to construct a tunnel between Khurkot and Chiyabari in Sindhuli, which helps shorten the BP Highway. In anticipation of the upcoming monsoon season and the potential impact on transportation, the Division Road Office in Bhaktapur raises the height of the temporary road built along the flood-damaged areas of the BP Highway.


Restricted to Editorial Use Only.
Commercial use is not permitted without prior authorization.
Please contact us for more information.


Vehicles drive through the diversions along the BP Highway in Kavrepalanchowk District, Nepal, on December 26, 2025, after it is swept away... Editorial
Nepal's BP Highway Resumes Operations After 2024 Floods
26 Dec 2025 · KAVREPALANCHOWK, Nepal
#13130396
Vehicles drive through the diversions along the BP Highway in Kavrepalanchowk District, Nepal, on December 26, 2025, after it is swept away...

#13130396

26 Dec 2025

Vehicles drive through the diversions along the BP Highway in Kavrepalanchowk District, Nepal, on December 26, 2025, after it is swept away by a flash flood in September 2024. The section of the BP Highway between Katunje and Barkhekhola is severely damaged by the flash flood in the Rosi River in September 2024. Three sections are rebuilt under the funding of the government of Nepal, while the Japanese government is requested to support the rebuilding of the fourth section. A total budget assurance of Rs. 8.5 billion is secured from the government for the reconstruction of the highway. Out of this, Rs. 7.5 billion is allocated for the three sections in Kavrepalanchok District and Rs. 1 billion for the Sindhuli section. Discussions are ongoing with the Japan International Cooperation Agency (JICA) regarding the challenging and winding 5.5-kilometre segment from Barkhekhola to Dalabensi, and JICA shows interest in conducting a field study and potentially undertaking the project. JICA also conducts a feasibility study to construct a tunnel between Khurkot and Chiyabari in Sindhuli, which helps shorten the BP Highway. In anticipation of the upcoming monsoon season and the potential impact on transportation, the Division Road Office in Bhaktapur raises the height of the temporary road built along the flood-damaged areas of the BP Highway.


Restricted to Editorial Use Only.
Commercial use is not permitted without prior authorization.
Please contact us for more information.


Vehicles drive through the diversions along the BP Highway in Kavrepalanchowk District, Nepal, on December 26, 2025, after it is swept away... Editorial
Nepal's BP Highway Resumes Operations After 2024 Floods
26 Dec 2025 · KAVREPALANCHOWK, Nepal
#13130397
Vehicles drive through the diversions along the BP Highway in Kavrepalanchowk District, Nepal, on December 26, 2025, after it is swept away...

#13130397

26 Dec 2025

Vehicles drive through the diversions along the BP Highway in Kavrepalanchowk District, Nepal, on December 26, 2025, after it is swept away by a flash flood in September 2024. The section of the BP Highway between Katunje and Barkhekhola is severely damaged by the flash flood in the Rosi River in September 2024. Three sections are rebuilt under the funding of the government of Nepal, while the Japanese government is requested to support the rebuilding of the fourth section. A total budget assurance of Rs. 8.5 billion is secured from the government for the reconstruction of the highway. Out of this, Rs. 7.5 billion is allocated for the three sections in Kavrepalanchok District and Rs. 1 billion for the Sindhuli section. Discussions are ongoing with the Japan International Cooperation Agency (JICA) regarding the challenging and winding 5.5-kilometre segment from Barkhekhola to Dalabensi, and JICA shows interest in conducting a field study and potentially undertaking the project. JICA also conducts a feasibility study to construct a tunnel between Khurkot and Chiyabari in Sindhuli, which helps shorten the BP Highway. In anticipation of the upcoming monsoon season and the potential impact on transportation, the Division Road Office in Bhaktapur raises the height of the temporary road built along the flood-damaged areas of the BP Highway.


Restricted to Editorial Use Only.
Commercial use is not permitted without prior authorization.
Please contact us for more information.


Vehicles drive through the diversions along the BP Highway in Kavrepalanchowk District, Nepal, on December 26, 2025, after it is swept away... Editorial
Nepal's BP Highway Resumes Operations After 2024 Floods
26 Dec 2025 · KAVREPALANCHOWK, Nepal
#13130398
Vehicles drive through the diversions along the BP Highway in Kavrepalanchowk District, Nepal, on December 26, 2025, after it is swept away...

#13130398

26 Dec 2025

Vehicles drive through the diversions along the BP Highway in Kavrepalanchowk District, Nepal, on December 26, 2025, after it is swept away by a flash flood in September 2024. The section of the BP Highway between Katunje and Barkhekhola is severely damaged by the flash flood in the Rosi River in September 2024. Three sections are rebuilt under the funding of the government of Nepal, while the Japanese government is requested to support the rebuilding of the fourth section. A total budget assurance of Rs. 8.5 billion is secured from the government for the reconstruction of the highway. Out of this, Rs. 7.5 billion is allocated for the three sections in Kavrepalanchok District and Rs. 1 billion for the Sindhuli section. Discussions are ongoing with the Japan International Cooperation Agency (JICA) regarding the challenging and winding 5.5-kilometre segment from Barkhekhola to Dalabensi, and JICA shows interest in conducting a field study and potentially undertaking the project. JICA also conducts a feasibility study to construct a tunnel between Khurkot and Chiyabari in Sindhuli, which helps shorten the BP Highway. In anticipation of the upcoming monsoon season and the potential impact on transportation, the Division Road Office in Bhaktapur raises the height of the temporary road built along the flood-damaged areas of the BP Highway.


Restricted to Editorial Use Only.
Commercial use is not permitted without prior authorization.
Please contact us for more information.


Vehicles drive through the diversions along the BP Highway in Kavrepalanchowk District, Nepal, on December 26, 2025, after it is swept away... Editorial
Nepal's BP Highway Resumes Operations After 2024 Floods
26 Dec 2025 · KAVREPALANCHOWK, Nepal
#13130399
Vehicles drive through the diversions along the BP Highway in Kavrepalanchowk District, Nepal, on December 26, 2025, after it is swept away...

#13130399

26 Dec 2025

Vehicles drive through the diversions along the BP Highway in Kavrepalanchowk District, Nepal, on December 26, 2025, after it is swept away by a flash flood in September 2024. The section of the BP Highway between Katunje and Barkhekhola is severely damaged by the flash flood in the Rosi River in September 2024. Three sections are rebuilt under the funding of the government of Nepal, while the Japanese government is requested to support the rebuilding of the fourth section. A total budget assurance of Rs. 8.5 billion is secured from the government for the reconstruction of the highway. Out of this, Rs. 7.5 billion is allocated for the three sections in Kavrepalanchok District and Rs. 1 billion for the Sindhuli section. Discussions are ongoing with the Japan International Cooperation Agency (JICA) regarding the challenging and winding 5.5-kilometre segment from Barkhekhola to Dalabensi, and JICA shows interest in conducting a field study and potentially undertaking the project. JICA also conducts a feasibility study to construct a tunnel between Khurkot and Chiyabari in Sindhuli, which helps shorten the BP Highway. In anticipation of the upcoming monsoon season and the potential impact on transportation, the Division Road Office in Bhaktapur raises the height of the temporary road built along the flood-damaged areas of the BP Highway.


Restricted to Editorial Use Only.
Commercial use is not permitted without prior authorization.
Please contact us for more information.


Vehicles drive through the diversions along the BP Highway in Kavrepalanchowk District, Nepal, on December 26, 2025, after it is swept away... Editorial
Nepal's BP Highway Resumes Operations After 2024 Floods
26 Dec 2025 · KAVREPALANCHOWK, Nepal
#13130401
Vehicles drive through the diversions along the BP Highway in Kavrepalanchowk District, Nepal, on December 26, 2025, after it is swept away...

#13130401

26 Dec 2025

Vehicles drive through the diversions along the BP Highway in Kavrepalanchowk District, Nepal, on December 26, 2025, after it is swept away by a flash flood in September 2024. The section of the BP Highway between Katunje and Barkhekhola is severely damaged by the flash flood in the Rosi River in September 2024. Three sections are rebuilt under the funding of the government of Nepal, while the Japanese government is requested to support the rebuilding of the fourth section. A total budget assurance of Rs. 8.5 billion is secured from the government for the reconstruction of the highway. Out of this, Rs. 7.5 billion is allocated for the three sections in Kavrepalanchok District and Rs. 1 billion for the Sindhuli section. Discussions are ongoing with the Japan International Cooperation Agency (JICA) regarding the challenging and winding 5.5-kilometre segment from Barkhekhola to Dalabensi, and JICA shows interest in conducting a field study and potentially undertaking the project. JICA also conducts a feasibility study to construct a tunnel between Khurkot and Chiyabari in Sindhuli, which helps shorten the BP Highway. In anticipation of the upcoming monsoon season and the potential impact on transportation, the Division Road Office in Bhaktapur raises the height of the temporary road built along the flood-damaged areas of the BP Highway.


Restricted to Editorial Use Only.
Commercial use is not permitted without prior authorization.
Please contact us for more information.


Vehicles drive through the diversions along the BP Highway in Kavrepalanchowk District, Nepal, on December 26, 2025, after it is swept away... Editorial
Nepal's BP Highway Resumes Operations After 2024 Floods
26 Dec 2025 · KAVREPALANCHOWK, Nepal
#13130403
Vehicles drive through the diversions along the BP Highway in Kavrepalanchowk District, Nepal, on December 26, 2025, after it is swept away...

#13130403

26 Dec 2025

Vehicles drive through the diversions along the BP Highway in Kavrepalanchowk District, Nepal, on December 26, 2025, after it is swept away by a flash flood in September 2024. The section of the BP Highway between Katunje and Barkhekhola is severely damaged by the flash flood in the Rosi River in September 2024. Three sections are rebuilt under the funding of the government of Nepal, while the Japanese government is requested to support the rebuilding of the fourth section. A total budget assurance of Rs. 8.5 billion is secured from the government for the reconstruction of the highway. Out of this, Rs. 7.5 billion is allocated for the three sections in Kavrepalanchok District and Rs. 1 billion for the Sindhuli section. Discussions are ongoing with the Japan International Cooperation Agency (JICA) regarding the challenging and winding 5.5-kilometre segment from Barkhekhola to Dalabensi, and JICA shows interest in conducting a field study and potentially undertaking the project. JICA also conducts a feasibility study to construct a tunnel between Khurkot and Chiyabari in Sindhuli, which helps shorten the BP Highway. In anticipation of the upcoming monsoon season and the potential impact on transportation, the Division Road Office in Bhaktapur raises the height of the temporary road built along the flood-damaged areas of the BP Highway.


Restricted to Editorial Use Only.
Commercial use is not permitted without prior authorization.
Please contact us for more information.


Former Nepali President Bidya Devi Bhandari (in blue shawl) walks out from the arson-hit Office of the Prime Minister and Council of Ministe... Editorial
Former Nepali President Bidhya Devi Bhandari Visits Torched Government Buildings During Gen-Z Uprising
7 Dec 2025 · KATHMANDU, Nepal
#13068889
Former Nepali President Bidya Devi Bhandari (in blue shawl) walks out from the arson-hit Office of the Prime Minister and Council of Ministe...

#13068889

7 Dec 2025

Former Nepali President Bidya Devi Bhandari (in blue shawl) walks out from the arson-hit Office of the Prime Minister and Council of Ministers building, one of the torched government buildings inside Singha Durbar, the administrative capital of Nepal, during the Gen-Z uprising in Kathmandu, Nepal, on December 7, 2025. The western section of Singha Durbar is completely damaged due to arson during the Gen-Z movement that takes place on September 8 and 9.


Restricted to Editorial Use Only.
Commercial use is not permitted without prior authorization.
Please contact us for more information.


Former Nepali President Bidya Devi Bhandari (in blue shawl) inspects the torched government buildings inside Singha Durbar, the administrati... Editorial
Former Nepali President Bidhya Devi Bhandari Visits Torched Government Buildings During Gen-Z Uprising
7 Dec 2025 · KATHMANDU, Nepal
#13068890
Former Nepali President Bidya Devi Bhandari (in blue shawl) inspects the torched government buildings inside Singha Durbar, the administrati...

#13068890

7 Dec 2025

Former Nepali President Bidya Devi Bhandari (in blue shawl) inspects the torched government buildings inside Singha Durbar, the administrative capital of Nepal, during the Gen-Z uprising in Kathmandu, Nepal, on December 7, 2025. The western section of Singha Durbar is completely damaged due to arson during the Gen-Z movement that takes place on September 8 and 9.


Restricted to Editorial Use Only.
Commercial use is not permitted without prior authorization.
Please contact us for more information.


Former Nepali President Bidya Devi Bhandari (in blue shawl) inspects the torched government buildings inside Singha Durbar, the administrati... Editorial
Former Nepali President Bidhya Devi Bhandari Visits Torched Government Buildings During Gen-Z Uprising
7 Dec 2025 · KATHMANDU, Nepal
#13068891
Former Nepali President Bidya Devi Bhandari (in blue shawl) inspects the torched government buildings inside Singha Durbar, the administrati...

#13068891

7 Dec 2025

Former Nepali President Bidya Devi Bhandari (in blue shawl) inspects the torched government buildings inside Singha Durbar, the administrative capital of Nepal, during the Gen-Z uprising in Kathmandu, Nepal, on December 7, 2025. The western section of Singha Durbar is completely damaged due to arson during the Gen-Z movement that takes place on September 8 and 9.


Restricted to Editorial Use Only.
Commercial use is not permitted without prior authorization.
Please contact us for more information.


Former Nepali President Bidya Devi Bhandari (in blue shawl) inspects the torched government buildings inside Singha Durbar, the administrati... Editorial
Former Nepali President Bidhya Devi Bhandari Visits Torched Government Buildings During Gen-Z Uprising
7 Dec 2025 · KATHMANDU, Nepal
#13068892
Former Nepali President Bidya Devi Bhandari (in blue shawl) inspects the torched government buildings inside Singha Durbar, the administrati...

#13068892

7 Dec 2025

Former Nepali President Bidya Devi Bhandari (in blue shawl) inspects the torched government buildings inside Singha Durbar, the administrative capital of Nepal, during the Gen-Z uprising in Kathmandu, Nepal, on December 7, 2025. The western section of Singha Durbar is completely damaged due to arson during the Gen-Z movement that takes place on September 8 and 9.


Restricted to Editorial Use Only.
Commercial use is not permitted without prior authorization.
Please contact us for more information.


Former Nepali President Bidya Devi Bhandari (in blue shawl) inspects the torched government buildings inside Singha Durbar, the administrati... Editorial
Former Nepali President Bidhya Devi Bhandari Visits Torched Government Buildings During Gen-Z Uprising
7 Dec 2025 · KATHMANDU, Nepal
#13068893
Former Nepali President Bidya Devi Bhandari (in blue shawl) inspects the torched government buildings inside Singha Durbar, the administrati...

#13068893

7 Dec 2025

Former Nepali President Bidya Devi Bhandari (in blue shawl) inspects the torched government buildings inside Singha Durbar, the administrative capital of Nepal, during the Gen-Z uprising in Kathmandu, Nepal, on December 7, 2025. The western section of Singha Durbar is completely damaged due to arson during the Gen-Z movement that takes place on September 8 and 9.


Restricted to Editorial Use Only.
Commercial use is not permitted without prior authorization.
Please contact us for more information.


of 49
Next
Add to Board
Loading boards…
New board
NurPhoto Logo

Independent photojournalistic agency delivering global visual storytelling since 2013. Trusted by leading media organizations worldwide.

Company
  • About Us
  • Work With Us
  • Contact Us
  • Latest Galleries
Services
  • Editorial Pictures
  • Assignments
  • Research Services
  • Fine Art Prints
  • Creative Content
Resources
  • Credit Packs
  • License Terms
  • Terms of Service
  • Privacy Policy
  • Support Center
Connect With Us
[email protected]
24/7 Support
Follow Our Stories

© 2013–2026 NurPhoto S.r.l. All rights reserved. | VAT IT01921690663

We accept:
Click outside this window to close it