Skip to main content
NurPhoto Agency Logo
  • Home
  • Editorial Pictures
    • Unrest, Conflicts and War
    • Arts, Culture and Entertainment
    • Sports

    • All Categories

    • Latest Galleries
  • Reportage
  • News of the Week
  • Videos
  • (0)
  • Login
  • Register

Search Editorial Photos

Enter keywords to search our editorial photo archive
  1. Home
  2. Search
  3. segments

Refine Results

Active Filters:
Sort By
Content Type
Location
People

"segments"

1,661 professional editorial images found

Loading search results...
A top-down aerial drone view shows Nabrzeze Wieleckie with traffic lanes, a bicycle path, a bus stop, and a tram track segment in Szczecin,...

#13221011

Travel Destiantion: Szczecin, Poland

20 January 2026

A top-down aerial drone view shows Nabrzeze Wieleckie with traffic lanes, a bicycle path, a bus stop, and a tram track segment in Szczecin,...

#13221011

20 January 2026

A top-down aerial drone view shows Nabrzeze Wieleckie with traffic lanes, a bicycle path, a bus stop, and a tram track segment in Szczecin, Poland, on January 18, 2026.


Restricted to Editorial Use Only.
Commercial use is not permitted without prior authorization.
Please contact us for more information.


Pedestrians walk past the illuminated glass storefront of the Genesis Studio at Multrees Walk in Edinburgh, Scotland, United Kingdom, on Dec...

#13148154

Genesis Car Studio Showroom At Multrees Walk In Edinburgh

1 January 2026

Pedestrians walk past the illuminated glass storefront of the Genesis Studio at Multrees Walk in Edinburgh, Scotland, United Kingdom, on Dec...

#13148154

1 January 2026

Pedestrians walk past the illuminated glass storefront of the Genesis Studio at Multrees Walk in Edinburgh, Scotland, United Kingdom, on December 19, 2025. The flagship showroom for the South Korean luxury automotive brand features high-end vehicle displays, digital advertising, and prominent winged branding within the city's premier luxury retail district.


Restricted to Editorial Use Only.
Commercial use is not permitted without prior authorization.
Please contact us for more information.


Pedestrians walk past the illuminated glass storefront of the Genesis Studio at Multrees Walk in Edinburgh, Scotland, United Kingdom, on Dec...

#13148157

Genesis Car Studio Showroom At Multrees Walk In Edinburgh

1 January 2026

Pedestrians walk past the illuminated glass storefront of the Genesis Studio at Multrees Walk in Edinburgh, Scotland, United Kingdom, on Dec...

#13148157

1 January 2026

Pedestrians walk past the illuminated glass storefront of the Genesis Studio at Multrees Walk in Edinburgh, Scotland, United Kingdom, on December 19, 2025. The flagship showroom for the South Korean luxury automotive brand features high-end vehicle displays, digital advertising, and prominent winged branding within the city's premier luxury retail district.


Restricted to Editorial Use Only.
Commercial use is not permitted without prior authorization.
Please contact us for more information.


Vehicles drive through the diversions along the BP Highway in Kavrepalanchowk District, Nepal, on December 26, 2025, after it is swept away...

#13130393

Nepal's BP Highway Resumes Operations After 2024 Floods

26 December 2025

Vehicles drive through the diversions along the BP Highway in Kavrepalanchowk District, Nepal, on December 26, 2025, after it is swept away...

#13130393

26 December 2025

Vehicles drive through the diversions along the BP Highway in Kavrepalanchowk District, Nepal, on December 26, 2025, after it is swept away by a flash flood in September 2024. The section of the BP Highway between Katunje and Barkhekhola is severely damaged by the flash flood in the Rosi River in September 2024. Three sections are rebuilt under the funding of the government of Nepal, while the Japanese government is requested to support the rebuilding of the fourth section. A total budget assurance of Rs. 8.5 billion is secured from the government for the reconstruction of the highway. Out of this, Rs. 7.5 billion is allocated for the three sections in Kavrepalanchok District and Rs. 1 billion for the Sindhuli section. Discussions are ongoing with the Japan International Cooperation Agency (JICA) regarding the challenging and winding 5.5-kilometre segment from Barkhekhola to Dalabensi, and JICA shows interest in conducting a field study and potentially undertaking the project. JICA also conducts a feasibility study to construct a tunnel between Khurkot and Chiyabari in Sindhuli, which helps shorten the BP Highway. In anticipation of the upcoming monsoon season and the potential impact on transportation, the Division Road Office in Bhaktapur raises the height of the temporary road built along the flood-damaged areas of the BP Highway.


Restricted to Editorial Use Only.
Commercial use is not permitted without prior authorization.
Please contact us for more information.


Vehicles drive through the diversions along the BP Highway in Kavrepalanchowk District, Nepal, on December 26, 2025, after it is swept away...

#13130394

Nepal's BP Highway Resumes Operations After 2024 Floods

26 December 2025

Vehicles drive through the diversions along the BP Highway in Kavrepalanchowk District, Nepal, on December 26, 2025, after it is swept away...

#13130394

26 December 2025

Vehicles drive through the diversions along the BP Highway in Kavrepalanchowk District, Nepal, on December 26, 2025, after it is swept away by a flash flood in September 2024. The section of the BP Highway between Katunje and Barkhekhola is severely damaged by the flash flood in the Rosi River in September 2024. Three sections are rebuilt under the funding of the government of Nepal, while the Japanese government is requested to support the rebuilding of the fourth section. A total budget assurance of Rs. 8.5 billion is secured from the government for the reconstruction of the highway. Out of this, Rs. 7.5 billion is allocated for the three sections in Kavrepalanchok District and Rs. 1 billion for the Sindhuli section. Discussions are ongoing with the Japan International Cooperation Agency (JICA) regarding the challenging and winding 5.5-kilometre segment from Barkhekhola to Dalabensi, and JICA shows interest in conducting a field study and potentially undertaking the project. JICA also conducts a feasibility study to construct a tunnel between Khurkot and Chiyabari in Sindhuli, which helps shorten the BP Highway. In anticipation of the upcoming monsoon season and the potential impact on transportation, the Division Road Office in Bhaktapur raises the height of the temporary road built along the flood-damaged areas of the BP Highway.


Restricted to Editorial Use Only.
Commercial use is not permitted without prior authorization.
Please contact us for more information.


Vehicles drive through the diversions along the BP Highway in Kavrepalanchowk District, Nepal, on December 26, 2025, after it is swept away...

#13130395

Nepal's BP Highway Resumes Operations After 2024 Floods

26 December 2025

Vehicles drive through the diversions along the BP Highway in Kavrepalanchowk District, Nepal, on December 26, 2025, after it is swept away...

#13130395

26 December 2025

Vehicles drive through the diversions along the BP Highway in Kavrepalanchowk District, Nepal, on December 26, 2025, after it is swept away by a flash flood in September 2024. The section of the BP Highway between Katunje and Barkhekhola is severely damaged by the flash flood in the Rosi River in September 2024. Three sections are rebuilt under the funding of the government of Nepal, while the Japanese government is requested to support the rebuilding of the fourth section. A total budget assurance of Rs. 8.5 billion is secured from the government for the reconstruction of the highway. Out of this, Rs. 7.5 billion is allocated for the three sections in Kavrepalanchok District and Rs. 1 billion for the Sindhuli section. Discussions are ongoing with the Japan International Cooperation Agency (JICA) regarding the challenging and winding 5.5-kilometre segment from Barkhekhola to Dalabensi, and JICA shows interest in conducting a field study and potentially undertaking the project. JICA also conducts a feasibility study to construct a tunnel between Khurkot and Chiyabari in Sindhuli, which helps shorten the BP Highway. In anticipation of the upcoming monsoon season and the potential impact on transportation, the Division Road Office in Bhaktapur raises the height of the temporary road built along the flood-damaged areas of the BP Highway.


Restricted to Editorial Use Only.
Commercial use is not permitted without prior authorization.
Please contact us for more information.


Vehicles drive through the diversions along the BP Highway in Kavrepalanchowk District, Nepal, on December 26, 2025, after it is swept away...

#13130396

Nepal's BP Highway Resumes Operations After 2024 Floods

26 December 2025

Vehicles drive through the diversions along the BP Highway in Kavrepalanchowk District, Nepal, on December 26, 2025, after it is swept away...

#13130396

26 December 2025

Vehicles drive through the diversions along the BP Highway in Kavrepalanchowk District, Nepal, on December 26, 2025, after it is swept away by a flash flood in September 2024. The section of the BP Highway between Katunje and Barkhekhola is severely damaged by the flash flood in the Rosi River in September 2024. Three sections are rebuilt under the funding of the government of Nepal, while the Japanese government is requested to support the rebuilding of the fourth section. A total budget assurance of Rs. 8.5 billion is secured from the government for the reconstruction of the highway. Out of this, Rs. 7.5 billion is allocated for the three sections in Kavrepalanchok District and Rs. 1 billion for the Sindhuli section. Discussions are ongoing with the Japan International Cooperation Agency (JICA) regarding the challenging and winding 5.5-kilometre segment from Barkhekhola to Dalabensi, and JICA shows interest in conducting a field study and potentially undertaking the project. JICA also conducts a feasibility study to construct a tunnel between Khurkot and Chiyabari in Sindhuli, which helps shorten the BP Highway. In anticipation of the upcoming monsoon season and the potential impact on transportation, the Division Road Office in Bhaktapur raises the height of the temporary road built along the flood-damaged areas of the BP Highway.


Restricted to Editorial Use Only.
Commercial use is not permitted without prior authorization.
Please contact us for more information.


Vehicles drive through the diversions along the BP Highway in Kavrepalanchowk District, Nepal, on December 26, 2025, after it is swept away...

#13130397

Nepal's BP Highway Resumes Operations After 2024 Floods

26 December 2025

Vehicles drive through the diversions along the BP Highway in Kavrepalanchowk District, Nepal, on December 26, 2025, after it is swept away...

#13130397

26 December 2025

Vehicles drive through the diversions along the BP Highway in Kavrepalanchowk District, Nepal, on December 26, 2025, after it is swept away by a flash flood in September 2024. The section of the BP Highway between Katunje and Barkhekhola is severely damaged by the flash flood in the Rosi River in September 2024. Three sections are rebuilt under the funding of the government of Nepal, while the Japanese government is requested to support the rebuilding of the fourth section. A total budget assurance of Rs. 8.5 billion is secured from the government for the reconstruction of the highway. Out of this, Rs. 7.5 billion is allocated for the three sections in Kavrepalanchok District and Rs. 1 billion for the Sindhuli section. Discussions are ongoing with the Japan International Cooperation Agency (JICA) regarding the challenging and winding 5.5-kilometre segment from Barkhekhola to Dalabensi, and JICA shows interest in conducting a field study and potentially undertaking the project. JICA also conducts a feasibility study to construct a tunnel between Khurkot and Chiyabari in Sindhuli, which helps shorten the BP Highway. In anticipation of the upcoming monsoon season and the potential impact on transportation, the Division Road Office in Bhaktapur raises the height of the temporary road built along the flood-damaged areas of the BP Highway.


Restricted to Editorial Use Only.
Commercial use is not permitted without prior authorization.
Please contact us for more information.


Vehicles drive through the diversions along the BP Highway in Kavrepalanchowk District, Nepal, on December 26, 2025, after it is swept away...

#13130398

Nepal's BP Highway Resumes Operations After 2024 Floods

26 December 2025

Vehicles drive through the diversions along the BP Highway in Kavrepalanchowk District, Nepal, on December 26, 2025, after it is swept away...

#13130398

26 December 2025

Vehicles drive through the diversions along the BP Highway in Kavrepalanchowk District, Nepal, on December 26, 2025, after it is swept away by a flash flood in September 2024. The section of the BP Highway between Katunje and Barkhekhola is severely damaged by the flash flood in the Rosi River in September 2024. Three sections are rebuilt under the funding of the government of Nepal, while the Japanese government is requested to support the rebuilding of the fourth section. A total budget assurance of Rs. 8.5 billion is secured from the government for the reconstruction of the highway. Out of this, Rs. 7.5 billion is allocated for the three sections in Kavrepalanchok District and Rs. 1 billion for the Sindhuli section. Discussions are ongoing with the Japan International Cooperation Agency (JICA) regarding the challenging and winding 5.5-kilometre segment from Barkhekhola to Dalabensi, and JICA shows interest in conducting a field study and potentially undertaking the project. JICA also conducts a feasibility study to construct a tunnel between Khurkot and Chiyabari in Sindhuli, which helps shorten the BP Highway. In anticipation of the upcoming monsoon season and the potential impact on transportation, the Division Road Office in Bhaktapur raises the height of the temporary road built along the flood-damaged areas of the BP Highway.


Restricted to Editorial Use Only.
Commercial use is not permitted without prior authorization.
Please contact us for more information.


Vehicles drive through the diversions along the BP Highway in Kavrepalanchowk District, Nepal, on December 26, 2025, after it is swept away...

#13130399

Nepal's BP Highway Resumes Operations After 2024 Floods

26 December 2025

Vehicles drive through the diversions along the BP Highway in Kavrepalanchowk District, Nepal, on December 26, 2025, after it is swept away...

#13130399

26 December 2025

Vehicles drive through the diversions along the BP Highway in Kavrepalanchowk District, Nepal, on December 26, 2025, after it is swept away by a flash flood in September 2024. The section of the BP Highway between Katunje and Barkhekhola is severely damaged by the flash flood in the Rosi River in September 2024. Three sections are rebuilt under the funding of the government of Nepal, while the Japanese government is requested to support the rebuilding of the fourth section. A total budget assurance of Rs. 8.5 billion is secured from the government for the reconstruction of the highway. Out of this, Rs. 7.5 billion is allocated for the three sections in Kavrepalanchok District and Rs. 1 billion for the Sindhuli section. Discussions are ongoing with the Japan International Cooperation Agency (JICA) regarding the challenging and winding 5.5-kilometre segment from Barkhekhola to Dalabensi, and JICA shows interest in conducting a field study and potentially undertaking the project. JICA also conducts a feasibility study to construct a tunnel between Khurkot and Chiyabari in Sindhuli, which helps shorten the BP Highway. In anticipation of the upcoming monsoon season and the potential impact on transportation, the Division Road Office in Bhaktapur raises the height of the temporary road built along the flood-damaged areas of the BP Highway.


Restricted to Editorial Use Only.
Commercial use is not permitted without prior authorization.
Please contact us for more information.


Vehicles drive through the diversions along the BP Highway in Kavrepalanchowk District, Nepal, on December 26, 2025, after it is swept away...

#13130401

Nepal's BP Highway Resumes Operations After 2024 Floods

26 December 2025

Vehicles drive through the diversions along the BP Highway in Kavrepalanchowk District, Nepal, on December 26, 2025, after it is swept away...

#13130401

26 December 2025

Vehicles drive through the diversions along the BP Highway in Kavrepalanchowk District, Nepal, on December 26, 2025, after it is swept away by a flash flood in September 2024. The section of the BP Highway between Katunje and Barkhekhola is severely damaged by the flash flood in the Rosi River in September 2024. Three sections are rebuilt under the funding of the government of Nepal, while the Japanese government is requested to support the rebuilding of the fourth section. A total budget assurance of Rs. 8.5 billion is secured from the government for the reconstruction of the highway. Out of this, Rs. 7.5 billion is allocated for the three sections in Kavrepalanchok District and Rs. 1 billion for the Sindhuli section. Discussions are ongoing with the Japan International Cooperation Agency (JICA) regarding the challenging and winding 5.5-kilometre segment from Barkhekhola to Dalabensi, and JICA shows interest in conducting a field study and potentially undertaking the project. JICA also conducts a feasibility study to construct a tunnel between Khurkot and Chiyabari in Sindhuli, which helps shorten the BP Highway. In anticipation of the upcoming monsoon season and the potential impact on transportation, the Division Road Office in Bhaktapur raises the height of the temporary road built along the flood-damaged areas of the BP Highway.


Restricted to Editorial Use Only.
Commercial use is not permitted without prior authorization.
Please contact us for more information.


Vehicles drive through the diversions along the BP Highway in Kavrepalanchowk District, Nepal, on December 26, 2025, after it is swept away...

#13130403

Nepal's BP Highway Resumes Operations After 2024 Floods

26 December 2025

Vehicles drive through the diversions along the BP Highway in Kavrepalanchowk District, Nepal, on December 26, 2025, after it is swept away...

#13130403

26 December 2025

Vehicles drive through the diversions along the BP Highway in Kavrepalanchowk District, Nepal, on December 26, 2025, after it is swept away by a flash flood in September 2024. The section of the BP Highway between Katunje and Barkhekhola is severely damaged by the flash flood in the Rosi River in September 2024. Three sections are rebuilt under the funding of the government of Nepal, while the Japanese government is requested to support the rebuilding of the fourth section. A total budget assurance of Rs. 8.5 billion is secured from the government for the reconstruction of the highway. Out of this, Rs. 7.5 billion is allocated for the three sections in Kavrepalanchok District and Rs. 1 billion for the Sindhuli section. Discussions are ongoing with the Japan International Cooperation Agency (JICA) regarding the challenging and winding 5.5-kilometre segment from Barkhekhola to Dalabensi, and JICA shows interest in conducting a field study and potentially undertaking the project. JICA also conducts a feasibility study to construct a tunnel between Khurkot and Chiyabari in Sindhuli, which helps shorten the BP Highway. In anticipation of the upcoming monsoon season and the potential impact on transportation, the Division Road Office in Bhaktapur raises the height of the temporary road built along the flood-damaged areas of the BP Highway.


Restricted to Editorial Use Only.
Commercial use is not permitted without prior authorization.
Please contact us for more information.


Pre-revolutionary Iranian flags featuring the Lion and Sun (Shir o Khorshid) emblem fly alongside Israeli flags by demonstrators in London,...

#13127838

Pro-monarchy Iranian And Pro-Israel Flags And Signs On Westminster Bridge In London

24 December 2025

Pre-revolutionary Iranian flags featuring the Lion and Sun (Shir o Khorshid) emblem fly alongside Israeli flags by demonstrators in London,...

#13127838

24 December 2025

Pre-revolutionary Iranian flags featuring the Lion and Sun (Shir o Khorshid) emblem fly alongside Israeli flags by demonstrators in London, England, United Kingdom, on December 24, 2025. The joint display represents a growing solidarity between segments of the Iranian diaspora and the state of Israel following military escalations between Israel and the Islamic Republic in mid-2025. Many participants at such gatherings support the ''Cyrus Accords,'' a framework proposed by exiled Crown Prince Reza Pahlavi to establish a new era of regional peace and historical cooperation in a post-Islamic regime Iran.


Restricted to Editorial Use Only.
Commercial use is not permitted without prior authorization.
Please contact us for more information.


Pre-revolutionary Iranian flags featuring the Lion and Sun (Shir o Khorshid) emblem fly alongside Israeli flags by demonstrators in London,...

#13127839

Pro-monarchy Iranian And Pro-Israel Flags And Signs On Westminster Bridge In London

24 December 2025

Pre-revolutionary Iranian flags featuring the Lion and Sun (Shir o Khorshid) emblem fly alongside Israeli flags by demonstrators in London,...

#13127839

24 December 2025

Pre-revolutionary Iranian flags featuring the Lion and Sun (Shir o Khorshid) emblem fly alongside Israeli flags by demonstrators in London, England, United Kingdom, on December 24, 2025. The joint display represents a growing solidarity between segments of the Iranian diaspora and the state of Israel following military escalations between Israel and the Islamic Republic in mid-2025. Many participants at such gatherings support the ''Cyrus Accords,'' a framework proposed by exiled Crown Prince Reza Pahlavi to establish a new era of regional peace and historical cooperation in a post-Islamic regime Iran.


Restricted to Editorial Use Only.
Commercial use is not permitted without prior authorization.
Please contact us for more information.


Pre-revolutionary Iranian flags featuring the Lion and Sun (Shir o Khorshid) emblem fly alongside Israeli flags by demonstrators in London,...

#13127840

Pro-monarchy Iranian And Pro-Israel Flags And Signs On Westminster Bridge In London

24 December 2025

Pre-revolutionary Iranian flags featuring the Lion and Sun (Shir o Khorshid) emblem fly alongside Israeli flags by demonstrators in London,...

#13127840

24 December 2025

Pre-revolutionary Iranian flags featuring the Lion and Sun (Shir o Khorshid) emblem fly alongside Israeli flags by demonstrators in London, England, United Kingdom, on December 24, 2025. The joint display represents a growing solidarity between segments of the Iranian diaspora and the state of Israel following military escalations between Israel and the Islamic Republic in mid-2025. Many participants at such gatherings support the ''Cyrus Accords,'' a framework proposed by exiled Crown Prince Reza Pahlavi to establish a new era of regional peace and historical cooperation in a post-Islamic regime Iran.


Restricted to Editorial Use Only.
Commercial use is not permitted without prior authorization.
Please contact us for more information.


A Nepali farmer plucks sweet oranges from an orchard in Sindhuli, Nepal, on December 9, 2025, to sell them in the market. With the onset of...

#13076728

Farmers In Nepal Go Brisk Plucking Citrus Fruits From Their Orchard After Entering The Peak Season-40

9 December 2025

A Nepali farmer plucks sweet oranges from an orchard in Sindhuli, Nepal, on December 9, 2025, to sell them in the market. With the onset of...

#13076728

9 December 2025

A Nepali farmer plucks sweet oranges from an orchard in Sindhuli, Nepal, on December 9, 2025, to sell them in the market. With the onset of cooler months, Nepal's orchards of oranges and sweet oranges in rural areas such as Sindhuli, a key area for citrus fruits, experience brisk plucking. Known for their juicy segments and vibrant peel, these citrus fruits not only fuel the economy but also provide substantial health benefits. Both oranges, part of the citrus family, are Nepal's most cultivated fruit. Production exceeds 185,000 tons annually and is farmed on nearly 27,892 hectares across 48 districts.


Restricted to Editorial Use Only.
Commercial use is not permitted without prior authorization.
Please contact us for more information.


of 104
Next
NurPhoto Logo

Independent photojournalistic agency delivering global visual storytelling since 2013. Trusted by leading media organizations worldwide.

Company
  • About Us
  • Work With Us
  • Contact Us
  • Reportages
Services
  • Editorial Pictures
  • Assignments
  • Research Services
  • Fine Art Prints
  • Creative Content
Resources
  • License Terms
  • Terms of Service
  • Privacy Policy
  • Support Center
Connect With Us
[email protected]
24/7 Support
Follow Our Stories

© 2013-2026 NurPhoto S.r.l. All rights reserved. | VAT IT01921690663

We accept:
Click outside this window to close it