Skip to main content
NurPhoto Agency Logo
  • Home
  • Editorial Pictures
    • Unrest, Conflicts and War
    • Arts, Culture and Entertainment
    • Sports

    • All Categories

    • Latest Galleries
  • Reportage
  • News of the Week
  • Videos
  • (0)
  • Login
  • Register

Search Editorial Photos

Enter keywords to search our editorial photo archive
  1. Home
  2. Search
  3. pipeline construction

Refine Results

Active Filters:
Sort By
Content Type
Location
People

"pipeline construction"

286 professional editorial images found

Loading search results...
Construction workers are carrying out pipeline hoisting at the construction site of the Zhangye Waste Disposal and Resource Utilization Cent...

#11179383

Environmental Protection Project Construction in Zhangye

26 April 2024

Construction workers are carrying out pipeline hoisting at the construction site of the Zhangye Waste Disposal and Resource Utilization Cent...

#11179383

26 April 2024

Construction workers are carrying out pipeline hoisting at the construction site of the Zhangye Waste Disposal and Resource Utilization Center in Zhangye, China, on April 24, 2024.


Restricted to Editorial Use Only.
Commercial use is not permitted without prior authorization.
Please contact us for more information.


The land construction of the integrated treatment platform for the second phase of the Deep-sea One project is being completed in the West C...

#10954533

Cnooc "Deep Sea One" Completed

1 February 2024

The land construction of the integrated treatment platform for the second phase of the Deep-sea One project is being completed in the West C...

#10954533

1 February 2024

The land construction of the integrated treatment platform for the second phase of the Deep-sea One project is being completed in the West Coast New Area of Qingdao, in Qingdao, Shandong province, China, on February 1, 2024. Reports indicate that the platform is utilizing 7 megawatt gas turbine generator sets and other domestic equipment that possess completely independent intellectual property rights. It is equipped with the largest domestic offshore platform slug flow catcher, designed by CNOOC, to eliminate the risk of liquid level fluctuations and blockages in oil and gas mixed transport pipelines, ensuring the reliable operation of oil and gas treatment equipment. The deep-sea No. 1 ultra-deep water gas field, which started operations in June 2021, has confirmed geological reserves of over 100 billion cubic meters. With a maximum water depth of more than 1,500 meters and a maximum well depth of over 4,000 meters, it is the deepest and most challenging offshore ultra-deep water gas field independently developed by China to date.


Restricted to Editorial Use Only.
Commercial use is not permitted without prior authorization.
Please contact us for more information.


The land construction of the integrated treatment platform for the second phase of the Deep-sea One project is being completed in the West C...

#10954534

Cnooc "Deep Sea One" Completed

1 February 2024

The land construction of the integrated treatment platform for the second phase of the Deep-sea One project is being completed in the West C...

#10954534

1 February 2024

The land construction of the integrated treatment platform for the second phase of the Deep-sea One project is being completed in the West Coast New Area of Qingdao, in Qingdao, Shandong province, China, on February 1, 2024. Reports indicate that the platform is utilizing 7 megawatt gas turbine generator sets and other domestic equipment that possess completely independent intellectual property rights. It is equipped with the largest domestic offshore platform slug flow catcher, designed by CNOOC, to eliminate the risk of liquid level fluctuations and blockages in oil and gas mixed transport pipelines, ensuring the reliable operation of oil and gas treatment equipment. The deep-sea No. 1 ultra-deep water gas field, which started operations in June 2021, has confirmed geological reserves of over 100 billion cubic meters. With a maximum water depth of more than 1,500 meters and a maximum well depth of over 4,000 meters, it is the deepest and most challenging offshore ultra-deep water gas field independently developed by China to date.


Restricted to Editorial Use Only.
Commercial use is not permitted without prior authorization.
Please contact us for more information.


The land construction of the integrated treatment platform for the second phase of the Deep-sea One project is being completed in the West C...

#10954535

Cnooc "Deep Sea One" Completed

1 February 2024

The land construction of the integrated treatment platform for the second phase of the Deep-sea One project is being completed in the West C...

#10954535

1 February 2024

The land construction of the integrated treatment platform for the second phase of the Deep-sea One project is being completed in the West Coast New Area of Qingdao, in Qingdao, Shandong province, China, on February 1, 2024. Reports indicate that the platform is utilizing 7 megawatt gas turbine generator sets and other domestic equipment that possess completely independent intellectual property rights. It is equipped with the largest domestic offshore platform slug flow catcher, designed by CNOOC, to eliminate the risk of liquid level fluctuations and blockages in oil and gas mixed transport pipelines, ensuring the reliable operation of oil and gas treatment equipment. The deep-sea No. 1 ultra-deep water gas field, which started operations in June 2021, has confirmed geological reserves of over 100 billion cubic meters. With a maximum water depth of more than 1,500 meters and a maximum well depth of over 4,000 meters, it is the deepest and most challenging offshore ultra-deep water gas field independently developed by China to date.


Restricted to Editorial Use Only.
Commercial use is not permitted without prior authorization.
Please contact us for more information.


The land construction of the integrated treatment platform for the second phase of the Deep-sea One project is being completed in the West C...

#10954536

Cnooc "Deep Sea One" Completed

1 February 2024

The land construction of the integrated treatment platform for the second phase of the Deep-sea One project is being completed in the West C...

#10954536

1 February 2024

The land construction of the integrated treatment platform for the second phase of the Deep-sea One project is being completed in the West Coast New Area of Qingdao, in Qingdao, Shandong province, China, on February 1, 2024. Reports indicate that the platform is utilizing 7 megawatt gas turbine generator sets and other domestic equipment that possess completely independent intellectual property rights. It is equipped with the largest domestic offshore platform slug flow catcher, designed by CNOOC, to eliminate the risk of liquid level fluctuations and blockages in oil and gas mixed transport pipelines, ensuring the reliable operation of oil and gas treatment equipment. The deep-sea No. 1 ultra-deep water gas field, which started operations in June 2021, has confirmed geological reserves of over 100 billion cubic meters. With a maximum water depth of more than 1,500 meters and a maximum well depth of over 4,000 meters, it is the deepest and most challenging offshore ultra-deep water gas field independently developed by China to date.


Restricted to Editorial Use Only.
Commercial use is not permitted without prior authorization.
Please contact us for more information.


The land construction of the integrated treatment platform for the second phase of the Deep-sea One project is being completed in the West C...

#10954537

Cnooc "Deep Sea One" Completed

1 February 2024

The land construction of the integrated treatment platform for the second phase of the Deep-sea One project is being completed in the West C...

#10954537

1 February 2024

The land construction of the integrated treatment platform for the second phase of the Deep-sea One project is being completed in the West Coast New Area of Qingdao, in Qingdao, Shandong province, China, on February 1, 2024. Reports indicate that the platform is utilizing 7 megawatt gas turbine generator sets and other domestic equipment that possess completely independent intellectual property rights. It is equipped with the largest domestic offshore platform slug flow catcher, designed by CNOOC, to eliminate the risk of liquid level fluctuations and blockages in oil and gas mixed transport pipelines, ensuring the reliable operation of oil and gas treatment equipment. The deep-sea No. 1 ultra-deep water gas field, which started operations in June 2021, has confirmed geological reserves of over 100 billion cubic meters. With a maximum water depth of more than 1,500 meters and a maximum well depth of over 4,000 meters, it is the deepest and most challenging offshore ultra-deep water gas field independently developed by China to date.


Restricted to Editorial Use Only.
Commercial use is not permitted without prior authorization.
Please contact us for more information.


The land construction of the integrated treatment platform for the second phase of the Deep-sea One project is being completed in the West C...

#10954538

Cnooc "Deep Sea One" Completed

1 February 2024

The land construction of the integrated treatment platform for the second phase of the Deep-sea One project is being completed in the West C...

#10954538

1 February 2024

The land construction of the integrated treatment platform for the second phase of the Deep-sea One project is being completed in the West Coast New Area of Qingdao, in Qingdao, Shandong province, China, on February 1, 2024. Reports indicate that the platform is utilizing 7 megawatt gas turbine generator sets and other domestic equipment that possess completely independent intellectual property rights. It is equipped with the largest domestic offshore platform slug flow catcher, designed by CNOOC, to eliminate the risk of liquid level fluctuations and blockages in oil and gas mixed transport pipelines, ensuring the reliable operation of oil and gas treatment equipment. The deep-sea No. 1 ultra-deep water gas field, which started operations in June 2021, has confirmed geological reserves of over 100 billion cubic meters. With a maximum water depth of more than 1,500 meters and a maximum well depth of over 4,000 meters, it is the deepest and most challenging offshore ultra-deep water gas field independently developed by China to date.


Restricted to Editorial Use Only.
Commercial use is not permitted without prior authorization.
Please contact us for more information.


The land construction of the integrated treatment platform for the second phase of the Deep-sea One project is being completed in the West C...

#10954539

Cnooc "Deep Sea One" Completed

1 February 2024

The land construction of the integrated treatment platform for the second phase of the Deep-sea One project is being completed in the West C...

#10954539

1 February 2024

The land construction of the integrated treatment platform for the second phase of the Deep-sea One project is being completed in the West Coast New Area of Qingdao, in Qingdao, Shandong province, China, on February 1, 2024. Reports indicate that the platform is utilizing 7 megawatt gas turbine generator sets and other domestic equipment that possess completely independent intellectual property rights. It is equipped with the largest domestic offshore platform slug flow catcher, designed by CNOOC, to eliminate the risk of liquid level fluctuations and blockages in oil and gas mixed transport pipelines, ensuring the reliable operation of oil and gas treatment equipment. The deep-sea No. 1 ultra-deep water gas field, which started operations in June 2021, has confirmed geological reserves of over 100 billion cubic meters. With a maximum water depth of more than 1,500 meters and a maximum well depth of over 4,000 meters, it is the deepest and most challenging offshore ultra-deep water gas field independently developed by China to date.


Restricted to Editorial Use Only.
Commercial use is not permitted without prior authorization.
Please contact us for more information.


The land construction of the integrated treatment platform for the second phase of the Deep-sea One project is being completed in the West C...

#10954540

Cnooc "Deep Sea One" Completed

1 February 2024

The land construction of the integrated treatment platform for the second phase of the Deep-sea One project is being completed in the West C...

#10954540

1 February 2024

The land construction of the integrated treatment platform for the second phase of the Deep-sea One project is being completed in the West Coast New Area of Qingdao, in Qingdao, Shandong province, China, on February 1, 2024. Reports indicate that the platform is utilizing 7 megawatt gas turbine generator sets and other domestic equipment that possess completely independent intellectual property rights. It is equipped with the largest domestic offshore platform slug flow catcher, designed by CNOOC, to eliminate the risk of liquid level fluctuations and blockages in oil and gas mixed transport pipelines, ensuring the reliable operation of oil and gas treatment equipment. The deep-sea No. 1 ultra-deep water gas field, which started operations in June 2021, has confirmed geological reserves of over 100 billion cubic meters. With a maximum water depth of more than 1,500 meters and a maximum well depth of over 4,000 meters, it is the deepest and most challenging offshore ultra-deep water gas field independently developed by China to date.


Restricted to Editorial Use Only.
Commercial use is not permitted without prior authorization.
Please contact us for more information.


The land construction of the integrated treatment platform for the second phase of the Deep-sea One project is being completed in the West C...

#10954541

Cnooc "Deep Sea One" Completed

1 February 2024

The land construction of the integrated treatment platform for the second phase of the Deep-sea One project is being completed in the West C...

#10954541

1 February 2024

The land construction of the integrated treatment platform for the second phase of the Deep-sea One project is being completed in the West Coast New Area of Qingdao, in Qingdao, Shandong province, China, on February 1, 2024. Reports indicate that the platform is utilizing 7 megawatt gas turbine generator sets and other domestic equipment that possess completely independent intellectual property rights. It is equipped with the largest domestic offshore platform slug flow catcher, designed by CNOOC, to eliminate the risk of liquid level fluctuations and blockages in oil and gas mixed transport pipelines, ensuring the reliable operation of oil and gas treatment equipment. The deep-sea No. 1 ultra-deep water gas field, which started operations in June 2021, has confirmed geological reserves of over 100 billion cubic meters. With a maximum water depth of more than 1,500 meters and a maximum well depth of over 4,000 meters, it is the deepest and most challenging offshore ultra-deep water gas field independently developed by China to date.


Restricted to Editorial Use Only.
Commercial use is not permitted without prior authorization.
Please contact us for more information.


An aerial photo is showing the West Chongqing Water Resources Allocation Project's West Main Line water transmission line and the Sanjiao Wa...

#10835116

Water Resources Allocation Project in West Chongqing Under Construction

7 December 2023

An aerial photo is showing the West Chongqing Water Resources Allocation Project's West Main Line water transmission line and the Sanjiao Wa...

#10835116

7 December 2023

An aerial photo is showing the West Chongqing Water Resources Allocation Project's West Main Line water transmission line and the Sanjiao Water Plant branch pipeline project in Chongqing, China, on December 7, 2023.


Restricted to Editorial Use Only.
Commercial use is not permitted without prior authorization.
Please contact us for more information.


An aerial photo is showing the West Chongqing Water Resources Allocation Project's West Main Line water transmission line and the Sanjiao Wa...

#10835117

Water Resources Allocation Project in West Chongqing Under Construction

7 December 2023

An aerial photo is showing the West Chongqing Water Resources Allocation Project's West Main Line water transmission line and the Sanjiao Wa...

#10835117

7 December 2023

An aerial photo is showing the West Chongqing Water Resources Allocation Project's West Main Line water transmission line and the Sanjiao Water Plant branch pipeline project in Chongqing, China, on December 7, 2023.


Restricted to Editorial Use Only.
Commercial use is not permitted without prior authorization.
Please contact us for more information.


An aerial photo is showing the West Chongqing Water Resources Allocation Project's West Main Line water transmission line and the Sanjiao Wa...

#10835118

Water Resources Allocation Project in West Chongqing Under Construction

7 December 2023

An aerial photo is showing the West Chongqing Water Resources Allocation Project's West Main Line water transmission line and the Sanjiao Wa...

#10835118

7 December 2023

An aerial photo is showing the West Chongqing Water Resources Allocation Project's West Main Line water transmission line and the Sanjiao Water Plant branch pipeline project in Chongqing, China, on December 7, 2023.


Restricted to Editorial Use Only.
Commercial use is not permitted without prior authorization.
Please contact us for more information.


An aerial photo is showing the West Chongqing Water Resources Allocation Project's West Main Line water transmission line and the Sanjiao Wa...

#10835119

Water Resources Allocation Project in West Chongqing Under Construction

7 December 2023

An aerial photo is showing the West Chongqing Water Resources Allocation Project's West Main Line water transmission line and the Sanjiao Wa...

#10835119

7 December 2023

An aerial photo is showing the West Chongqing Water Resources Allocation Project's West Main Line water transmission line and the Sanjiao Water Plant branch pipeline project in Chongqing, China, on December 7, 2023.


Restricted to Editorial Use Only.
Commercial use is not permitted without prior authorization.
Please contact us for more information.


An aerial photo is showing the West Chongqing Water Resources Allocation Project's West Main Line water transmission line and the Sanjiao Wa...

#10835120

Water Resources Allocation Project in West Chongqing Under Construction

7 December 2023

An aerial photo is showing the West Chongqing Water Resources Allocation Project's West Main Line water transmission line and the Sanjiao Wa...

#10835120

7 December 2023

An aerial photo is showing the West Chongqing Water Resources Allocation Project's West Main Line water transmission line and the Sanjiao Water Plant branch pipeline project in Chongqing, China, on December 7, 2023.


Restricted to Editorial Use Only.
Commercial use is not permitted without prior authorization.
Please contact us for more information.


JIAYUGUAN, CHINA - AUGUST 25, 2023 - Aerial photo of the construction site of the fourth line of the West-East natural Gas pipeline project...

#10445226

West-East Natural Gas Pipeline Project in Jiayuguan

2 September 2023

JIAYUGUAN, CHINA - AUGUST 25, 2023 - Aerial photo of the construction site of the fourth line of the West-East natural Gas pipeline project...

#10445226

2 September 2023

JIAYUGUAN, CHINA - AUGUST 25, 2023 - Aerial photo of the construction site of the fourth line of the West-East natural Gas pipeline project in Jiayuguan, Gansu Province, China, Aug. 25, 2023


Restricted to Editorial Use Only.
Commercial use is not permitted without prior authorization.
Please contact us for more information.


Previous
of 18
Next
NurPhoto Logo

Independent photojournalistic agency delivering global visual storytelling since 2013. Trusted by leading media organizations worldwide.

Company
  • About Us
  • Work With Us
  • Contact Us
  • Reportages
Services
  • Editorial Pictures
  • Assignments
  • Research Services
  • Fine Art Prints
  • Creative Content
Resources
  • License Terms
  • Terms of Service
  • Privacy Policy
  • Support Center
Connect With Us
[email protected]
24/7 Support
Follow Our Stories

© 2013-2025 NurPhoto S.r.l. All rights reserved. | VAT IT01921690663

We accept:
Click outside this window to close it