Search Editorial Photos
"Roshi river"
1,316 professional editorial images found
#13130393
26 December 2025
Vehicles drive through the diversions along the BP Highway in Kavrepalanchowk District, Nepal, on December 26, 2025, after it is swept away by a flash flood in September 2024. The section of the BP Highway between Katunje and Barkhekhola is severely damaged by the flash flood in the Rosi River in September 2024. Three sections are rebuilt under the funding of the government of Nepal, while the Japanese government is requested to support the rebuilding of the fourth section. A total budget assurance of Rs. 8.5 billion is secured from the government for the reconstruction of the highway. Out of this, Rs. 7.5 billion is allocated for the three sections in Kavrepalanchok District and Rs. 1 billion for the Sindhuli section. Discussions are ongoing with the Japan International Cooperation Agency (JICA) regarding the challenging and winding 5.5-kilometre segment from Barkhekhola to Dalabensi, and JICA shows interest in conducting a field study and potentially undertaking the project. JICA also conducts a feasibility study to construct a tunnel between Khurkot and Chiyabari in Sindhuli, which helps shorten the BP Highway. In anticipation of the upcoming monsoon season and the potential impact on transportation, the Division Road Office in Bhaktapur raises the height of the temporary road built along the flood-damaged areas of the BP Highway.
Restricted to Editorial Use Only.
Commercial use is not permitted without prior authorization.
Please contact us for more information.
#13130394
26 December 2025
Vehicles drive through the diversions along the BP Highway in Kavrepalanchowk District, Nepal, on December 26, 2025, after it is swept away by a flash flood in September 2024. The section of the BP Highway between Katunje and Barkhekhola is severely damaged by the flash flood in the Rosi River in September 2024. Three sections are rebuilt under the funding of the government of Nepal, while the Japanese government is requested to support the rebuilding of the fourth section. A total budget assurance of Rs. 8.5 billion is secured from the government for the reconstruction of the highway. Out of this, Rs. 7.5 billion is allocated for the three sections in Kavrepalanchok District and Rs. 1 billion for the Sindhuli section. Discussions are ongoing with the Japan International Cooperation Agency (JICA) regarding the challenging and winding 5.5-kilometre segment from Barkhekhola to Dalabensi, and JICA shows interest in conducting a field study and potentially undertaking the project. JICA also conducts a feasibility study to construct a tunnel between Khurkot and Chiyabari in Sindhuli, which helps shorten the BP Highway. In anticipation of the upcoming monsoon season and the potential impact on transportation, the Division Road Office in Bhaktapur raises the height of the temporary road built along the flood-damaged areas of the BP Highway.
Restricted to Editorial Use Only.
Commercial use is not permitted without prior authorization.
Please contact us for more information.
#13130395
26 December 2025
Vehicles drive through the diversions along the BP Highway in Kavrepalanchowk District, Nepal, on December 26, 2025, after it is swept away by a flash flood in September 2024. The section of the BP Highway between Katunje and Barkhekhola is severely damaged by the flash flood in the Rosi River in September 2024. Three sections are rebuilt under the funding of the government of Nepal, while the Japanese government is requested to support the rebuilding of the fourth section. A total budget assurance of Rs. 8.5 billion is secured from the government for the reconstruction of the highway. Out of this, Rs. 7.5 billion is allocated for the three sections in Kavrepalanchok District and Rs. 1 billion for the Sindhuli section. Discussions are ongoing with the Japan International Cooperation Agency (JICA) regarding the challenging and winding 5.5-kilometre segment from Barkhekhola to Dalabensi, and JICA shows interest in conducting a field study and potentially undertaking the project. JICA also conducts a feasibility study to construct a tunnel between Khurkot and Chiyabari in Sindhuli, which helps shorten the BP Highway. In anticipation of the upcoming monsoon season and the potential impact on transportation, the Division Road Office in Bhaktapur raises the height of the temporary road built along the flood-damaged areas of the BP Highway.
Restricted to Editorial Use Only.
Commercial use is not permitted without prior authorization.
Please contact us for more information.
#13130396
26 December 2025
Vehicles drive through the diversions along the BP Highway in Kavrepalanchowk District, Nepal, on December 26, 2025, after it is swept away by a flash flood in September 2024. The section of the BP Highway between Katunje and Barkhekhola is severely damaged by the flash flood in the Rosi River in September 2024. Three sections are rebuilt under the funding of the government of Nepal, while the Japanese government is requested to support the rebuilding of the fourth section. A total budget assurance of Rs. 8.5 billion is secured from the government for the reconstruction of the highway. Out of this, Rs. 7.5 billion is allocated for the three sections in Kavrepalanchok District and Rs. 1 billion for the Sindhuli section. Discussions are ongoing with the Japan International Cooperation Agency (JICA) regarding the challenging and winding 5.5-kilometre segment from Barkhekhola to Dalabensi, and JICA shows interest in conducting a field study and potentially undertaking the project. JICA also conducts a feasibility study to construct a tunnel between Khurkot and Chiyabari in Sindhuli, which helps shorten the BP Highway. In anticipation of the upcoming monsoon season and the potential impact on transportation, the Division Road Office in Bhaktapur raises the height of the temporary road built along the flood-damaged areas of the BP Highway.
Restricted to Editorial Use Only.
Commercial use is not permitted without prior authorization.
Please contact us for more information.
#13130397
26 December 2025
Vehicles drive through the diversions along the BP Highway in Kavrepalanchowk District, Nepal, on December 26, 2025, after it is swept away by a flash flood in September 2024. The section of the BP Highway between Katunje and Barkhekhola is severely damaged by the flash flood in the Rosi River in September 2024. Three sections are rebuilt under the funding of the government of Nepal, while the Japanese government is requested to support the rebuilding of the fourth section. A total budget assurance of Rs. 8.5 billion is secured from the government for the reconstruction of the highway. Out of this, Rs. 7.5 billion is allocated for the three sections in Kavrepalanchok District and Rs. 1 billion for the Sindhuli section. Discussions are ongoing with the Japan International Cooperation Agency (JICA) regarding the challenging and winding 5.5-kilometre segment from Barkhekhola to Dalabensi, and JICA shows interest in conducting a field study and potentially undertaking the project. JICA also conducts a feasibility study to construct a tunnel between Khurkot and Chiyabari in Sindhuli, which helps shorten the BP Highway. In anticipation of the upcoming monsoon season and the potential impact on transportation, the Division Road Office in Bhaktapur raises the height of the temporary road built along the flood-damaged areas of the BP Highway.
Restricted to Editorial Use Only.
Commercial use is not permitted without prior authorization.
Please contact us for more information.
#13130398
26 December 2025
Vehicles drive through the diversions along the BP Highway in Kavrepalanchowk District, Nepal, on December 26, 2025, after it is swept away by a flash flood in September 2024. The section of the BP Highway between Katunje and Barkhekhola is severely damaged by the flash flood in the Rosi River in September 2024. Three sections are rebuilt under the funding of the government of Nepal, while the Japanese government is requested to support the rebuilding of the fourth section. A total budget assurance of Rs. 8.5 billion is secured from the government for the reconstruction of the highway. Out of this, Rs. 7.5 billion is allocated for the three sections in Kavrepalanchok District and Rs. 1 billion for the Sindhuli section. Discussions are ongoing with the Japan International Cooperation Agency (JICA) regarding the challenging and winding 5.5-kilometre segment from Barkhekhola to Dalabensi, and JICA shows interest in conducting a field study and potentially undertaking the project. JICA also conducts a feasibility study to construct a tunnel between Khurkot and Chiyabari in Sindhuli, which helps shorten the BP Highway. In anticipation of the upcoming monsoon season and the potential impact on transportation, the Division Road Office in Bhaktapur raises the height of the temporary road built along the flood-damaged areas of the BP Highway.
Restricted to Editorial Use Only.
Commercial use is not permitted without prior authorization.
Please contact us for more information.
#13130399
26 December 2025
Vehicles drive through the diversions along the BP Highway in Kavrepalanchowk District, Nepal, on December 26, 2025, after it is swept away by a flash flood in September 2024. The section of the BP Highway between Katunje and Barkhekhola is severely damaged by the flash flood in the Rosi River in September 2024. Three sections are rebuilt under the funding of the government of Nepal, while the Japanese government is requested to support the rebuilding of the fourth section. A total budget assurance of Rs. 8.5 billion is secured from the government for the reconstruction of the highway. Out of this, Rs. 7.5 billion is allocated for the three sections in Kavrepalanchok District and Rs. 1 billion for the Sindhuli section. Discussions are ongoing with the Japan International Cooperation Agency (JICA) regarding the challenging and winding 5.5-kilometre segment from Barkhekhola to Dalabensi, and JICA shows interest in conducting a field study and potentially undertaking the project. JICA also conducts a feasibility study to construct a tunnel between Khurkot and Chiyabari in Sindhuli, which helps shorten the BP Highway. In anticipation of the upcoming monsoon season and the potential impact on transportation, the Division Road Office in Bhaktapur raises the height of the temporary road built along the flood-damaged areas of the BP Highway.
Restricted to Editorial Use Only.
Commercial use is not permitted without prior authorization.
Please contact us for more information.
#13130401
26 December 2025
Vehicles drive through the diversions along the BP Highway in Kavrepalanchowk District, Nepal, on December 26, 2025, after it is swept away by a flash flood in September 2024. The section of the BP Highway between Katunje and Barkhekhola is severely damaged by the flash flood in the Rosi River in September 2024. Three sections are rebuilt under the funding of the government of Nepal, while the Japanese government is requested to support the rebuilding of the fourth section. A total budget assurance of Rs. 8.5 billion is secured from the government for the reconstruction of the highway. Out of this, Rs. 7.5 billion is allocated for the three sections in Kavrepalanchok District and Rs. 1 billion for the Sindhuli section. Discussions are ongoing with the Japan International Cooperation Agency (JICA) regarding the challenging and winding 5.5-kilometre segment from Barkhekhola to Dalabensi, and JICA shows interest in conducting a field study and potentially undertaking the project. JICA also conducts a feasibility study to construct a tunnel between Khurkot and Chiyabari in Sindhuli, which helps shorten the BP Highway. In anticipation of the upcoming monsoon season and the potential impact on transportation, the Division Road Office in Bhaktapur raises the height of the temporary road built along the flood-damaged areas of the BP Highway.
Restricted to Editorial Use Only.
Commercial use is not permitted without prior authorization.
Please contact us for more information.
#13130403
26 December 2025
Vehicles drive through the diversions along the BP Highway in Kavrepalanchowk District, Nepal, on December 26, 2025, after it is swept away by a flash flood in September 2024. The section of the BP Highway between Katunje and Barkhekhola is severely damaged by the flash flood in the Rosi River in September 2024. Three sections are rebuilt under the funding of the government of Nepal, while the Japanese government is requested to support the rebuilding of the fourth section. A total budget assurance of Rs. 8.5 billion is secured from the government for the reconstruction of the highway. Out of this, Rs. 7.5 billion is allocated for the three sections in Kavrepalanchok District and Rs. 1 billion for the Sindhuli section. Discussions are ongoing with the Japan International Cooperation Agency (JICA) regarding the challenging and winding 5.5-kilometre segment from Barkhekhola to Dalabensi, and JICA shows interest in conducting a field study and potentially undertaking the project. JICA also conducts a feasibility study to construct a tunnel between Khurkot and Chiyabari in Sindhuli, which helps shorten the BP Highway. In anticipation of the upcoming monsoon season and the potential impact on transportation, the Division Road Office in Bhaktapur raises the height of the temporary road built along the flood-damaged areas of the BP Highway.
Restricted to Editorial Use Only.
Commercial use is not permitted without prior authorization.
Please contact us for more information.
Perilous Condition Of Nepal Highway Continues One Week After Heavy Downpour In 2025
9 October 2025
#12845145
9 October 2025
Heavy load construction vehicles make a diversion in the Roshi River along the BP Highway in Kavrepalanchowk district of Nepal on October 9, 2025. Various sections of the BP Highway, built with Japanese assistance, are swept by the floods of 2024, and within weeks since the disaster, diversions are set up to bring it back into operation. The local authorities, in coordination with the central government, are again setting up diversions, but people are forced to cling to the rocks to get across the road section and catch a bus to continue their journey. One week since the heavy rain batters the Himalayan nation, at least nine major highways connecting various parts of the country remain completely obstructed, as per the latest update from Nepal Police. As a result, many who leave Kathmandu Valley for their village homes for the Dashain festival face difficulties in returning to their workplace and temporary residence.
Restricted to Editorial Use Only.
Commercial use is not permitted without prior authorization.
Please contact us for more information.
Perilous Condition Of Nepal Highway Continues One Week After Heavy Downpour In 2025
9 October 2025
#12845158
9 October 2025
A heavy load construction vehicle makes a diversion in the Roshi River along the BP Highway in Kavrepalanchowk district of Nepal on October 9, 2025. Various sections of the BP Highway, built with Japanese assistance, are swept by the floods of 2024, which are brought back to operation within weeks by setting up diversions. The local authorities, in coordination with the central government, are again setting up diversions, but people are forced to cling to the rocks to get across the road section and catch a bus to continue their journey. One week since the heavy rain batters the Himalayan nation, at least nine major highways connecting various parts of the country remain completely obstructed, according to the latest update from Nepal Police. As a result, many who leave Kathmandu Valley for their village homes for the Dashain festival face difficulties in returning to their workplace and temporary residence.
Restricted to Editorial Use Only.
Commercial use is not permitted without prior authorization.
Please contact us for more information.
Perilous Condition Of Nepal Highway Continues One Week After Heavy Downpour In 2025
9 October 2025
#12845169
9 October 2025
A heavy load construction vehicle makes a diversion in the Roshi River along the BP Highway in Kavrepalanchowk district of Nepal on October 9, 2025. Various sections of the BP Highway, built with Japanese assistance, are swept by the floods of 2024, which are brought back to operation within weeks by setting up diversions. The local authorities, in coordination with the central government, are again setting up diversions, but people are forced to cling to the rocks to get across the road section and catch a bus to continue their journey. One week since the heavy rain batters the Himalayan nation, at least nine major highways connecting various parts of the country remain completely obstructed, according to the latest update from Nepal Police. As a result, many who leave Kathmandu Valley for their village homes for the Dashain festival face difficulties in returning to their workplace and temporary residence.
Restricted to Editorial Use Only.
Commercial use is not permitted without prior authorization.
Please contact us for more information.
Perilous Condition Of Nepal Highway Continues One Week After Heavy Downpour In 2025
9 October 2025
#12845173
9 October 2025
A heavy load construction vehicle makes a diversion in the Roshi River along the BP Highway in Kavrepalanchowk district of Nepal on October 9, 2025. Various sections of the BP Highway, built with Japanese assistance, are swept by the floods of 2024, which are brought back to operation within weeks by setting up diversions. The local authorities, in coordination with the central government, are again setting up diversions, but people are forced to cling to the rocks to get across the road section and catch a bus to continue their journey. One week since the heavy rain batters the Himalayan nation, at least nine major highways connecting various parts of the country remain completely obstructed, according to the latest update from Nepal Police. As a result, many who leave Kathmandu Valley for their village homes for the Dashain festival face difficulties in returning to their workplace and temporary residence.
Restricted to Editorial Use Only.
Commercial use is not permitted without prior authorization.
Please contact us for more information.
Perilous Condition Of Nepal Highway Continues One Week After Heavy Downpour In 2025
9 October 2025
#12845175
9 October 2025
Heavy load construction vehicles make a diversion in the Roshi River along the BP Highway in Kavrepalanchowk district of Nepal on October 9, 2025. Various sections of the BP Highway, built with Japanese assistance, are swept by the floods of 2024, and within weeks since the disaster, diversions are set up to bring it back into operation. The local authorities, in coordination with the central government, are again setting up diversions, but people are forced to cling to the rocks to get across the road section and catch a bus to continue their journey. One week since the heavy rain batters the Himalayan nation, at least nine major highways connecting various parts of the country remain completely obstructed, as per the latest update from Nepal Police. As a result, many who leave Kathmandu Valley for their village homes for the Dashain festival face difficulties in returning to their workplace and temporary residence.
Restricted to Editorial Use Only.
Commercial use is not permitted without prior authorization.
Please contact us for more information.
#12754696
14 September 2025
Valentino Rossi, former Italian MotoGP pilot and chairman of the Pertamina Enduro VR46 Racing Team, attends the Gran Prix Race of the Red Bull Grand Prix of San Marino and the Rimini Riviera at Marco Simoncelli International Circuit in Misano Adriatico, Italy, on September 14, 2025.
Restricted to Editorial Use Only.
Commercial use is not permitted without prior authorization.
Please contact us for more information.
#12754699
14 September 2025
Valentino Rossi, former Italian MotoGP pilot and chairman of the Pertamina Enduro VR46 Racing Team, attends the Gran Prix Race of the Red Bull Grand Prix of San Marino and the Rimini Riviera at Marco Simoncelli International Circuit in Misano Adriatico, Italy, on September 14, 2025.
Restricted to Editorial Use Only.
Commercial use is not permitted without prior authorization.
Please contact us for more information.