Skip to main content
NurPhoto Agency Logo
  • Home
  • Editorial Pictures
    • Unrest, Conflicts and War
    • Arts, Culture and Entertainment
    • Sports

    • All Categories

    • Latest Galleries
  • Reportage
  • News of the Week
  • Videos
  • (0)
  • Login
  • Register

Search Editorial Photos

Enter keywords to search our editorial photo archive
  1. Home
  2. Search
  3. connected technology.

Refine Results

Active Filters:
Sort By
Content Type
Location
People

"connected technology."

2,397 professional editorial images found

Loading search results...
An aerial view shows the 50 MW/100 MWh grid-side energy storage project in Jiangning Development Zone, which is put into operation and conne...

#13141306

Grid Side Energy Storage Project

30 December 2025

An aerial view shows the 50 MW/100 MWh grid-side energy storage project in Jiangning Development Zone, which is put into operation and conne...

#13141306

30 December 2025

An aerial view shows the 50 MW/100 MWh grid-side energy storage project in Jiangning Development Zone, which is put into operation and connected to the grid in Nanjing, Jiangsu Province, China, on December 29, 2025. The energy storage power station adopts a lithium iron phosphate battery system.


Restricted to Editorial Use Only.
Commercial use is not permitted without prior authorization.
Please contact us for more information.


An aerial view shows the 50 MW/100 MWh grid-side energy storage project in Jiangning Development Zone, which is put into operation and conne...

#13141307

Grid Side Energy Storage Project

30 December 2025

An aerial view shows the 50 MW/100 MWh grid-side energy storage project in Jiangning Development Zone, which is put into operation and conne...

#13141307

30 December 2025

An aerial view shows the 50 MW/100 MWh grid-side energy storage project in Jiangning Development Zone, which is put into operation and connected to the grid in Nanjing, Jiangsu Province, China, on December 29, 2025. The energy storage power station adopts a lithium iron phosphate battery system.


Restricted to Editorial Use Only.
Commercial use is not permitted without prior authorization.
Please contact us for more information.


An aerial view shows the 50 MW/100 MWh grid-side energy storage project in Jiangning Development Zone, which is put into operation and conne...

#13141308

Grid Side Energy Storage Project

30 December 2025

An aerial view shows the 50 MW/100 MWh grid-side energy storage project in Jiangning Development Zone, which is put into operation and conne...

#13141308

30 December 2025

An aerial view shows the 50 MW/100 MWh grid-side energy storage project in Jiangning Development Zone, which is put into operation and connected to the grid in Nanjing, Jiangsu Province, China, on December 29, 2025. The energy storage power station adopts a lithium iron phosphate battery system.


Restricted to Editorial Use Only.
Commercial use is not permitted without prior authorization.
Please contact us for more information.


An aerial view shows the 50 MW/100 MWh grid-side energy storage project in Jiangning Development Zone, which is put into operation and conne...

#13141309

Grid Side Energy Storage Project

30 December 2025

An aerial view shows the 50 MW/100 MWh grid-side energy storage project in Jiangning Development Zone, which is put into operation and conne...

#13141309

30 December 2025

An aerial view shows the 50 MW/100 MWh grid-side energy storage project in Jiangning Development Zone, which is put into operation and connected to the grid in Nanjing, Jiangsu Province, China, on December 29, 2025. The energy storage power station adopts a lithium iron phosphate battery system.


Restricted to Editorial Use Only.
Commercial use is not permitted without prior authorization.
Please contact us for more information.


An aerial view shows the 50 MW/100 MWh grid-side energy storage project in Jiangning Development Zone, which is put into operation and conne...

#13141310

Grid Side Energy Storage Project

30 December 2025

An aerial view shows the 50 MW/100 MWh grid-side energy storage project in Jiangning Development Zone, which is put into operation and conne...

#13141310

30 December 2025

An aerial view shows the 50 MW/100 MWh grid-side energy storage project in Jiangning Development Zone, which is put into operation and connected to the grid in Nanjing, Jiangsu Province, China, on December 29, 2025. The energy storage power station adopts a lithium iron phosphate battery system.


Restricted to Editorial Use Only.
Commercial use is not permitted without prior authorization.
Please contact us for more information.


An aerial view shows the 50 MW/100 MWh grid-side energy storage project in Jiangning Development Zone, which is put into operation and conne...

#13141311

Grid Side Energy Storage Project

30 December 2025

An aerial view shows the 50 MW/100 MWh grid-side energy storage project in Jiangning Development Zone, which is put into operation and conne...

#13141311

30 December 2025

An aerial view shows the 50 MW/100 MWh grid-side energy storage project in Jiangning Development Zone, which is put into operation and connected to the grid in Nanjing, Jiangsu Province, China, on December 29, 2025. The energy storage power station adopts a lithium iron phosphate battery system.


Restricted to Editorial Use Only.
Commercial use is not permitted without prior authorization.
Please contact us for more information.


The illuminated Samsung corporate logo is displayed at the entrance of Samsung King's Cross (KX) in London, England, United Kingdom, on Dece...

#13138671

Samsung King's Cross Brand Showcase At Coal Drops Yard In London

29 December 2025

The illuminated Samsung corporate logo is displayed at the entrance of Samsung King's Cross (KX) in London, England, United Kingdom, on Dece...

#13138671

29 December 2025

The illuminated Samsung corporate logo is displayed at the entrance of Samsung King's Cross (KX) in London, England, United Kingdom, on December 26, 2025. This space is integrated into the historic Victorian brick arches of Coal Drops Yard.


Restricted to Editorial Use Only.
Commercial use is not permitted without prior authorization.
Please contact us for more information.


The illuminated Samsung corporate logo is displayed at the entrance of Samsung King's Cross (KX) in London, England, United Kingdom, on Dece...

#13138672

Samsung King's Cross Brand Showcase At Coal Drops Yard In London

29 December 2025

The illuminated Samsung corporate logo is displayed at the entrance of Samsung King's Cross (KX) in London, England, United Kingdom, on Dece...

#13138672

29 December 2025

The illuminated Samsung corporate logo is displayed at the entrance of Samsung King's Cross (KX) in London, England, United Kingdom, on December 26, 2025. This space is integrated into the historic Victorian brick arches of Coal Drops Yard.


Restricted to Editorial Use Only.
Commercial use is not permitted without prior authorization.
Please contact us for more information.


The illuminated Samsung corporate logo is displayed at the entrance of Samsung King's Cross (KX) in London, England, United Kingdom, on Dece...

#13138673

Samsung King's Cross Brand Showcase At Coal Drops Yard In London

29 December 2025

The illuminated Samsung corporate logo is displayed at the entrance of Samsung King's Cross (KX) in London, England, United Kingdom, on Dece...

#13138673

29 December 2025

The illuminated Samsung corporate logo is displayed at the entrance of Samsung King's Cross (KX) in London, England, United Kingdom, on December 26, 2025. This space is integrated into the historic Victorian brick arches of Coal Drops Yard.


Restricted to Editorial Use Only.
Commercial use is not permitted without prior authorization.
Please contact us for more information.


The 450,000 kW integrated solar thermal storage project of Shenneng Yuli County connects to the grid for power generation in Bayingolin Mong...

#13130180

Integrated Solar Thermal Storage Project

26 December 2025

The 450,000 kW integrated solar thermal storage project of Shenneng Yuli County connects to the grid for power generation in Bayingolin Mong...

#13130180

26 December 2025

The 450,000 kW integrated solar thermal storage project of Shenneng Yuli County connects to the grid for power generation in Bayingolin Mongolian Autonomous Prefecture, Xinjiang, China, on December 25, 2025.


Restricted to Editorial Use Only.
Commercial use is not permitted without prior authorization.
Please contact us for more information.


The 450,000 kW integrated solar thermal storage project of Shenneng Yuli County connects to the grid for power generation in Bayingolin Mong...

#13130183

Integrated Solar Thermal Storage Project

26 December 2025

The 450,000 kW integrated solar thermal storage project of Shenneng Yuli County connects to the grid for power generation in Bayingolin Mong...

#13130183

26 December 2025

The 450,000 kW integrated solar thermal storage project of Shenneng Yuli County connects to the grid for power generation in Bayingolin Mongolian Autonomous Prefecture, Xinjiang, China, on December 24, 2025.


Restricted to Editorial Use Only.
Commercial use is not permitted without prior authorization.
Please contact us for more information.


The 450,000 kW integrated solar thermal storage project of Shenneng Yuli County connects to the grid for power generation in Bayingolin Mong...

#13130185

Integrated Solar Thermal Storage Project

26 December 2025

The 450,000 kW integrated solar thermal storage project of Shenneng Yuli County connects to the grid for power generation in Bayingolin Mong...

#13130185

26 December 2025

The 450,000 kW integrated solar thermal storage project of Shenneng Yuli County connects to the grid for power generation in Bayingolin Mongolian Autonomous Prefecture, Xinjiang, China, on December 24, 2025.


Restricted to Editorial Use Only.
Commercial use is not permitted without prior authorization.
Please contact us for more information.


The 450,000 kW integrated solar thermal storage project of Shenneng Yuli County connects to the grid for power generation in Bayingolin Mong...

#13130186

Integrated Solar Thermal Storage Project

26 December 2025

The 450,000 kW integrated solar thermal storage project of Shenneng Yuli County connects to the grid for power generation in Bayingolin Mong...

#13130186

26 December 2025

The 450,000 kW integrated solar thermal storage project of Shenneng Yuli County connects to the grid for power generation in Bayingolin Mongolian Autonomous Prefecture, Xinjiang, China, on December 24, 2025.


Restricted to Editorial Use Only.
Commercial use is not permitted without prior authorization.
Please contact us for more information.


The 450,000 kW integrated solar thermal storage project of Shenneng Yuli County connects to the grid for power generation in Bayingolin Mong...

#13130187

Integrated Solar Thermal Storage Project

26 December 2025

The 450,000 kW integrated solar thermal storage project of Shenneng Yuli County connects to the grid for power generation in Bayingolin Mong...

#13130187

26 December 2025

The 450,000 kW integrated solar thermal storage project of Shenneng Yuli County connects to the grid for power generation in Bayingolin Mongolian Autonomous Prefecture, Xinjiang, China, on December 24, 2025.


Restricted to Editorial Use Only.
Commercial use is not permitted without prior authorization.
Please contact us for more information.


The 450,000 kW integrated solar thermal storage project of Shenneng Yuli County connects to the grid for power generation in Bayingolin Mong...

#13130189

Integrated Solar Thermal Storage Project

26 December 2025

The 450,000 kW integrated solar thermal storage project of Shenneng Yuli County connects to the grid for power generation in Bayingolin Mong...

#13130189

26 December 2025

The 450,000 kW integrated solar thermal storage project of Shenneng Yuli County connects to the grid for power generation in Bayingolin Mongolian Autonomous Prefecture, Xinjiang, China, on December 24, 2025.


Restricted to Editorial Use Only.
Commercial use is not permitted without prior authorization.
Please contact us for more information.


A Samsung official demonstrates the Galaxy Z TriFold's screen-mirroring capabilities with a connected monitor while briefing reporters at Sa...

#13049033

Samsung Unveils Galaxy Z TriFold At Gangnam Media Event

2 December 2025

A Samsung official demonstrates the Galaxy Z TriFold's screen-mirroring capabilities with a connected monitor while briefing reporters at Sa...

#13049033

2 December 2025

A Samsung official demonstrates the Galaxy Z TriFold's screen-mirroring capabilities with a connected monitor while briefing reporters at Samsung Gangnam in Seoul, South Korea, on December 2, 2025. The device officially launches on December 12 in South Korea and rolls out to global markets including China, Taiwan, Singapore, the United Arab Emirates, and the United States. It is sold through Samsung.com and 20 retail locations nationwide with 16GB of memory, 512GB of storage, and a single ''Crafted Black'' color option, priced at 3,590,400 won.


Restricted to Editorial Use Only.
Commercial use is not permitted without prior authorization.
Please contact us for more information.


of 150
Next
NurPhoto Logo

Independent photojournalistic agency delivering global visual storytelling since 2013. Trusted by leading media organizations worldwide.

Company
  • About Us
  • Work With Us
  • Contact Us
  • Reportages
Services
  • Editorial Pictures
  • Assignments
  • Research Services
  • Fine Art Prints
  • Creative Content
Resources
  • License Terms
  • Terms of Service
  • Privacy Policy
  • Support Center
Connect With Us
[email protected]
24/7 Support
Follow Our Stories

© 2013-2025 NurPhoto S.r.l. All rights reserved. | VAT IT01921690663

We accept:
Click outside this window to close it