Search Editorial Photos
"e-reading"
363 professional editorial images found
#13271490
3 February 2026
A Kashmiri Shiite Muslim man reads the holy Koran over his relative's grave to mark Shab-e-Barat, or the night of forgiveness, at a graveyard in Srinagar, Jammu and Kashmir, on February 3, 2026.
Restricted to Editorial Use Only.
Commercial use is not permitted without prior authorization.
Please contact us for more information.
#13271497
3 February 2026
A Kashmiri Shiite Muslim man reads the holy Koran over his relative's grave to mark Shab-e-Barat, or the night of forgiveness, at a graveyard in Srinagar, Jammu and Kashmir, on February 3, 2026.
Restricted to Editorial Use Only.
Commercial use is not permitted without prior authorization.
Please contact us for more information.
#13188714
13 January 2026
A narrow corner building with a large painted slogan reading ''Vestir bem e barato so aqui'' (''Dress well and cheaply only here'') is seen near Sao Bento railway station in Porto, Portugal, on November 12, 2023.
Restricted to Editorial Use Only.
Commercial use is not permitted without prior authorization.
Please contact us for more information.
#13156262
4 January 2026
On June 16, 2016, the U.S. Navy nuclear-powered aircraft carrier USS Dwight D. Eisenhower (CVN-69) operates in the Mediterranean Sea during its operational deployment with the Eisenhower Carrier Strike Group. The vessel operates within the U.S. Sixth Fleet area of responsibility, headquartered in Naples, as part of naval presence and cooperation activities with allied forces.
Restricted to Editorial Use Only.
Commercial use is not permitted without prior authorization.
Please contact us for more information.
#13156282
4 January 2026
On June 16, 2016, the U.S. Navy nuclear-powered aircraft carrier USS Dwight D. Eisenhower (CVN-69) operates in the Mediterranean Sea during its operational deployment with the Eisenhower Carrier Strike Group. The vessel operates within the U.S. Sixth Fleet area of responsibility, headquartered in Naples, as part of naval presence and cooperation activities with allied forces.
Restricted to Editorial Use Only.
Commercial use is not permitted without prior authorization.
Please contact us for more information.
First Hearing At The Administrative Court On The Content On The Legality Of The Planned LGV Highspeed Train Bordeaux-Toulouse
15 December 2025
#13099403
15 December 2025
A protester holds a placard reading '7kms of LGV have the same cost as a hospital, we have other urgencies'. Several associations such as 'Amis de la Terre' (i.e., 'Friends of Earth'), Stop-LGV 47, Stop-LGV 33, and LGV-No Thanks call for a gathering in front of the main railway station of Toulouse, the Matabiau train station, just before a hearing at the Administrative Court of Toulouse to contest the legality of environmental authorizations of the planned high-speed train between Bordeaux and Toulouse. The CNPN (National Council for the Protection of Nature) says the SNCF file to build this high-speed railway is inadequate, false, and incomplete. The Environmental Authority also says there is no research on alternatives for the LGV, and it is a legal duty. Moreover, the projected price tag is initially estimated at EUR10bn for 200 km, then EUR14bn (in 2021), and now, the costs are estimated to exceed EUR20bn. The EU does not provide any funding. However, there are already two train lines between Bordeaux and Toulouse. The works and the line use more than 6,300 ha of good soils, of which 3,000 ha are forests and 370 ha are wetlands in Toulouse, France, on December 15, 2025.
Restricted to Editorial Use Only.
Commercial use is not permitted without prior authorization.
Please contact us for more information.
First Hearing At The Administrative Court On The Content On The Legality Of The Planned LGV Highspeed Train Bordeaux-Toulouse
15 December 2025
#13099407
15 December 2025
A protester speaks into a microphone while a man holds a placard reading 'AFSB' (i.e., South Bordeaux railways arrangements). Several associations, such as 'Amis de la Terre' (i.e., 'Friends of Earth'), Stop-LGV 47, Stop-LGV 33, and LGV-No Thanks, call for a gathering in front of the main railway station of Toulouse, the Matabiau train station, just before a hearing at the Administrative Court of Toulouse to contest the legality of environmental authorizations for the planned high-speed train between Bordeaux and Toulouse. The CNPN (National Council for the Protection of Nature) says the SNCF file to build this high-speed railway is inadequate, false, and incomplete. The Environmental Authority also says there is no research on alternatives for the LGV, which is a legal duty. Moreover, the projected price tag was initially estimated at EUR10bn for 200 km, then EUR14bn in 2021, and now the costs are estimated to exceed EUR20bn. The EU will not provide any funding. However, there are already two train lines between Bordeaux and Toulouse. The works and the line will use more than 6,300 ha of good soils, including 3,000 ha of forests and 370 ha of wetlands. This takes place in Toulouse, France, on December 15, 2025.
Restricted to Editorial Use Only.
Commercial use is not permitted without prior authorization.
Please contact us for more information.
First Hearing At The Administrative Court On The Content On The Legality Of The Planned LGV Highspeed Train Bordeaux-Toulouse
15 December 2025
#13099413
15 December 2025
People hold placards reading 'LGV' and 'Territories in danger'. Several associations, such as 'Amis de la Terre' (i.e., 'Friends of Earth'), Stop-LGV 47, Stop-LGV 33, and LGV-No Thanks, call for a gathering in front of the main railway station of Toulouse, the Matabiau train station, just before a hearing at the Administrative Court of Toulouse to contest the legality of environmental authorizations for the planned high-speed train between Bordeaux and Toulouse. The CNPN (National Council for the Protection of Nature) says the SNCF file to build this high-speed railway is inadequate, false, and incomplete. The Environmental Authority also says there is no research on alternatives for the LGV, which is a legal duty. Moreover, the projected price tag was initially estimated at EUR10 billion for 200 km, then EUR14 billion (in 2021), and now the costs are estimated to exceed EUR20 billion. The EU will not provide any funding. However, there are already two train lines between Bordeaux and Toulouse. The works and the line will use more than 6,300 ha of good soils, of which 3,000 ha are forests and 370 ha are wetlands. In Toulouse, France, on December 15, 2025.
Restricted to Editorial Use Only.
Commercial use is not permitted without prior authorization.
Please contact us for more information.
First Hearing At The Administrative Court On The Content On The Legality Of The Planned LGV Highspeed Train Bordeaux-Toulouse
15 December 2025
#13099415
15 December 2025
Opponents enter the Administrative Court with a flag reading 'LGV No Thanks'. Several associations, such as 'Amis de la Terre' (i.e., 'Friends of Earth'), Stop-LGV 47, Stop-LGV 33, and LGV-No Thanks, call for a gathering in front of the main railway station of Toulouse, the Matabiau train station, just before a hearing at the Administrative Court of Toulouse to contest the legality of environmental authorizations for the planned high-speed train between Bordeaux and Toulouse. The CNPN (National Council for the Protection of Nature) says the SNCF file to build this high-speed railway is inadequate, false, and incomplete. The Environmental Authority also says there is no research on alternatives for the LGV, which is a legal duty. Moreover, the projected price tag was initially estimated at EUR10 billion for 200 km, then EUR14 billion in 2021, and now the costs are estimated to exceed EUR20 billion. The EU will not provide any funding. However, there are already two train lines between Bordeaux and Toulouse. The works and the line will use more than 6,300 hectares of good soils, including 3,000 hectares of forests and 370 hectares of wetlands. This takes place in Toulouse, France, on December 15, 2025.
Restricted to Editorial Use Only.
Commercial use is not permitted without prior authorization.
Please contact us for more information.
First Hearing At The Administrative Court On The Content On The Legality Of The Planned LGV Highspeed Train Bordeaux-Toulouse
15 December 2025
#13099411
15 December 2025
As a woman speaks into a microphone, a man holds a placard reading, ''The LGV doesn't reduce global warming, it puts on fire my rage.'' Several associations, such as 'Amis de la Terre' (i.e., 'Friends of Earth'), Stop-LGV 47, Stop-LGV 33, and LGV-No Thanks, call for a gathering in front of the main railway station of Toulouse, the Matabiau train station, just before a hearing at the Administrative Court of Toulouse to contest the legality of environmental authorizations for the planned high-speed train between Bordeaux and Toulouse. The CNPN (National Council for the Protection of Nature) says the SNCF file to build this high-speed railway is inadequate, false, and incomplete. The Environmental Authority also says there is no research on alternatives for the LGV, which is a legal duty. Moreover, the projected price tag is initially estimated at EUR10bn for 200 km, then EUR14bn (in 20214), and now, the costs are estimated to exceed EUR20bn. The EU will not provide any funding. However, there are already two train lines between Bordeaux and Toulouse. The works and the line will use more than 6,300 ha of good soils, of which 3,000 ha are forests and 370 ha are wetlands. This takes place in Toulouse, France, on December 15, 2025.
Restricted to Editorial Use Only.
Commercial use is not permitted without prior authorization.
Please contact us for more information.
First Hearing At The Administrative Court On The Content On The Legality Of The Planned LGV Highspeed Train Bordeaux-Toulouse
15 December 2025
#13099428
15 December 2025
Opponents gather at the entrance of the Administrative Court. An opponent holds a placard reading 'LGV no thanks'. Several associations such as 'Amis de la Terre' (i.e., 'Friends of Earth'), Stop-LGV 47, Stop-LGV 33, and LGV-No Thanks call for a gathering in front of the main railway station of Toulouse, the Matabiau train station, just before a hearing at the Administrative Court of Toulouse to contest the legality of environmental authorizations for the planned high-speed train between Bordeaux and Toulouse. The CNPN (National Council for the Protection of Nature) says the SNCF file to build this high-speed railway is inadequate, false, and incomplete. The Environmental Authority also says there is no research on alternatives for the LGV, which is a legal duty. Moreover, the projected price tag is initially estimated at EUR10 billion for 200 km, then EUR14 billion in 2021, and now, the costs are estimated to exceed EUR20 billion. The EU will not provide any funding. However, there are already two train lines between Bordeaux and Toulouse. The works and the line will use more than 6,300 ha of good soils, of which 3,000 ha are forests and 370 ha are wetlands in Toulouse, France, on December 15, 2025.
Restricted to Editorial Use Only.
Commercial use is not permitted without prior authorization.
Please contact us for more information.
Toulouse Appeals Court Holds Final Hearings On Legality Of Planned A69 Highway
11 December 2025
#13085500
11 December 2025
Opponents place an installation reading 'To defend a fundamental right: Code of the environment' in front of the Administrative Court of Appeal of Toulouse. A final hearing on the legality of the environmental authorizations for the planned highway A69 between Toulouse and Castres takes place in the Administrative Court of Appeal of Toulouse. Plaintiffs against the A69 ask the court to nullify all environmental authorizations given for the A69 project. Opponents gather in front of the Administrative Court of Appeal during the hearings. They argue that this highway is not legally sound, that NGE/Atosca (builders) do not respect even their own documents about ecological compensations, violence against opponents, non-compliance with regulations, etc. NGE/Atosca and the Minister of Ecology plead that this highway is 'necessary by nature' and that the first decision of the Administrative Court to scrap the authorizations is an 'anomaly'. The verdict will be given on December 30, 2025. The main association 'La Voie est Libre' (i.e., 'The Way is Free') wants the building of the highway to be stopped until all judicial decisions on the content are given. Opponents of this project say that the reprofiling of the N126 will be sufficient for the 6,000 vehicles planned per day and would cost far less money. The A69 highway will cost EUR512 million (in 2018 euros without inflation) for 54 kilometers. In Toulouse, France, on December 11, 2025.
Restricted to Editorial Use Only.
Commercial use is not permitted without prior authorization.
Please contact us for more information.
Toulouse Appeals Court Holds Final Hearings On Legality Of Planned A69 Highway
11 December 2025
#13085503
11 December 2025
An opponent holds a sheet reading 'Anacronism69'. A final hearing on the legality of the environmental authorizations for the planned highway A69 between Toulouse and Castres takes place in the Administrative Court of Appeal of Toulouse, France, on December 11, 2025. Plaintiffs against the A69 ask the court to nullify all environmental authorizations given for the A69 project. Opponents gather in front of the Administrative Court of Appeal during the hearings. They argue that this highway is not legally sound, that NGE/Atosca (builders) do not respect even their own documents about ecological compensations, violence against opponents, non-compliance with regulations, etc. NGE/Atosca and the Minister of Ecology plead that this highway is 'necessary by nature' and that the first decision of the Administrative Court to scrap the authorizations is an 'anomaly'. The verdict will be given on December 30, 2025. The main association 'La Voie est Libre' (i.e., 'The Way is Free') wants the building of the highway to be stopped until all the justice decisions on the content are given. Opponents of this project say that the reprofiling of the N126 will be sufficient for the 6,000 vehicles planned per day and would cost far less money. The A69 highway will cost EUR512 million (in 2018 euros without inflation) for 54 kilometers.
Restricted to Editorial Use Only.
Commercial use is not permitted without prior authorization.
Please contact us for more information.
#13049737
2 December 2025
A protest banner reading ''DISERTIAMO IL RIARMO / NON C'E PACE SENZA LIBERAZIONE'' (Let's desert rearmament / There is no peace without liberation) is displayed in a square in Florence, Italy, on November 22, 2025. The display represents a public political protest focusing on peace, rearmament, and liberation, set against the backdrop of daily life in Florence.
Restricted to Editorial Use Only.
Commercial use is not permitted without prior authorization.
Please contact us for more information.
#13049740
2 December 2025
A protest banner reading ''Disertiamo il riarmo - Non c'e pace senza liberazione'' (We reject rearmament - Without liberation there can be no peace) is displayed on a street where several young people sit nearby in Florence, Tuscany, Italy, on November 21, 2025. The banner calls for opposition to rearmament and links peace to liberation.
Restricted to Editorial Use Only.
Commercial use is not permitted without prior authorization.
Please contact us for more information.
#13049327
2 December 2025
A protest banner reading ''Disertiamo il riarmo - Non c'e pace senza liberazione'' (We reject rearmament - Without liberation there can be no peace) is displayed on a street where several young people sit nearby in Florence, Tuscany, Italy, on November 21, 2025. The banner calls for opposition to rearmament and links peace to liberation.
Restricted to Editorial Use Only.
Commercial use is not permitted without prior authorization.
Please contact us for more information.