Skip to main content
NurPhoto Agency Logo
  • Home
  • Editorial Pictures
    • Unrest, Conflicts and War
    • Arts, Culture and Entertainment
    • Sports

    • All Categories

    • Latest Galleries
  • Reportage
  • News of the Week
  • Videos
  • (0)
  • Login
  • Register

Search Editorial Photos

Enter keywords to search our editorial photo archive
  1. Home
  2. Search
  3. independent intellectual property rights

Refine Results

Active Filters:
Sort By
Content Type
Location
People

"independent intellectual property rights"

42 professional editorial images found

Loading search results...
The land construction of the integrated treatment platform for the second phase of the Deep-sea One project is being completed in the West C...

#10954533

Cnooc "Deep Sea One" Completed

1 February 2024

The land construction of the integrated treatment platform for the second phase of the Deep-sea One project is being completed in the West C...

#10954533

1 February 2024

The land construction of the integrated treatment platform for the second phase of the Deep-sea One project is being completed in the West Coast New Area of Qingdao, in Qingdao, Shandong province, China, on February 1, 2024. Reports indicate that the platform is utilizing 7 megawatt gas turbine generator sets and other domestic equipment that possess completely independent intellectual property rights. It is equipped with the largest domestic offshore platform slug flow catcher, designed by CNOOC, to eliminate the risk of liquid level fluctuations and blockages in oil and gas mixed transport pipelines, ensuring the reliable operation of oil and gas treatment equipment. The deep-sea No. 1 ultra-deep water gas field, which started operations in June 2021, has confirmed geological reserves of over 100 billion cubic meters. With a maximum water depth of more than 1,500 meters and a maximum well depth of over 4,000 meters, it is the deepest and most challenging offshore ultra-deep water gas field independently developed by China to date.


Restricted to Editorial Use Only.
Commercial use is not permitted without prior authorization.
Please contact us for more information.


The land construction of the integrated treatment platform for the second phase of the Deep-sea One project is being completed in the West C...

#10954534

Cnooc "Deep Sea One" Completed

1 February 2024

The land construction of the integrated treatment platform for the second phase of the Deep-sea One project is being completed in the West C...

#10954534

1 February 2024

The land construction of the integrated treatment platform for the second phase of the Deep-sea One project is being completed in the West Coast New Area of Qingdao, in Qingdao, Shandong province, China, on February 1, 2024. Reports indicate that the platform is utilizing 7 megawatt gas turbine generator sets and other domestic equipment that possess completely independent intellectual property rights. It is equipped with the largest domestic offshore platform slug flow catcher, designed by CNOOC, to eliminate the risk of liquid level fluctuations and blockages in oil and gas mixed transport pipelines, ensuring the reliable operation of oil and gas treatment equipment. The deep-sea No. 1 ultra-deep water gas field, which started operations in June 2021, has confirmed geological reserves of over 100 billion cubic meters. With a maximum water depth of more than 1,500 meters and a maximum well depth of over 4,000 meters, it is the deepest and most challenging offshore ultra-deep water gas field independently developed by China to date.


Restricted to Editorial Use Only.
Commercial use is not permitted without prior authorization.
Please contact us for more information.


The land construction of the integrated treatment platform for the second phase of the Deep-sea One project is being completed in the West C...

#10954535

Cnooc "Deep Sea One" Completed

1 February 2024

The land construction of the integrated treatment platform for the second phase of the Deep-sea One project is being completed in the West C...

#10954535

1 February 2024

The land construction of the integrated treatment platform for the second phase of the Deep-sea One project is being completed in the West Coast New Area of Qingdao, in Qingdao, Shandong province, China, on February 1, 2024. Reports indicate that the platform is utilizing 7 megawatt gas turbine generator sets and other domestic equipment that possess completely independent intellectual property rights. It is equipped with the largest domestic offshore platform slug flow catcher, designed by CNOOC, to eliminate the risk of liquid level fluctuations and blockages in oil and gas mixed transport pipelines, ensuring the reliable operation of oil and gas treatment equipment. The deep-sea No. 1 ultra-deep water gas field, which started operations in June 2021, has confirmed geological reserves of over 100 billion cubic meters. With a maximum water depth of more than 1,500 meters and a maximum well depth of over 4,000 meters, it is the deepest and most challenging offshore ultra-deep water gas field independently developed by China to date.


Restricted to Editorial Use Only.
Commercial use is not permitted without prior authorization.
Please contact us for more information.


The land construction of the integrated treatment platform for the second phase of the Deep-sea One project is being completed in the West C...

#10954536

Cnooc "Deep Sea One" Completed

1 February 2024

The land construction of the integrated treatment platform for the second phase of the Deep-sea One project is being completed in the West C...

#10954536

1 February 2024

The land construction of the integrated treatment platform for the second phase of the Deep-sea One project is being completed in the West Coast New Area of Qingdao, in Qingdao, Shandong province, China, on February 1, 2024. Reports indicate that the platform is utilizing 7 megawatt gas turbine generator sets and other domestic equipment that possess completely independent intellectual property rights. It is equipped with the largest domestic offshore platform slug flow catcher, designed by CNOOC, to eliminate the risk of liquid level fluctuations and blockages in oil and gas mixed transport pipelines, ensuring the reliable operation of oil and gas treatment equipment. The deep-sea No. 1 ultra-deep water gas field, which started operations in June 2021, has confirmed geological reserves of over 100 billion cubic meters. With a maximum water depth of more than 1,500 meters and a maximum well depth of over 4,000 meters, it is the deepest and most challenging offshore ultra-deep water gas field independently developed by China to date.


Restricted to Editorial Use Only.
Commercial use is not permitted without prior authorization.
Please contact us for more information.


The land construction of the integrated treatment platform for the second phase of the Deep-sea One project is being completed in the West C...

#10954537

Cnooc "Deep Sea One" Completed

1 February 2024

The land construction of the integrated treatment platform for the second phase of the Deep-sea One project is being completed in the West C...

#10954537

1 February 2024

The land construction of the integrated treatment platform for the second phase of the Deep-sea One project is being completed in the West Coast New Area of Qingdao, in Qingdao, Shandong province, China, on February 1, 2024. Reports indicate that the platform is utilizing 7 megawatt gas turbine generator sets and other domestic equipment that possess completely independent intellectual property rights. It is equipped with the largest domestic offshore platform slug flow catcher, designed by CNOOC, to eliminate the risk of liquid level fluctuations and blockages in oil and gas mixed transport pipelines, ensuring the reliable operation of oil and gas treatment equipment. The deep-sea No. 1 ultra-deep water gas field, which started operations in June 2021, has confirmed geological reserves of over 100 billion cubic meters. With a maximum water depth of more than 1,500 meters and a maximum well depth of over 4,000 meters, it is the deepest and most challenging offshore ultra-deep water gas field independently developed by China to date.


Restricted to Editorial Use Only.
Commercial use is not permitted without prior authorization.
Please contact us for more information.


The land construction of the integrated treatment platform for the second phase of the Deep-sea One project is being completed in the West C...

#10954538

Cnooc "Deep Sea One" Completed

1 February 2024

The land construction of the integrated treatment platform for the second phase of the Deep-sea One project is being completed in the West C...

#10954538

1 February 2024

The land construction of the integrated treatment platform for the second phase of the Deep-sea One project is being completed in the West Coast New Area of Qingdao, in Qingdao, Shandong province, China, on February 1, 2024. Reports indicate that the platform is utilizing 7 megawatt gas turbine generator sets and other domestic equipment that possess completely independent intellectual property rights. It is equipped with the largest domestic offshore platform slug flow catcher, designed by CNOOC, to eliminate the risk of liquid level fluctuations and blockages in oil and gas mixed transport pipelines, ensuring the reliable operation of oil and gas treatment equipment. The deep-sea No. 1 ultra-deep water gas field, which started operations in June 2021, has confirmed geological reserves of over 100 billion cubic meters. With a maximum water depth of more than 1,500 meters and a maximum well depth of over 4,000 meters, it is the deepest and most challenging offshore ultra-deep water gas field independently developed by China to date.


Restricted to Editorial Use Only.
Commercial use is not permitted without prior authorization.
Please contact us for more information.


The land construction of the integrated treatment platform for the second phase of the Deep-sea One project is being completed in the West C...

#10954539

Cnooc "Deep Sea One" Completed

1 February 2024

The land construction of the integrated treatment platform for the second phase of the Deep-sea One project is being completed in the West C...

#10954539

1 February 2024

The land construction of the integrated treatment platform for the second phase of the Deep-sea One project is being completed in the West Coast New Area of Qingdao, in Qingdao, Shandong province, China, on February 1, 2024. Reports indicate that the platform is utilizing 7 megawatt gas turbine generator sets and other domestic equipment that possess completely independent intellectual property rights. It is equipped with the largest domestic offshore platform slug flow catcher, designed by CNOOC, to eliminate the risk of liquid level fluctuations and blockages in oil and gas mixed transport pipelines, ensuring the reliable operation of oil and gas treatment equipment. The deep-sea No. 1 ultra-deep water gas field, which started operations in June 2021, has confirmed geological reserves of over 100 billion cubic meters. With a maximum water depth of more than 1,500 meters and a maximum well depth of over 4,000 meters, it is the deepest and most challenging offshore ultra-deep water gas field independently developed by China to date.


Restricted to Editorial Use Only.
Commercial use is not permitted without prior authorization.
Please contact us for more information.


The land construction of the integrated treatment platform for the second phase of the Deep-sea One project is being completed in the West C...

#10954540

Cnooc "Deep Sea One" Completed

1 February 2024

The land construction of the integrated treatment platform for the second phase of the Deep-sea One project is being completed in the West C...

#10954540

1 February 2024

The land construction of the integrated treatment platform for the second phase of the Deep-sea One project is being completed in the West Coast New Area of Qingdao, in Qingdao, Shandong province, China, on February 1, 2024. Reports indicate that the platform is utilizing 7 megawatt gas turbine generator sets and other domestic equipment that possess completely independent intellectual property rights. It is equipped with the largest domestic offshore platform slug flow catcher, designed by CNOOC, to eliminate the risk of liquid level fluctuations and blockages in oil and gas mixed transport pipelines, ensuring the reliable operation of oil and gas treatment equipment. The deep-sea No. 1 ultra-deep water gas field, which started operations in June 2021, has confirmed geological reserves of over 100 billion cubic meters. With a maximum water depth of more than 1,500 meters and a maximum well depth of over 4,000 meters, it is the deepest and most challenging offshore ultra-deep water gas field independently developed by China to date.


Restricted to Editorial Use Only.
Commercial use is not permitted without prior authorization.
Please contact us for more information.


The land construction of the integrated treatment platform for the second phase of the Deep-sea One project is being completed in the West C...

#10954541

Cnooc "Deep Sea One" Completed

1 February 2024

The land construction of the integrated treatment platform for the second phase of the Deep-sea One project is being completed in the West C...

#10954541

1 February 2024

The land construction of the integrated treatment platform for the second phase of the Deep-sea One project is being completed in the West Coast New Area of Qingdao, in Qingdao, Shandong province, China, on February 1, 2024. Reports indicate that the platform is utilizing 7 megawatt gas turbine generator sets and other domestic equipment that possess completely independent intellectual property rights. It is equipped with the largest domestic offshore platform slug flow catcher, designed by CNOOC, to eliminate the risk of liquid level fluctuations and blockages in oil and gas mixed transport pipelines, ensuring the reliable operation of oil and gas treatment equipment. The deep-sea No. 1 ultra-deep water gas field, which started operations in June 2021, has confirmed geological reserves of over 100 billion cubic meters. With a maximum water depth of more than 1,500 meters and a maximum well depth of over 4,000 meters, it is the deepest and most challenging offshore ultra-deep water gas field independently developed by China to date.


Restricted to Editorial Use Only.
Commercial use is not permitted without prior authorization.
Please contact us for more information.


YANTAI, CHINA - NOVEMBER 2, 2023 - A semi-submersible offshore floating photovoltaic power generation platform and ''Mirage'' offshore photo...

#10740222

China First Semi-submersible Offshore Floating Photovoltaic Power Generation Platform

2 November 2023

YANTAI, CHINA - NOVEMBER 2, 2023 - A semi-submersible offshore floating photovoltaic power generation platform and ''Mirage'' offshore photo...

#10740222

2 November 2023

YANTAI, CHINA - NOVEMBER 2, 2023 - A semi-submersible offshore floating photovoltaic power generation platform and ''Mirage'' offshore photovoltaic demonstration base for performance verification in the waters of the High-tech Zone, Yantai, Shandong Province, China, November 2, 2023. China's first semi-submersible offshore floating photovoltaic power generation platform with independent intellectual property rights is equipped with four floating body arrays, with a total installed capacity of 400kWp, which can meet the safe operation in the open sea with a wave height of 6.5 meters, a wind speed of 34 meters/second and a tidal range of 4.6 meters.


Restricted to Editorial Use Only.
Commercial use is not permitted without prior authorization.
Please contact us for more information.


YANTAI, CHINA - NOVEMBER 2, 2023 - A semi-submersible offshore floating photovoltaic power generation platform and ''Mirage'' offshore photo...

#10740224

China First Semi-submersible Offshore Floating Photovoltaic Power Generation Platform

2 November 2023

YANTAI, CHINA - NOVEMBER 2, 2023 - A semi-submersible offshore floating photovoltaic power generation platform and ''Mirage'' offshore photo...

#10740224

2 November 2023

YANTAI, CHINA - NOVEMBER 2, 2023 - A semi-submersible offshore floating photovoltaic power generation platform and ''Mirage'' offshore photovoltaic demonstration base for performance verification in the waters of the High-tech Zone, Yantai, Shandong Province, China, November 2, 2023. China's first semi-submersible offshore floating photovoltaic power generation platform with independent intellectual property rights is equipped with four floating body arrays, with a total installed capacity of 400kWp, which can meet the safe operation in the open sea with a wave height of 6.5 meters, a wind speed of 34 meters/second and a tidal range of 4.6 meters.


Restricted to Editorial Use Only.
Commercial use is not permitted without prior authorization.
Please contact us for more information.


YANTAI, CHINA - NOVEMBER 2, 2023 - A semi-submersible offshore floating photovoltaic power generation platform and ''Mirage'' offshore photo...

#10740226

China First Semi-submersible Offshore Floating Photovoltaic Power Generation Platform

2 November 2023

YANTAI, CHINA - NOVEMBER 2, 2023 - A semi-submersible offshore floating photovoltaic power generation platform and ''Mirage'' offshore photo...

#10740226

2 November 2023

YANTAI, CHINA - NOVEMBER 2, 2023 - A semi-submersible offshore floating photovoltaic power generation platform and ''Mirage'' offshore photovoltaic demonstration base for performance verification in the waters of the High-tech Zone, Yantai, Shandong Province, China, November 2, 2023. China's first semi-submersible offshore floating photovoltaic power generation platform with independent intellectual property rights is equipped with four floating body arrays, with a total installed capacity of 400kWp, which can meet the safe operation in the open sea with a wave height of 6.5 meters, a wind speed of 34 meters/second and a tidal range of 4.6 meters.


Restricted to Editorial Use Only.
Commercial use is not permitted without prior authorization.
Please contact us for more information.


TURPAN, CHINA - AUGUST 27, 2023 - A COMAC ARJ21-700 aircraft on the Tacheng-Turpan route lands at Turpan Airport in Turpan, Xinjiang provinc...

#10416562

COMAC ARJ21-700 Aircraft

27 August 2023

TURPAN, CHINA - AUGUST 27, 2023 - A COMAC ARJ21-700 aircraft on the Tacheng-Turpan route lands at Turpan Airport in Turpan, Xinjiang provinc...

#10416562

27 August 2023

TURPAN, CHINA - AUGUST 27, 2023 - A COMAC ARJ21-700 aircraft on the Tacheng-Turpan route lands at Turpan Airport in Turpan, Xinjiang province, China, Aug. 27, 2023. The ARJ21 regional jet is an aircraft with independent intellectual property rights developed by China in accordance with international standards.


Restricted to Editorial Use Only.
Commercial use is not permitted without prior authorization.
Please contact us for more information.


TURPAN, CHINA - AUGUST 27, 2023 - The crew of a COMAC ARJ21-700 aircraft on the Tacheng-Turpan route pose for a photo with the pick-up staff...

#10416564

COMAC ARJ21-700 Aircraft

27 August 2023

TURPAN, CHINA - AUGUST 27, 2023 - The crew of a COMAC ARJ21-700 aircraft on the Tacheng-Turpan route pose for a photo with the pick-up staff...

#10416564

27 August 2023

TURPAN, CHINA - AUGUST 27, 2023 - The crew of a COMAC ARJ21-700 aircraft on the Tacheng-Turpan route pose for a photo with the pick-up staff after landing at Turpan Airport in Turpan, Xinjiang province, China, Aug. 27, 2023. The ARJ21 regional jet is an aircraft with independent intellectual property rights developed by China in accordance with international standards.


Restricted to Editorial Use Only.
Commercial use is not permitted without prior authorization.
Please contact us for more information.


TURPAN, CHINA - AUGUST 27, 2023 - A COMAC ARJ21-700 aircraft flying the Tacheng-Turpan route is greeted by a ''water gate'' after landing at...

#10416566

COMAC ARJ21-700 Aircraft

27 August 2023

TURPAN, CHINA - AUGUST 27, 2023 - A COMAC ARJ21-700 aircraft flying the Tacheng-Turpan route is greeted by a ''water gate'' after landing at...

#10416566

27 August 2023

TURPAN, CHINA - AUGUST 27, 2023 - A COMAC ARJ21-700 aircraft flying the Tacheng-Turpan route is greeted by a ''water gate'' after landing at Turpan Airport in Turpan, Xinjiang province, China, August 27, 2023. The ARJ21 regional jet is an aircraft with independent intellectual property rights developed by China in accordance with international standards.


Restricted to Editorial Use Only.
Commercial use is not permitted without prior authorization.
Please contact us for more information.


TURPAN, CHINA - AUGUST 27, 2023 - A COMAC ARJ21-700 aircraft on the Tacheng-Turpan route lands at Turpan Airport in Turpan, Xinjiang provinc...

#10416568

COMAC ARJ21-700 Aircraft

27 August 2023

TURPAN, CHINA - AUGUST 27, 2023 - A COMAC ARJ21-700 aircraft on the Tacheng-Turpan route lands at Turpan Airport in Turpan, Xinjiang provinc...

#10416568

27 August 2023

TURPAN, CHINA - AUGUST 27, 2023 - A COMAC ARJ21-700 aircraft on the Tacheng-Turpan route lands at Turpan Airport in Turpan, Xinjiang province, China, Aug. 27, 2023. The ARJ21 regional jet is an aircraft with independent intellectual property rights developed by China in accordance with international standards.


Restricted to Editorial Use Only.
Commercial use is not permitted without prior authorization.
Please contact us for more information.


of 3
Next
NurPhoto Logo

Independent photojournalistic agency delivering global visual storytelling since 2013. Trusted by leading media organizations worldwide.

Company
  • About Us
  • Work With Us
  • Contact Us
  • Reportages
Services
  • Editorial Pictures
  • Assignments
  • Research Services
  • Fine Art Prints
  • Creative Content
Resources
  • License Terms
  • Terms of Service
  • Privacy Policy
  • Support Center
Connect With Us
[email protected]
24/7 Support
Follow Our Stories

© 2013-2025 NurPhoto S.r.l. All rights reserved. | VAT IT01921690663

We accept:
Click outside this window to close it