Skip to main content
NurPhoto Agency Logo
  • Home
  • Editorial Pictures
    • Unrest, Conflicts and War
    • Arts, Culture and Entertainment
    • Sports

    • All Categories

    • Latest Galleries
  • Reportage
  • News of the Week
  • Videos
  • (0)
  • Login
  • Register

Search Editorial Photos

Enter keywords to search our editorial photo archive
  1. Home
  2. Search
  3. liquid pipelines

Refine Results

Active Filters:
Sort By
Content Type
Location
People

"liquid pipelines"

47 professional editorial images found

Loading search results...
EDMONTON, CANADA - APRIL 14:
Logo of Enbridge Inc. a multinational pipeline company headquartered in Calgary, on April 14, 2024, in Edmonton...

#11151823

Daily Life In Edmonton

16 April 2024

EDMONTON, CANADA - APRIL 14:
Logo of Enbridge Inc. a multinational pipeline company headquartered in Calgary, on April 14, 2024, in Edmonton...

#11151823

16 April 2024

EDMONTON, CANADA - APRIL 14: Logo of Enbridge Inc. a multinational pipeline company headquartered in Calgary, on April 14, 2024, in Edmonton, Alberta, Canada.


Restricted to Editorial Use Only.
Commercial use is not permitted without prior authorization.
Please contact us for more information.


The land construction of the integrated treatment platform for the second phase of the Deep-sea One project is being completed in the West C...

#10954533

Cnooc "Deep Sea One" Completed

1 February 2024

The land construction of the integrated treatment platform for the second phase of the Deep-sea One project is being completed in the West C...

#10954533

1 February 2024

The land construction of the integrated treatment platform for the second phase of the Deep-sea One project is being completed in the West Coast New Area of Qingdao, in Qingdao, Shandong province, China, on February 1, 2024. Reports indicate that the platform is utilizing 7 megawatt gas turbine generator sets and other domestic equipment that possess completely independent intellectual property rights. It is equipped with the largest domestic offshore platform slug flow catcher, designed by CNOOC, to eliminate the risk of liquid level fluctuations and blockages in oil and gas mixed transport pipelines, ensuring the reliable operation of oil and gas treatment equipment. The deep-sea No. 1 ultra-deep water gas field, which started operations in June 2021, has confirmed geological reserves of over 100 billion cubic meters. With a maximum water depth of more than 1,500 meters and a maximum well depth of over 4,000 meters, it is the deepest and most challenging offshore ultra-deep water gas field independently developed by China to date.


Restricted to Editorial Use Only.
Commercial use is not permitted without prior authorization.
Please contact us for more information.


The land construction of the integrated treatment platform for the second phase of the Deep-sea One project is being completed in the West C...

#10954534

Cnooc "Deep Sea One" Completed

1 February 2024

The land construction of the integrated treatment platform for the second phase of the Deep-sea One project is being completed in the West C...

#10954534

1 February 2024

The land construction of the integrated treatment platform for the second phase of the Deep-sea One project is being completed in the West Coast New Area of Qingdao, in Qingdao, Shandong province, China, on February 1, 2024. Reports indicate that the platform is utilizing 7 megawatt gas turbine generator sets and other domestic equipment that possess completely independent intellectual property rights. It is equipped with the largest domestic offshore platform slug flow catcher, designed by CNOOC, to eliminate the risk of liquid level fluctuations and blockages in oil and gas mixed transport pipelines, ensuring the reliable operation of oil and gas treatment equipment. The deep-sea No. 1 ultra-deep water gas field, which started operations in June 2021, has confirmed geological reserves of over 100 billion cubic meters. With a maximum water depth of more than 1,500 meters and a maximum well depth of over 4,000 meters, it is the deepest and most challenging offshore ultra-deep water gas field independently developed by China to date.


Restricted to Editorial Use Only.
Commercial use is not permitted without prior authorization.
Please contact us for more information.


The land construction of the integrated treatment platform for the second phase of the Deep-sea One project is being completed in the West C...

#10954535

Cnooc "Deep Sea One" Completed

1 February 2024

The land construction of the integrated treatment platform for the second phase of the Deep-sea One project is being completed in the West C...

#10954535

1 February 2024

The land construction of the integrated treatment platform for the second phase of the Deep-sea One project is being completed in the West Coast New Area of Qingdao, in Qingdao, Shandong province, China, on February 1, 2024. Reports indicate that the platform is utilizing 7 megawatt gas turbine generator sets and other domestic equipment that possess completely independent intellectual property rights. It is equipped with the largest domestic offshore platform slug flow catcher, designed by CNOOC, to eliminate the risk of liquid level fluctuations and blockages in oil and gas mixed transport pipelines, ensuring the reliable operation of oil and gas treatment equipment. The deep-sea No. 1 ultra-deep water gas field, which started operations in June 2021, has confirmed geological reserves of over 100 billion cubic meters. With a maximum water depth of more than 1,500 meters and a maximum well depth of over 4,000 meters, it is the deepest and most challenging offshore ultra-deep water gas field independently developed by China to date.


Restricted to Editorial Use Only.
Commercial use is not permitted without prior authorization.
Please contact us for more information.


The land construction of the integrated treatment platform for the second phase of the Deep-sea One project is being completed in the West C...

#10954536

Cnooc "Deep Sea One" Completed

1 February 2024

The land construction of the integrated treatment platform for the second phase of the Deep-sea One project is being completed in the West C...

#10954536

1 February 2024

The land construction of the integrated treatment platform for the second phase of the Deep-sea One project is being completed in the West Coast New Area of Qingdao, in Qingdao, Shandong province, China, on February 1, 2024. Reports indicate that the platform is utilizing 7 megawatt gas turbine generator sets and other domestic equipment that possess completely independent intellectual property rights. It is equipped with the largest domestic offshore platform slug flow catcher, designed by CNOOC, to eliminate the risk of liquid level fluctuations and blockages in oil and gas mixed transport pipelines, ensuring the reliable operation of oil and gas treatment equipment. The deep-sea No. 1 ultra-deep water gas field, which started operations in June 2021, has confirmed geological reserves of over 100 billion cubic meters. With a maximum water depth of more than 1,500 meters and a maximum well depth of over 4,000 meters, it is the deepest and most challenging offshore ultra-deep water gas field independently developed by China to date.


Restricted to Editorial Use Only.
Commercial use is not permitted without prior authorization.
Please contact us for more information.


The land construction of the integrated treatment platform for the second phase of the Deep-sea One project is being completed in the West C...

#10954537

Cnooc "Deep Sea One" Completed

1 February 2024

The land construction of the integrated treatment platform for the second phase of the Deep-sea One project is being completed in the West C...

#10954537

1 February 2024

The land construction of the integrated treatment platform for the second phase of the Deep-sea One project is being completed in the West Coast New Area of Qingdao, in Qingdao, Shandong province, China, on February 1, 2024. Reports indicate that the platform is utilizing 7 megawatt gas turbine generator sets and other domestic equipment that possess completely independent intellectual property rights. It is equipped with the largest domestic offshore platform slug flow catcher, designed by CNOOC, to eliminate the risk of liquid level fluctuations and blockages in oil and gas mixed transport pipelines, ensuring the reliable operation of oil and gas treatment equipment. The deep-sea No. 1 ultra-deep water gas field, which started operations in June 2021, has confirmed geological reserves of over 100 billion cubic meters. With a maximum water depth of more than 1,500 meters and a maximum well depth of over 4,000 meters, it is the deepest and most challenging offshore ultra-deep water gas field independently developed by China to date.


Restricted to Editorial Use Only.
Commercial use is not permitted without prior authorization.
Please contact us for more information.


The land construction of the integrated treatment platform for the second phase of the Deep-sea One project is being completed in the West C...

#10954538

Cnooc "Deep Sea One" Completed

1 February 2024

The land construction of the integrated treatment platform for the second phase of the Deep-sea One project is being completed in the West C...

#10954538

1 February 2024

The land construction of the integrated treatment platform for the second phase of the Deep-sea One project is being completed in the West Coast New Area of Qingdao, in Qingdao, Shandong province, China, on February 1, 2024. Reports indicate that the platform is utilizing 7 megawatt gas turbine generator sets and other domestic equipment that possess completely independent intellectual property rights. It is equipped with the largest domestic offshore platform slug flow catcher, designed by CNOOC, to eliminate the risk of liquid level fluctuations and blockages in oil and gas mixed transport pipelines, ensuring the reliable operation of oil and gas treatment equipment. The deep-sea No. 1 ultra-deep water gas field, which started operations in June 2021, has confirmed geological reserves of over 100 billion cubic meters. With a maximum water depth of more than 1,500 meters and a maximum well depth of over 4,000 meters, it is the deepest and most challenging offshore ultra-deep water gas field independently developed by China to date.


Restricted to Editorial Use Only.
Commercial use is not permitted without prior authorization.
Please contact us for more information.


The land construction of the integrated treatment platform for the second phase of the Deep-sea One project is being completed in the West C...

#10954539

Cnooc "Deep Sea One" Completed

1 February 2024

The land construction of the integrated treatment platform for the second phase of the Deep-sea One project is being completed in the West C...

#10954539

1 February 2024

The land construction of the integrated treatment platform for the second phase of the Deep-sea One project is being completed in the West Coast New Area of Qingdao, in Qingdao, Shandong province, China, on February 1, 2024. Reports indicate that the platform is utilizing 7 megawatt gas turbine generator sets and other domestic equipment that possess completely independent intellectual property rights. It is equipped with the largest domestic offshore platform slug flow catcher, designed by CNOOC, to eliminate the risk of liquid level fluctuations and blockages in oil and gas mixed transport pipelines, ensuring the reliable operation of oil and gas treatment equipment. The deep-sea No. 1 ultra-deep water gas field, which started operations in June 2021, has confirmed geological reserves of over 100 billion cubic meters. With a maximum water depth of more than 1,500 meters and a maximum well depth of over 4,000 meters, it is the deepest and most challenging offshore ultra-deep water gas field independently developed by China to date.


Restricted to Editorial Use Only.
Commercial use is not permitted without prior authorization.
Please contact us for more information.


The land construction of the integrated treatment platform for the second phase of the Deep-sea One project is being completed in the West C...

#10954540

Cnooc "Deep Sea One" Completed

1 February 2024

The land construction of the integrated treatment platform for the second phase of the Deep-sea One project is being completed in the West C...

#10954540

1 February 2024

The land construction of the integrated treatment platform for the second phase of the Deep-sea One project is being completed in the West Coast New Area of Qingdao, in Qingdao, Shandong province, China, on February 1, 2024. Reports indicate that the platform is utilizing 7 megawatt gas turbine generator sets and other domestic equipment that possess completely independent intellectual property rights. It is equipped with the largest domestic offshore platform slug flow catcher, designed by CNOOC, to eliminate the risk of liquid level fluctuations and blockages in oil and gas mixed transport pipelines, ensuring the reliable operation of oil and gas treatment equipment. The deep-sea No. 1 ultra-deep water gas field, which started operations in June 2021, has confirmed geological reserves of over 100 billion cubic meters. With a maximum water depth of more than 1,500 meters and a maximum well depth of over 4,000 meters, it is the deepest and most challenging offshore ultra-deep water gas field independently developed by China to date.


Restricted to Editorial Use Only.
Commercial use is not permitted without prior authorization.
Please contact us for more information.


The land construction of the integrated treatment platform for the second phase of the Deep-sea One project is being completed in the West C...

#10954541

Cnooc "Deep Sea One" Completed

1 February 2024

The land construction of the integrated treatment platform for the second phase of the Deep-sea One project is being completed in the West C...

#10954541

1 February 2024

The land construction of the integrated treatment platform for the second phase of the Deep-sea One project is being completed in the West Coast New Area of Qingdao, in Qingdao, Shandong province, China, on February 1, 2024. Reports indicate that the platform is utilizing 7 megawatt gas turbine generator sets and other domestic equipment that possess completely independent intellectual property rights. It is equipped with the largest domestic offshore platform slug flow catcher, designed by CNOOC, to eliminate the risk of liquid level fluctuations and blockages in oil and gas mixed transport pipelines, ensuring the reliable operation of oil and gas treatment equipment. The deep-sea No. 1 ultra-deep water gas field, which started operations in June 2021, has confirmed geological reserves of over 100 billion cubic meters. With a maximum water depth of more than 1,500 meters and a maximum well depth of over 4,000 meters, it is the deepest and most challenging offshore ultra-deep water gas field independently developed by China to date.


Restricted to Editorial Use Only.
Commercial use is not permitted without prior authorization.
Please contact us for more information.


A shop along with the liquid sanitizer for buyers as Nepal government loosen lockdown during ongoing nationwide lockdown as concerns about t...

#5776908

Nepal Government Loosen Lockdown

12 June 2020

A shop along with the liquid sanitizer for buyers as Nepal government loosen lockdown during ongoing nationwide lockdown as concerns about t...

#5776908

12 June 2020

A shop along with the liquid sanitizer for buyers as Nepal government loosen lockdown during ongoing nationwide lockdown as concerns about the spread of Corona Virus (COVID-19) in Kathmandu, Nepal on Friday, June 12, 2020.


Restricted to Editorial Use Only.
Commercial use is not permitted without prior authorization.
Please contact us for more information.


Workers dig near a part of a natural gas liquids pipeline, in West Chester, PA, on March 13, 2019. The 350-mile cross-state Mariner East pip...

#3982192

Pennsylvania State Starts Criminal Investigation Into Sunoco Pipeline Project

14 March 2019

Workers dig near a part of a natural gas liquids pipeline, in West Chester, PA, on March 13, 2019. The 350-mile cross-state Mariner East pip...

#3982192

14 March 2019

Workers dig near a part of a natural gas liquids pipeline, in West Chester, PA, on March 13, 2019. The 350-mile cross-state Mariner East pipeline connects the Marcellus Shale and Utica Shale with Marcus Hook Industrial Complex in Delaware County, PA. In March Pennsylvania state attorney general and Delaware County district attorney launched criminal investigation into Sunoco Logistic Partners and Energy Transfer LP, alleging misconducts in the project realization of Mariner East Pipeline system.


Restricted to Editorial Use Only.
Commercial use is not permitted without prior authorization.
Please contact us for more information.


Warning sings mark the presence of a natural gas liquids pipeline, in West Chester, PA, on March 13, 2019. The 350-mile cross-state Mariner...

#3982206

Pennsylvania State Starts Criminal Investigation Into Sunoco Pipeline Project

14 March 2019

Warning sings mark the presence of a natural gas liquids pipeline, in West Chester, PA, on March 13, 2019. The 350-mile cross-state Mariner...

#3982206

14 March 2019

Warning sings mark the presence of a natural gas liquids pipeline, in West Chester, PA, on March 13, 2019. The 350-mile cross-state Mariner East pipeline connects the Marcellus Shale and Utica Shale with Marcus Hook Industrial Complex in Delaware County, PA. In March Pennsylvania state attorney general and Delaware County district attorney launched criminal investigation into Sunoco Logistic Partners and Energy Transfer LP, alleging misconducts in the project realization of Mariner East Pipeline system.


Restricted to Editorial Use Only.
Commercial use is not permitted without prior authorization.
Please contact us for more information.


Warning sings mark the presence of a natural gas liquids pipeline, in West Chester, PA, on March 13, 2019. The 350-mile cross-state Mariner...

#3982212

Pennsylvania State Starts Criminal Investigation Into Sunoco Pipeline Project

14 March 2019

Warning sings mark the presence of a natural gas liquids pipeline, in West Chester, PA, on March 13, 2019. The 350-mile cross-state Mariner...

#3982212

14 March 2019

Warning sings mark the presence of a natural gas liquids pipeline, in West Chester, PA, on March 13, 2019. The 350-mile cross-state Mariner East pipeline connects the Marcellus Shale and Utica Shale with Marcus Hook Industrial Complex in Delaware County, PA. In March Pennsylvania state attorney general and Delaware County district attorney launched criminal investigation into Sunoco Logistic Partners and Energy Transfer LP, alleging misconducts in the project realization of Mariner East Pipeline system.


Restricted to Editorial Use Only.
Commercial use is not permitted without prior authorization.
Please contact us for more information.


Warning sings mark the presence of a natural gas liquids pipeline, in West Chester, PA, on March 13, 2019. The 350-mile cross-state Mariner...

#3982308

Pennsylvania State Starts Criminal Investigation Into Sunoco Pipeline Project

14 March 2019

Warning sings mark the presence of a natural gas liquids pipeline, in West Chester, PA, on March 13, 2019. The 350-mile cross-state Mariner...

#3982308

14 March 2019

Warning sings mark the presence of a natural gas liquids pipeline, in West Chester, PA, on March 13, 2019. The 350-mile cross-state Mariner East pipeline connects the Marcellus Shale and Utica Shale with Marcus Hook Industrial Complex in Delaware County, PA. In March Pennsylvania state attorney general and Delaware County district attorney launched criminal investigation into Sunoco Logistic Partners and Energy Transfer LP, alleging misconducts in the project realization of Mariner East Pipeline system.


Restricted to Editorial Use Only.
Commercial use is not permitted without prior authorization.
Please contact us for more information.


Warning sings mark the presence of a natural gas liquids pipeline, in West Chester, PA, on March 13, 2019. The 350-mile cross-state Mariner...

#3982316

Pennsylvania State Starts Criminal Investigation Into Sunoco Pipeline Project

14 March 2019

Warning sings mark the presence of a natural gas liquids pipeline, in West Chester, PA, on March 13, 2019. The 350-mile cross-state Mariner...

#3982316

14 March 2019

Warning sings mark the presence of a natural gas liquids pipeline, in West Chester, PA, on March 13, 2019. The 350-mile cross-state Mariner East pipeline connects the Marcellus Shale and Utica Shale with Marcus Hook Industrial Complex in Delaware County, PA. In March Pennsylvania state attorney general and Delaware County district attorney launched criminal investigation into Sunoco Logistic Partners and Energy Transfer LP, alleging misconducts in the project realization of Mariner East Pipeline system.


Restricted to Editorial Use Only.
Commercial use is not permitted without prior authorization.
Please contact us for more information.


of 3
Next
NurPhoto Logo

Independent photojournalistic agency delivering global visual storytelling since 2013. Trusted by leading media organizations worldwide.

Company
  • About Us
  • Work With Us
  • Contact Us
  • Reportages
Services
  • Editorial Pictures
  • Assignments
  • Research Services
  • Fine Art Prints
  • Creative Content
Resources
  • License Terms
  • Terms of Service
  • Privacy Policy
  • Support Center
Connect With Us
[email protected]
24/7 Support
Follow Our Stories

© 2013-2026 NurPhoto S.r.l. All rights reserved. | VAT IT01921690663

We accept:
Click outside this window to close it