Skip to main content
NurPhoto Agency Logo
  • Home
  • Editorial Pictures
    • Unrest, Conflicts and War
    • Arts, Culture and Entertainment
    • Sports

    • All Categories

    • Latest Galleries
  • Reportage
  • News of the Week
  • Videos
  • (0)
  • Login
  • Register

Search Editorial Photos

Enter keywords to search our editorial photo archive
  1. Home
  2. Search
  3. width four meters

Refine Results

Active Filters:
Sort By
Content Type
Location
People

"width four meters"

791 professional editorial images found

Loading search results...
Children play with giant figures inside the M&M'S store in London, England. One of the largest candy stores in the world, it has more than 3...

#12688232

London Daily Life

29 August 2025

Children play with giant figures inside the M&M'S store in London, England. One of the largest candy stores in the world, it has more than 3...

#12688232

29 August 2025

Children play with giant figures inside the M&M'S store in London, England. One of the largest candy stores in the world, it has more than 3,000 square meters spread over four floors.


Restricted to Editorial Use Only.
Commercial use is not permitted without prior authorization.
Please contact us for more information.


Nepal Prime Minister KP Sharma Oli addresses the inauguration ceremony of Nepal's first overpass in Lalitpur, Nepal, on June 20, 2025. The l...

#12489789

First Overpass Of Nepal Inaugurated

20 June 2025

Nepal Prime Minister KP Sharma Oli addresses the inauguration ceremony of Nepal's first overpass in Lalitpur, Nepal, on June 20, 2025. The l...

#12489789

20 June 2025

Nepal Prime Minister KP Sharma Oli addresses the inauguration ceremony of Nepal's first overpass in Lalitpur, Nepal, on June 20, 2025. The long-awaited overpass is built to ease chronic traffic congestion along the Koteshwar-Gwarko-Kalanki corridor of the Kathmandu Valley. Initiated in February 2022 under the engineering, procurement, and construction (EPC) model, the four-lane overpass is originally slated for completion in two years. From Gwarko intersection, the structure spans 320 meters towards Koteshwar and 185 meters towards Satdobato, with both sides featuring four layers of blacktopping. The ramp stands 10.2 meters high. The project is awarded at a contract value of Rs176.68 million. Once operational, the contractor is responsible for the maintenance for the next five years.


Restricted to Editorial Use Only.
Commercial use is not permitted without prior authorization.
Please contact us for more information.


Nepal Prime Minister KP Sharma Oli (center holding the bouquet) arrives to attend the inauguration ceremony of Nepal's first overpass in Lal...

#12489790

First Overpass Of Nepal Inaugurated

20 June 2025

Nepal Prime Minister KP Sharma Oli (center holding the bouquet) arrives to attend the inauguration ceremony of Nepal's first overpass in Lal...

#12489790

20 June 2025

Nepal Prime Minister KP Sharma Oli (center holding the bouquet) arrives to attend the inauguration ceremony of Nepal's first overpass in Lalitpur, Nepal, on June 20, 2025. The overpass is built to ease chronic traffic congestion along the Koteshwar-Gwarko-Kalanki corridor of the Kathmandu Valley. Initiated in February 2022 under the engineering, procurement, and construction (EPC) model, the four-lane overpass is originally slated for completion in two years. From Gwarko intersection, the structure spans 320 meters towards Koteshwar and 185 meters towards Satdobato, with both sides featuring four layers of blacktopping. The ramp stands 10.2 meters high. The project is awarded at a contract value of Rs176.68 million. Once operational, the contractor is responsible for the maintenance for the next five years.


Restricted to Editorial Use Only.
Commercial use is not permitted without prior authorization.
Please contact us for more information.


Nepal Prime Minister KP Sharma Oli (Center) unveils the plaque during the inauguration ceremony of Nepal's first overpass in Lalitpur, Nepal...

#12489791

First Overpass Of Nepal Inaugurated

20 June 2025

Nepal Prime Minister KP Sharma Oli (Center) unveils the plaque during the inauguration ceremony of Nepal's first overpass in Lalitpur, Nepal...

#12489791

20 June 2025

Nepal Prime Minister KP Sharma Oli (Center) unveils the plaque during the inauguration ceremony of Nepal's first overpass in Lalitpur, Nepal, on June 20, 2025. The long-awaited overpass is built to ease chronic traffic congestion along the Koteshwar-Gwarko-Kalanki corridor of the Kathmandu Valley. Initiated in February 2022 under the engineering, procurement, and construction (EPC) model, the four-lane overpass is originally slated for completion in two years. From Gwarko intersection, the structure spans 320 meters towards Koteshwar and 185 meters towards Satdobato, with both sides featuring four layers of blacktopping. The ramp stands 10.2 meters high. The project is awarded at a contract value of Rs176.68 million. Once operational, the contractor is responsible for the maintenance for the next five years.


Restricted to Editorial Use Only.
Commercial use is not permitted without prior authorization.
Please contact us for more information.


Nepal Prime Minister KP Sharma Oli (second right from center) attends the inauguration ceremony of Nepal's first overpass in Lalitpur, Nepal...

#12489792

First Overpass Of Nepal Inaugurated

20 June 2025

Nepal Prime Minister KP Sharma Oli (second right from center) attends the inauguration ceremony of Nepal's first overpass in Lalitpur, Nepal...

#12489792

20 June 2025

Nepal Prime Minister KP Sharma Oli (second right from center) attends the inauguration ceremony of Nepal's first overpass in Lalitpur, Nepal, on June 20, 2025. The overpass is built to ease chronic traffic congestion along the Koteshwar-Gwarko-Kalanki corridor of the Kathmandu Valley. Initiated in February 2022 under the engineering, procurement, and construction (EPC) model, the four-lane overpass is originally slated for completion in two years. From Gwarko intersection, the structure spans 320 meters towards Koteshwar and 185 meters towards Satdobato, with both sides featuring four layers of blacktopping. The ramp stands 10.2 meters high. The project is awarded at a contract value of Rs176.68 million. Once operational, the contractor is responsible for the maintenance for the next five years.


Restricted to Editorial Use Only.
Commercial use is not permitted without prior authorization.
Please contact us for more information.


Nepal Prime Minister KP Sharma Oli (center) attends the inauguration ceremony of Nepal's first overpass in Lalitpur, Nepal, on June 20, 2025...

#12489793

First Overpass Of Nepal Inaugurated

20 June 2025

Nepal Prime Minister KP Sharma Oli (center) attends the inauguration ceremony of Nepal's first overpass in Lalitpur, Nepal, on June 20, 2025...

#12489793

20 June 2025

Nepal Prime Minister KP Sharma Oli (center) attends the inauguration ceremony of Nepal's first overpass in Lalitpur, Nepal, on June 20, 2025. The overpass is built to ease chronic traffic congestion along the Koteshwar-Gwarko-Kalanki corridor of the Kathmandu Valley. Initiated in February 2022 under the engineering, procurement, and construction (EPC) model, the four-lane overpass is originally slated for completion in two years. From the Gwarko intersection, the structure spans 320 meters towards Koteshwar and 185 meters towards Satdobato, with both sides featuring four layers of blacktopping. The ramp stands 10.2 meters high. The project is awarded at a contract value of Rs176.68 million. Once operational, the contractor is responsible for the maintenance for the next five years.


Restricted to Editorial Use Only.
Commercial use is not permitted without prior authorization.
Please contact us for more information.


A general overview of the newly built flyover in Gwarko of Lalitpur along the ring road of Kathmandu Valley on June 19, 2025. The long-await...

#12486534

Nepal's First Overpass Road Infrastructure In Gwarko Ready For Operation

19 June 2025

A general overview of the newly built flyover in Gwarko of Lalitpur along the ring road of Kathmandu Valley on June 19, 2025. The long-await...

#12486534

19 June 2025

A general overview of the newly built flyover in Gwarko of Lalitpur along the ring road of Kathmandu Valley on June 19, 2025. The long-awaited overpass is built to ease chronic traffic congestion along the Koteshwar-Gwarko-Kalanki corridor of the Kathmandu Valley. Initiated in February 2022 under the engineering, procurement, and construction (EPC) model, the four-lane overpass is originally slated for completion in two years. From Gwarko intersection, the structure spans 320 meters towards Koteshwar and 185 meters towards Satdobato, with both sides featuring four layers of blacktopping. The ramp stands 10.2 meters high. The project is awarded at a contract value of Rs176.68 million. Once operational, the contractor is responsible for the maintenance for the next five years.


Restricted to Editorial Use Only.
Commercial use is not permitted without prior authorization.
Please contact us for more information.


People walk and cycle over the newly built overpass infrastructure in Gwarko of Lalitpur, on June 19, 2025. The long-awaited overpass is bui...

#12486535

Nepal's First Overpass Road Infrastructure In Gwarko Ready For Operation

19 June 2025

People walk and cycle over the newly built overpass infrastructure in Gwarko of Lalitpur, on June 19, 2025. The long-awaited overpass is bui...

#12486535

19 June 2025

People walk and cycle over the newly built overpass infrastructure in Gwarko of Lalitpur, on June 19, 2025. The long-awaited overpass is built to ease chronic traffic congestion along the Koteshwar-Gwarko-Kalanki corridor of the Kathmandu Valley. Initiated in February 2022 under the engineering, procurement, and construction (EPC) model, the four-lane overpass is originally slated for completion in two years. From Gwarko intersection, the structure spans 320 meters towards Koteshwar and 185 meters towards Satdobato, with both sides featuring four layers of blacktopping. The ramp stands 10.2 meters high. The project is awarded at a contract value of Rs176.68 million. Once operational, the contractor is responsible for the maintenance for the next five years.


Restricted to Editorial Use Only.
Commercial use is not permitted without prior authorization.
Please contact us for more information.


A girl cycles over the newly built overpass infrastructure in Gwarko of Lalitpur, Nepal, on June 19, 2025. The long-awaited overpass is buil...

#12486536

Nepal's First Overpass Road Infrastructure In Gwarko Ready For Operation

19 June 2025

A girl cycles over the newly built overpass infrastructure in Gwarko of Lalitpur, Nepal, on June 19, 2025. The long-awaited overpass is buil...

#12486536

19 June 2025

A girl cycles over the newly built overpass infrastructure in Gwarko of Lalitpur, Nepal, on June 19, 2025. The long-awaited overpass is built to ease chronic traffic congestion along the Koteshwar-Gwarko-Kalanki corridor of the Kathmandu Valley. Initiated in February 2022 under the engineering, procurement, and construction (EPC) model, the four-lane overpass is originally slated for completion in two years. From Gwarko intersection, the structure spans 320 meters towards Koteshwar and 185 meters towards Satdobato, with both sides featuring four layers of blacktopping. The ramp stands 10.2 meters high. The project is awarded at a contract value of Rs176.68 million. Once operational, the contractor is responsible for the maintenance for the next five years.


Restricted to Editorial Use Only.
Commercial use is not permitted without prior authorization.
Please contact us for more information.


People pose for a photo standing over the newly built overpass infrastructure in Gwarko, Lalitpur, on June 19, 2025. The long-awaited overpa...

#12486537

Nepal's First Overpass Road Infrastructure In Gwarko Ready For Operation

19 June 2025

People pose for a photo standing over the newly built overpass infrastructure in Gwarko, Lalitpur, on June 19, 2025. The long-awaited overpa...

#12486537

19 June 2025

People pose for a photo standing over the newly built overpass infrastructure in Gwarko, Lalitpur, on June 19, 2025. The long-awaited overpass is built to ease chronic traffic congestion along the Koteshwar-Gwarko-Kalanki corridor of the Kathmandu Valley. Initiated in February 2022 under the engineering, procurement, and construction (EPC) model, the four-lane overpass is originally slated for completion in two years. From Gwarko intersection, the structure spans 320 meters towards Koteshwar and 185 meters towards Satdobato, with both sides featuring four layers of blacktopping. The ramp stands 10.2 meters high. The project is awarded at a contract value of Rs176.68 million. Once operational, the contractor is responsible for the maintenance for the next five years.


Restricted to Editorial Use Only.
Commercial use is not permitted without prior authorization.
Please contact us for more information.


People walk and cycle over the newly built overpass infrastructure in Gwarko of Lalitpur, on June 19, 2025. The long-awaited overpass is bui...

#12486538

Nepal's First Overpass Road Infrastructure In Gwarko Ready For Operation

19 June 2025

People walk and cycle over the newly built overpass infrastructure in Gwarko of Lalitpur, on June 19, 2025. The long-awaited overpass is bui...

#12486538

19 June 2025

People walk and cycle over the newly built overpass infrastructure in Gwarko of Lalitpur, on June 19, 2025. The long-awaited overpass is built to ease chronic traffic congestion along the Koteshwar-Gwarko-Kalanki corridor of the Kathmandu Valley. Initiated in February 2022 under the engineering, procurement, and construction (EPC) model, the four-lane overpass is originally slated for completion in two years. From Gwarko intersection, the structure spans 320 meters towards Koteshwar and 185 meters towards Satdobato, with both sides featuring four layers of blacktopping. The ramp stands 10.2 meters high. The project is awarded at a contract value of Rs176.68 million. Once operational, the contractor is responsible for the maintenance for the next five years.


Restricted to Editorial Use Only.
Commercial use is not permitted without prior authorization.
Please contact us for more information.


A man jogs over the newly built overpass infrastructure in Gwarko of Lalitpur on June 19, 2025. The long-awaited overpass is built to ease c...

#12486539

Nepal's First Overpass Road Infrastructure In Gwarko Ready For Operation

19 June 2025

A man jogs over the newly built overpass infrastructure in Gwarko of Lalitpur on June 19, 2025. The long-awaited overpass is built to ease c...

#12486539

19 June 2025

A man jogs over the newly built overpass infrastructure in Gwarko of Lalitpur on June 19, 2025. The long-awaited overpass is built to ease chronic traffic congestion along the Koteshwar-Gwarko-Kalanki corridor of the Kathmandu Valley. Initiated in February 2022 under the engineering, procurement, and construction (EPC) model, the four-lane overpass is originally slated for completion in two years. From Gwarko intersection, the structure spans 320 meters towards Koteshwar and 185 meters towards Satdobato, with both sides featuring four layers of blacktopping. The ramp stands 10.2 meters high. The project is awarded at a contract value of Rs176.68 million. Once operational, the contractor is responsible for the maintenance for the next five years.


Restricted to Editorial Use Only.
Commercial use is not permitted without prior authorization.
Please contact us for more information.


People walk and cycle over the newly built overpass infrastructure in Gwarko of Lalitpur, on June 19, 2025. The long-awaited overpass is bui...

#12486540

Nepal's First Overpass Road Infrastructure In Gwarko Ready For Operation

19 June 2025

People walk and cycle over the newly built overpass infrastructure in Gwarko of Lalitpur, on June 19, 2025. The long-awaited overpass is bui...

#12486540

19 June 2025

People walk and cycle over the newly built overpass infrastructure in Gwarko of Lalitpur, on June 19, 2025. The long-awaited overpass is built to ease chronic traffic congestion along the Koteshwar-Gwarko-Kalanki corridor of the Kathmandu Valley. Initiated in February 2022 under the engineering, procurement, and construction (EPC) model, the four-lane overpass is originally slated for completion in two years. From Gwarko intersection, the structure spans 320 meters towards Koteshwar and 185 meters towards Satdobato, with both sides featuring four layers of blacktopping. The ramp stands 10.2 meters high. The project is awarded at a contract value of Rs176.68 million. Once operational, the contractor is responsible for the maintenance for the next five years.


Restricted to Editorial Use Only.
Commercial use is not permitted without prior authorization.
Please contact us for more information.


People pose for a photo standing over the newly built overpass infrastructure in Gwarko, Lalitpur, on June 19, 2025. The long-awaited overpa...

#12486541

Nepal's First Overpass Road Infrastructure In Gwarko Ready For Operation

19 June 2025

People pose for a photo standing over the newly built overpass infrastructure in Gwarko, Lalitpur, on June 19, 2025. The long-awaited overpa...

#12486541

19 June 2025

People pose for a photo standing over the newly built overpass infrastructure in Gwarko, Lalitpur, on June 19, 2025. The long-awaited overpass is built to ease chronic traffic congestion along the Koteshwar-Gwarko-Kalanki corridor of the Kathmandu Valley. Initiated in February 2022 under the engineering, procurement, and construction (EPC) model, the four-lane overpass is originally slated for completion in two years. From Gwarko intersection, the structure spans 320 meters towards Koteshwar and 185 meters towards Satdobato, with both sides featuring four layers of blacktopping. The ramp stands 10.2 meters high. The project is awarded at a contract value of Rs176.68 million. Once operational, the contractor is responsible for the maintenance for the next five years.


Restricted to Editorial Use Only.
Commercial use is not permitted without prior authorization.
Please contact us for more information.


Cycles are parked over the newly built overpass infrastructure in Gwarko of Lalitpur on June 19, 2025. The long-awaited overpass is built to...

#12486542

Nepal's First Overpass Road Infrastructure In Gwarko Ready For Operation

19 June 2025

Cycles are parked over the newly built overpass infrastructure in Gwarko of Lalitpur on June 19, 2025. The long-awaited overpass is built to...

#12486542

19 June 2025

Cycles are parked over the newly built overpass infrastructure in Gwarko of Lalitpur on June 19, 2025. The long-awaited overpass is built to ease chronic traffic congestion along the Koteshwar-Gwarko-Kalanki corridor of the Kathmandu Valley. Initiated in February 2022 under the engineering, procurement, and construction (EPC) model, the four-lane overpass is originally slated for completion in two years. From Gwarko intersection, the structure spans 320 meters towards Koteshwar and 185 meters towards Satdobato, with both sides featuring four layers of blacktopping. The ramp stands 10.2 meters high. The project is awarded at a contract value of Rs176.68 million. Once operational, the contractor is responsible for the maintenance for the next five years.


Restricted to Editorial Use Only.
Commercial use is not permitted without prior authorization.
Please contact us for more information.


People pose for a photo standing over the newly built overpass infrastructure in Gwarko, Lalitpur, on June 19, 2025. The long-awaited overpa...

#12486543

Nepal's First Overpass Road Infrastructure In Gwarko Ready For Operation

19 June 2025

People pose for a photo standing over the newly built overpass infrastructure in Gwarko, Lalitpur, on June 19, 2025. The long-awaited overpa...

#12486543

19 June 2025

People pose for a photo standing over the newly built overpass infrastructure in Gwarko, Lalitpur, on June 19, 2025. The long-awaited overpass is built to ease chronic traffic congestion along the Koteshwar-Gwarko-Kalanki corridor of the Kathmandu Valley. Initiated in February 2022 under the engineering, procurement, and construction (EPC) model, the four-lane overpass is originally slated for completion in two years. From Gwarko intersection, the structure spans 320 meters towards Koteshwar and 185 meters towards Satdobato, with both sides featuring four layers of blacktopping. The ramp stands 10.2 meters high. The project is awarded at a contract value of Rs176.68 million. Once operational, the contractor is responsible for the maintenance for the next five years.


Restricted to Editorial Use Only.
Commercial use is not permitted without prior authorization.
Please contact us for more information.


of 50
Next
NurPhoto Logo

Independent photojournalistic agency delivering global visual storytelling since 2013. Trusted by leading media organizations worldwide.

Company
  • About Us
  • Work With Us
  • Contact Us
  • Reportages
Services
  • Editorial Pictures
  • Assignments
  • Research Services
  • Fine Art Prints
  • Creative Content
Resources
  • License Terms
  • Terms of Service
  • Privacy Policy
  • Support Center
Connect With Us
[email protected]
24/7 Support
Follow Our Stories

© 2013-2025 NurPhoto S.r.l. All rights reserved. | VAT IT01921690663

We accept:
Click outside this window to close it